全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
AFRICAN MINERALS LTD SWI 0454 Page 1 of 4 024 April 10First Issue Rev DateDescription of RevisionCheckedApproved SAFE WORK INSTRUCTION AIR POLLUTION AND DUST CONTROL Document Custodian Manager HSE Document Checked Document Approved TABLE OF CONTENTS 1 DISTRIBUTION2 2 SCOPE2 3 REFERENCE2 4 DEFINITIONS2 5 PROCEDURE2 5 1Identification2 5 2Methods of Air Dust Control3 5 2 1Haul Roads and Work Areas3 5 2 2Vehicles Plant and Equipment3 5 2 3Stockpiles3 5 2 4Chemical and Ozone Depleting Substances3 5 2 5Monitoring and Control4 6 APPENDICES FORMS4 Nil SAFE WORK INSTRUCTIONSWI 0454 AIR POLLUTION AND DUST CONTROLRevision 2 Page 2 AFRICAN MINERALS LTD 1 DISTRIBUTION There are no restrictions on the distribution of this procedure within the Company 2 SCOPE This procedure details the activities to ensure that air dust pollution sources are identified and controlled to meet project and legislative requirements 3 REFERENCE Nil 4 DEFINITIONS Nil 5 PROCEDURE 5 1Identification Prior to construction the Construction Manager will determine air pollution and dust generation limits based on statutory safety and environmental and project specific requirements Allowable limits will be documented in the Project HSE Plan or Construction Environmental Management Plan Prior to commencement of works the Construction Manager in conjunction with the Project HSE Coordinator PHSEC shall identify the likely construction air pollution and dust sources for the project Management strategies will be developed for managing these sources so that the construction air pollution and dust generation limits are not exceeded Management strategies will be documented in the Project HSE Plan or Construction Environmental Management Plan Where the Construction Manager determines that a baseline survey of pre existing air dust levels is required prior to commencement of construction works the PHSEC shall determine the air dust monitoring locations and times recommend an agency to conduct the survey Upon completion of the baseline level survey the Construction Manager shall review the report in conjunction with the potential air dust levels likely to be generated on the project and determine the course of action required SAFE WORK INSTRUCTIONSWI 0454 AIR POLLUTION AND DUST CONTROLRevision 2 Page 3 AFRICAN MINERALS LTD 5 2Methods of Air Dust Control 5 2 1Haul Roads and Work Areas The primary method of controlling dust generated by construction operations will be water sprayed by water tankers Crushed rock may also be used in areas of high traffic volume The PHSEC in conjunction with the respective Supervisor shall determine the frequency of passes and number of water tankers based on the following weather conditions drying rates volume of traffic extent of stripping area extent of unprotected areas During working hours the Supervisor shall ensure that water tankers are available and operating at the frequency times and locations specified Tanker operators shall water the areas at the speed and duration specified Water tankers shall be filled at the end of each day to ensure prompt commencement next day The Supervisor shall monitor the weather forecast to ensure that sufficient water tankers are available to provide additional support for dust control should extended periods of high winds be expected 5 2 2Vehicles Plant and Equipment The PHSEC shall check all site vehicles plant and equipment on arrival for smoke and dust emission levels Vehicles plant and equipment exhibiting visual smoke for prolonged periods shall not be used until repairs have been carried out 5 2 3Stockpiles The Construction Manager shall ensure that stockpiles are managed to minimise dust generation through use of the following techniques as appropriate materials are graded to a smooth finish and watered to encourage the formation of a hard crust stockpiles are not disturbed unnecessarily loose material likely to be airborne is watered frequently by sprinklers or water tankers stockpiles are covered stockpiles are revegetated with an appropriate groundcover The Construction Manager or delegate shall monitor stockpile conditions daily 5 2 4Chemical and Ozone Depleting Substances On receipt of any chemicals on site the PHSEC shall ensure that the container s are sealed or securely covered Chemical items which are subject to prolonged storage shall be periodically checked by the PHSEC to ensure lids and covers are secure The PHSEC shall ensure that any process using ozone depleting substances eg CFC 113 are identified and handled by accredited refrigeration recycling organisations SAFE WORK INSTRUCTIONSWI 0454 AIR POLLUTION AND DUST CONTROLRevision 2 Page 4 AFRICAN MINERALS LTD 5 2 5Monitoring and Control Environmental Management strategies for the project with respect to air pollution and dust control shall be documented in the Project HSE Plan or Construction Environmental Management Plan Specific work instruction ITPs and checklists will be developed as required to ensure these strategies are correctly implemented and documented The Construction Manager or nominated delegate is responsible ensuring that works are completed and monitored in accordance with the Project HSE Plan or Construction Environmental Management Plan requirements Typical construction activities control measures and performance criteria are included in the table below Sources of Air DustControl MeasuresFrequencyCriteria Excavation ClearingSprays from water trucksDry condition 1 pass per 2 hours No visual dust Stockpiles subjected to strong winds Hose sprays on stockpiles Dry and windy 1 pass per day No visual dust Hauling operationsSprays from water trucksDry condition 1 pass per day No visual dust Vehicle emissionsCheck pollution levelOn arrival at site and once per month Smoke not visible after 10 secs Piling operationsCheck pollution levelOn arrival at si
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 暗竖井-施工方案
- 春节机舱活动策划方案
- 噪音是施工方案
- 火牛插件营销方案
- 处方和医嘱管理制度
- 沥青球场施工方案
- 2025年海洋渔业现代化船舶监控系统数据安全评估知识考察试题及答案解析
- 2025年国开河南电大《中国现当代文学名著导读》终考任务我要考试试题及答案
- 2025年国家医师资格考试实践技能考试考官培训考核试题及答案
- 2025-2030中国液体化工物流行业政策演变与趋势预判报告
- GB/T 12967.4-2022铝及铝合金阳极氧化膜及有机聚合物膜检测方法第4部分:耐光热性能的测定
- 测量不确定度评定考试题答案
- 西溪国家湿地公园规划设计分析课件
- 气管软化试验课件
- 广东区域地质构造简介之一-断裂特征介绍
- 鱼骨流程图模板
- 董事、监事、高级管理人员信息
- 110kV二线圈变压器交接验收(大修后)试验作业指导书
- 浙江政采云网上超全一张网供应商承诺书
- 《电路原理》课后习习题答案
- 闪购模式介绍PPT
评论
0/150
提交评论