




已阅读5页,还剩1页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
EMC AX4-5更换控制器(v 1.0)作者陈亮审核分类EMC子类AX4-5更新时间2014-1-13关键字EMC AX4-5更换控制器 摘要主要适用环境EMC AX4-5版本说明版本号拟制/修改责任人拟制/修改日期修改内容/理由V1.0陈亮2014-4-28新建Replacing a DPE-AX Storage ProcessorDescribes how to replace a storage processor module in a DPE-AX.NoteYou will remove the I/O module from the failed SP module and install it on the replacement SP module.Handling FRUsRemoving a DPE-AX storage processor (SP)CautionThe SP comes completely out of the storage-system chassis. In addition to holding the latches, be prepared to support the SP to avoid dropping it.1Remove any cables (fibre optic, expansion, LAN, SPS) that are attached to the component.TipLabel the cables, so that you will know where to reconnect them.2Locate the left and right latches. (Orange tabs cover the latches.)3Pinch the latches and pull them to the sides to eject the module from the chassis.4Pull the module straight out and place it on a static-free surface.Removing the SP top cover1Press the blue button on the cover and push it back a 1/4 inch.2Lift the cover up.Removing the I/O module from the failed SPNoteYou will install this I/O module on the replacement SP module.1Lift the blue latch carefully until it ejects the module from the connector.2Lift the module out and away from the canister.Installing the I/O module on the new SP moduleNoteInstall the I/O module that you removed from the failed SP module.1Angle the module slightly to fit it into the canister and align it with the blue alignment pins.CautionDo not attempt to seat the I/O module into the CPU connector while you are holding the I/O module at an angle. Doing so will damage the connections. The I/O module should be laying flat before you attempt to seat the connection.3With the module aligned and parallel to the CPU board, press the latch down to fully seat the module in the connector.Replacing theSP top cover1Align the cover tabs with the notches in the canister.2Slide it forward 1/4 inch until the tab secures the cover.Installing the new DPE-AX storage processor (SP)NoteMake sure the latches are pulled out and kept in the open position.1Align the SP module with the enclosure opening and push it straight in.The latches begin to close when they contact the chassis edges.2Close the right and left latches to fully seat the SP in the enclosure.An audible click indicates that the latches are secure.3Reconnect the cables that you removed.Verifying the operation of a new or replaced part1In the navigation pane, underView, clickComponents2Scan the list of components to verify that all components are recognized and working properly.Returning the failed par
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025广西来宾市忻城县政府投资审计中心招聘见习生2人模拟试卷及完整答案详解1套
- 2025湖南岳阳市平江县事业单位第一批公开选调工作人员考前自测高频考点模拟试题及一套答案详解
- 2025年上半年四川绵阳市游仙区考核招聘教师31人考前自测高频考点模拟试题及1套参考答案详解
- 2025河南商丘市民权县消防救援大队招聘政府专职消防员32人模拟试卷及参考答案详解1套
- 2025海南白沙黎族自治县机关事务服务中心招聘公益性岗位人员2人考前自测高频考点模拟试题附答案详解
- 2025年阜阳颍上县人民医院引进博士研究生2人考前自测高频考点模拟试题附答案详解(完整版)
- 2025年轧钢导卫装置项目合作计划书
- 2025广东中共中山市委政法委员会所属事业单位招聘事业单位人员4人模拟试卷及完整答案详解一套
- 2025内蒙古鄂尔多斯生态环境职业学院人才引进38人考前自测高频考点模拟试题带答案详解
- 2025年福建省龙岩市武平县乡村人才振兴招聘10人模拟试卷及参考答案详解
- 企业财务制度规范范本合集
- 2025员工试用期间合同范本下载
- Unit4WonderfulseasonsGetreadyandstartup(课件)-外研版英语四年级上册
- 仓库人员安全培训模板课件
- 2025年气道相关管理试题及答案(EICU)
- 资产招商运营管理办法
- 邮政管理毕业论文
- 血透室医院感染课件
- T-CNCIA 01039-2025 丙烯酸酯副产甲基磺酸钠
- (2025年标准)ktv保安合同协议书
- 2025麻精药品培训考试试题(含参考答案)
评论
0/150
提交评论