此文档收集于网络,如有侵权,请联系网站删除CSPC NANHAI PETROCHEMICALS PROJECTCSPC 南海石化项目 BACKFILLING OF OIL TANK FOUNDATION油 罐 砂 石 基 础 施 工WORK INSTRUCTION: WI-8710-8100-0005 SEPCO Electric Power Construction Corporation山东电力基本建设总公司REV版次DATE日期REASON FOR ISSUE修订原因BY编制CHKD审核REVIEW审查APPR批准A20.Aug.2003Issued for ApprovalZhao.KCao.ALLin.HDing.PS0028.Aug.2003Issued for UseZhao.KCao.ALLin.HDing.PS0113.Sep.2003Issued for ApprovalZhao.KCao.ALLiu.QYDing.PS精品文档目 录content1.目的 purpose2.范围 scope3.职责 responsibilities4.参考文件 references5.计量器具、工具、机械 tools and equipment6.劳动力组织 labors7.施工工序和施工方法 procedure and method8.附件 attachment1.0范围 scope本程序适用于CSPC 南海石化项目Steam & Power生产区油罐砂石基础施工。It applies to backfilling of oil tank foundation for CSPC Nanhai Petrochemical Project Steam and Power Generation Plant.2.0目的 Purpose规定SEPC01在CSPC南海石化项目中油罐基础砂石回填的执行标准,以有效的控制回填过程及质量。To specify the standard applicable for the backfilling for the project so as to effectively control the quality of backfilling.3.0职责 responsibilities技术负责人 Engineering supervisor 宋辉施工负责人 Construction superintendent 许德利测量安全 Survey safety 张胜利质检员 Quality inspector 高见技术员 Technician 赵克施工员 Construction supervisor 卜现刚3.1 SEPC1建筑队负责对砂石回填的全过程进行管理。 Sepco1 civil team is responsible for the management and control of backfilling.3.2砂石回填班组负责制安全施工措施,并予以执行。 Backfilling group is responsible for working out the safety measure and the implementation.3.3 SEPC1施工部对砂石回填的施工措施进行审核,并在作业过程中进行监督指导。 Sepco1 Construction Dept is responsible for the review of the construction measures and the surveillance of implementing.3.4 SEPC1 HSE部对砂石回填的安全措施进行审核,并检查现场安全防护措施。 SEPC1 HSE for the review of the safety measure and the inspection of safety prevention actions.3.5砂石回填班组技术负责人员如有需要,负责办理受限空间施工许可证。The technician of the backfill group for requesting work permit if required.3.6 SEPC1管理人员及施工单位的负责人应坚守岗位,发现异常问题,立即报告或采取救援措施。Sepco1 management and subcontractors supervisor shall keep watch the site for handling any problems potentially arisen. 3.7检测中心负责压实遍数、含水率的确定及压实系数的检测。The test center for the inspection of compacting times, water content and compaction factor.4.0参考文件 references4.1相关设计图纸;related design drawings4.2与施工图纸相关的设计变更文件;design change notes4.3 GB50202-20024.4 SP-8310-0000-0010 EARTHWORK SPECIFICATION4.5 PR-8710-8100-0013 SITE EXCAVATION AND BACKFILL5.0计量器具、工具及机械 tools and equipment计量器具:水准仪、钢卷尺Measuring instrument: level and tape工具:小推车。 Tool: wheelbarrow 机械:YZ-18振碾式压路机一台、装载机一台、振动式打夯机一台、抽水机5台(所有机械进厂前应进行认真检查,并报有关部门审查通过后方能进入现场施工)machines: 1 roller, 1 loader, 1 rammer,5 water pumps.6.0劳动力组织 labors技术员1人,施工员1人,测量员1名、安全员1名,质检员1名,壮工20名,熟练操作工3名。1 technician, 1 supervisor, 1 surveyor, 1 HSE member, 1 inspector, 20 labors and 3 operators.7.0施工工序和施工方法 procedure and method7.1施工工序 procedure砂石回填施工工序为:材料入场(带试验合格证/拌合报告) 验槽检查材料含水率(5.3%),并提供报告砂石回填(每30cm一层) 砂石碾压(68次) 每层检查并取样试验,并提交压实率试验报告 压实率合格(压实率96%)后进行上一层砂石回填重复上述步骤,直至回填至设计标高。Ingress of the material to the job site (with the material test certificate/blend report) conformity inspection for base groundinspection of water content(5.3%) of material and check report issued backfilling (30cm each layer) compaction(68 times) final inspection and check report issued for compact rate of each layer proceed to backfilling if the compact rate meet requirements (Compact Rate96%).Repeat above steps till the design elevation.7.2施工方法 method7.2.1回填材料要求 requirement of backfilling materials回填材料为购买搅拌好的砂石(碎石、卵石最大粒径20mm,砂:中粗砂且细度模数2.33.7,混合料中碎石、卵石含量40%)。拌合料进场前,应提供碎石、砂的试验报告,并对配合后的混合料进行检测。取样进行击实试验,并采用筛析法进行级配试验。Material is mixed sand and gravel at a portion of 40% of gravel and scree (Diameter of gravel and scree20mm, sand defined as medium and coarse sand with fineness modulus range 2.33.7). Before ingress of the material to the job site, the test report of the sand and gravel should be furnished. And the material after blend should be tested. Compaction test and grading test shall be carried out as well.7.2.2基底处理 base treatment 回填前先清理基底,清除基坑内积水、淤泥和杂物,并防止地表滞水流入回填区域。清理完毕,进行基坑验收,符合要求方可进行砂石回填。The base shall be cleared, without any water, sullage and debris. The surface water shall be prevented into the backfilled area. The groundwork of the footing groove check before acceptance, and it should be acceptable before backfilling.7.2.3碎石回填 gravel backfilling7.2.3.1正式回填前,现场进行试碾,确定压实遍数及含水率,以达到最好的碾压效果。试碾后,根据确定的压实遍数及含水率进行大面积施工。To carry out trial compaction before backfilling to determine the compaction times and water content to get a optimum effect.7.2.3.2碎石料场布置见附件(碎石堆放布置及入口设置)。Gravel storage arrangement see attachment.7.2.3.3基坑修设机械通道见附件(碎石堆放布置及入口设置)。The access for machines see attachment.7.2.3.4本项施工采用机械回填,在振碾式压路机碾压之前先用装载机将碎石推平,使表面平实,后使用振碾式压路机先静压,后振压。This work is to be implemented by machines. First to level the gravel, then compact without vibration by road roller, finally vibrantly compact the soil.7.2.3.5碾压机械压实填方时,控制行驶速度,并控制压实遍数。The compaction speed and times shall be controlled.7.2.3.6采用“薄填、慢驶、多次”的方法,砂石回填厚度为300mm,碾压方向从两边逐渐压向中间,碾轮每次重叠宽度约为1525cm,避免漏压。运行中碾轮边距填方边缘大于500mm,防止溜坡倾倒。边角、边坡边缘压实不到之处,辅以振动式打夯机夯实。每碾压一层完后,用装载机将表面拉毛以利结合。The method of “ thin layer, slow speed and many times” is to be used. The layer thickness is to be 30mm, and compaction from two sides to the center with overlapped width of 15-25cm of each time. The wheel side shall be 500 mm away from the edge to prevent any upsetting. The rammer is to be used for the places where the roller couldnt reach. The surface of last layer shall be made coarse by loader shovel for sound incorporation with next layer.7.2.3.7根据确定的碾压遍数进行施工,保证遍数足够,控制砂石料的含水率(在试碾后采用灌砂法测定最优含水率为5.3%),保证砂石回填达到要求。Compaction should be according to the determinate times and guarantee the compaction times. The water content of the material should be controlled (the optimum water content of 5.3% is to be determined test) , and the backfilling should be up to standard.7.2.3.8砂石回填区保持中间稍高,两边稍低,当天回填砂石当天压实。The center of the backfilled area shall be a little bit higher than the sides, and the backfilled gravel and sand shall be compacted in the same day.7.2.3.9每层材料压实后,按要求进行取样检测,发布检测报告,压实率必须96%,方可进行下层施工。振碾机碾压区域密度及含水率试验每层5组,振动打夯机夯实区域密度及含水率试验每层1组。Quality inspection shall be taken, including Inspect Report Form which indicating the Compact Rate for each layer, and the standard (Compact Rate96%) must be attained, before backfilling the next layer. Sampling for unit weight and water content test in the area compacted be vibrating roller shall be 5 groups each layer, while sampling in the area by rammer is to be 1 group each layer.7.2.4施工排水和雨季施工措施Construction drain, and measures during rainy season7.2.4.1基坑周围设挡水坝(高度至少50cm),防止地表水流入回填区域内。Claybank(the height50cm) should be used to prevent the surface water from flowing into the backfillin

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论