




已阅读5页,还剩1页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
EMC AX4-5更换控制器(v 1.0)作者陈亮审核分类EMC子类AX4-5更新时间2014-1-13关键字EMC AX4-5更换控制器 摘要主要适用环境EMC AX4-5版本说明版本号拟制/修改责任人拟制/修改日期修改内容/理由V1.0陈亮2014-4-28新建Replacing a DPE-AX Storage ProcessorDescribes how to replace a storage processor module in a DPE-AX.NoteYou will remove the I/O module from the failed SP module and install it on the replacement SP module.Handling FRUsRemoving a DPE-AX storage processor (SP)CautionThe SP comes completely out of the storage-system chassis. In addition to holding the latches, be prepared to support the SP to avoid dropping it.1Remove any cables (fibre optic, expansion, LAN, SPS) that are attached to the component.TipLabel the cables, so that you will know where to reconnect them.2Locate the left and right latches. (Orange tabs cover the latches.)3Pinch the latches and pull them to the sides to eject the module from the chassis.4Pull the module straight out and place it on a static-free surface.Removing the SP top cover1Press the blue button on the cover and push it back a 1/4 inch.2Lift the cover up.Removing the I/O module from the failed SPNoteYou will install this I/O module on the replacement SP module.1Lift the blue latch carefully until it ejects the module from the connector.2Lift the module out and away from the canister.Installing the I/O module on the new SP moduleNoteInstall the I/O module that you removed from the failed SP module.1Angle the module slightly to fit it into the canister and align it with the blue alignment pins.CautionDo not attempt to seat the I/O module into the CPU connector while you are holding the I/O module at an angle. Doing so will damage the connections. The I/O module should be laying flat before you attempt to seat the connection.3With the module aligned and parallel to the CPU board, press the latch down to fully seat the module in the connector.Replacing theSP top cover1Align the cover tabs with the notches in the canister.2Slide it forward 1/4 inch until the tab secures the cover.Installing the new DPE-AX storage processor (SP)NoteMake sure the latches are pulled out and kept in the open position.1Align the SP module with the enclosure opening and push it straight in.The latches begin to close when they contact the chassis edges.2Close the right and left latches to fully seat the SP in the enclosure.An audible click indicates that the latches are secure.3Reconnect the cables that you removed.Verifying the operation of a new or replaced part1In the navigation pane, underView, clickComponents2Scan the list of components to verify that all components are recognized and working properly.Returning the failed par
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 医院消毒试题(附答案)
- 2025年施工员之装修施工基础知识考试题库(含答案)
- 2024年四川公务员考试《行测》真题及答案
- 标本制作基础知识培训课件
- 柴油基础知识培训总结
- 柱平法钢筋结构课件
- 中毒病人的诊疗、急救与护理考核试题及答案
- 2024年法考必考题含答案
- 低空经济对传统交通运输业的替代效应
- 2025年唐山乐亭县事业单位招聘考试笔试试卷【附答案】
- PDCA质量持续改进案例一:降低ICU非计划拔管发生率
- 做一名优秀教师课件
- 商场开荒保洁计划书
- 初中道德与法治 九年级(维护祖国统一)初中道德与法治九年级作业设计样例
- 幼儿园绘本故事:《骄傲的大公鸡》 课件
- 江西省赣州市于都县2022-2023学年九年级化学第一学期期中监测试题含解析
- 新冠核酸检测实验室PCR管八联管滤芯吸头等耗材质检和储存程序
- DBJ 53-T-46-2012 云南省城镇道路及夜景照明工程施工验收规程
- 西方文明史(第五版)英文版全书ppt完整版课件整本书电子教案最全教学教程
- 通止规、环通止规检查记录表
- 非器质性失眠症临床路径
评论
0/150
提交评论