0.5T净水处理系统使用说明书.doc_第1页
0.5T净水处理系统使用说明书.doc_第2页
0.5T净水处理系统使用说明书.doc_第3页
0.5T净水处理系统使用说明书.doc_第4页
0.5T净水处理系统使用说明书.doc_第5页
已阅读5页,还剩21页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

此文档收集于网络,如有侵权,请联系网站删除500升/小时净水处理系统 500 l / h pure water treatment system 使用说明书Manual北京海德能科技有限公司Energy Technology Co., Ltd. Beijing Hyde电话:086hone :086司地址:北京市通州区次渠镇经海七路一号光联工业园区二区二号Address: Town, Tongzhou District, Beijing views the Drainage Road No. 7 by the sea of light district on the 2nd Joint Industrial Park II目 录CONTENTS一、系统说明31.the system shows3二、安装说明.4Second. Installation instructions4三、操作说明.6third. instructions 6四、系统常见故障排除15fourth. the system common trouble shooting. 10五、水处理设备污染紧急清洗.12fifth. Water Treatment Equipment Pollution Emergency cleaning12六、水处理设备的停运保护17sixth.water treatment equipment outage protection.17七、设备参数.19seventh, device parameters719八、设备随机配件单20Eighth.Equipment accessories. Random20一、系统说明System本系统是以江河、湖泊、地下水作为水源(水源应无明显浑浊物),采用多级膜法处理。标准产水量500升/小时。The system is based on rivers, lakes, groundwater as a source of water (no water turbid material), multi-stage membrane treatment. Standard Production Capacity 500 l / hour.按每人/每天需要3升水计算,标准产水量每天可满足4000-5000人的需求。精滤系统在正常工作状态下做为反渗透系统的前处理,用于保护反渗透膜,提高设备使用寿命。Per person 3 liters of water every day to calculate the normal production of water per day can meet4000-5000 population. Ultrafiltration system as the pre-treatment of reverse osmosis system in normal working conditions, used to protect the reverse osmosis and enhance equipment life.反渗透系统出水水质达到国标饮用净水水质标准(CJ94-2005)理化指标。water quality of Reverse osmosis systems : the national standard, Drinking Water Quality Standards (CJ94-2005) physical.系统流程:System process:原水通过原水泵进入粗滤过滤器,过滤精度20m,过滤出大颗粒杂质、泥砂、悬浮物;再输送到一级精密过滤器,过滤精度10m,过滤出小颗粒杂质、絮状物、胶体等;经过一级精密滤器的水进入二级精密滤器,过滤精度1m,过滤更小的杂质,病菌,胶体,铁锈及大分子有机物等物质;经过净化的水通过高压泵加压进入反渗透系统,生产出纯净水。filtration accuracy filter of Rough filtration is of 20m, to filter out large particle impurities, sediment, suspended solids;then go to first class ultrafilter, filter rating 10m, the little particle impurity, colloid will be filtered out; after first class filter then come into second ultrafilter, filter rating 1m, filt less colloid,germina,colloid,rust and big particles organic matter, etc. water after purified go through high pressure pump go into RO system, produce pure water.二、安装说明Second. Installation instructions1、 选择水源地附近较平整的空地,将设备主机固定,关闭万向轮开关。 1, select the water source near the ground than the flat, the device host fixed, shutdown The Moxianglun switch.2、 在主机附近选择一个稍高平台(若无平台可以放置一张桌子代替平台)放置自升式纯水箱(便于灌装取水)。2.Put the jack-up pure water container on the a little higher platform close to main machine, its easy to take water. ( a table can instead of the platform if there is no platform )3、 将取水接口后放入自升式原水箱中,将原水箱出口与原水泵接口C2连接(注意:1英寸管,长为2米,两头带快接);连接废水接口C4(注意:1英寸管长为5米,不带快接),要求排水通畅;将纯水出口C3与纯水箱进口连接(注意:1/2英寸管,长为3米,两头带快接);将灌装口与纯水箱出口连接注意:(1/2英寸管,长为2米,带快接和阀门)。put the taking water mouth into the jack-up raw water container, then connect raw water box outlet with raw water pump interface C2. ( caution: 1 inch pipe, 2 meters length, quick union in two ends ); connect waste water interface C4(caution: 1 inch pipe, 5 meters length, without quick union), require drain fluently, connect pure water outlet C3 with pure water box inlet( caution:1/2 inch pipe, 3 meters length, with quick union in 2 ends); connect fill water mouth with pure water box outlet(caution: 1/2 inch pipe, 2 meters length, with quick union and valve)4、检查所有管路连接处是否密封,所有接触点是否连接牢固。4,Check all pipe joints are sealed, all the contacts are securely connected.5、打开配电箱,检查所有连接点是否牢固,将380V,50Hz电源连接到接口11、12、13、N;连接地线D5。5,open the distribution box, check all connections are solid, the 380V, 50Hz power supply connected to the interface, 11,12,13, N, connecting ground D5. 6、反渗透膜元件的装入 RO membrance module load在膜元件装入压力容器之前,准备好必要的工具、材料和防护用品,如活扳手、内六角扳手,一字螺丝刀、甘油、橡皮锤、手套等。按用户光盘的方法取下压力容器顶端的端板,将压力容器清洗、擦拭干净,并用毛巾或海绵浸甘油均匀涂抹压力容器内壁,使内壁润滑,便于膜元件的装入。Before load RO module, get necessary tools, material, and protective articles ready, for example, clyburn spanner, socket head wrench, Straight Screwdriver, Glycerin, rubber mallet, glove and so on. Take down end plate on the top of pressure vessel according to user CD, wash pressure vessel, wipe it clean, and use towel or sponge wipe inner of pressure vessel and make it lubricate easy to load membrane module. (1) 反渗透膜组件安装前的准备:Preparation of RO loading 清除供水管内的垃圾、油、金属粉可根据需要进行配管系统内的药品清洗或注入清洗剂(设备出厂前以做初步清理)。Make clear of rubbish, oil, metal powder based on requirement of cleaner( equiptment did basic cleansing before leaving plant) 供给水质的确认:至少要对压力容器通水30min,确认反渗透膜的供给水是否符合要求。对于聚酰胺复合膜,要确认无残留游离氯存在。Supply water quality confirmation: watering no less than 30min for pressure vessel, confirm if RO supply water fulfill requirement. Make sure there is no Dissociation chlorine to Gathers the amide compound membrane. 必要零部件的准备:从纸板箱内的附件盒里将零部件取出。先确认膜元件的附属零部件及必要数量,见下表:Necessary spare parts: take out spare sparts in box from pure wooden crate. Confirm necessary spare parts number of membrane module, as follow sheet:零部件名称Necessary spare parts name盐水密封垫圈Seawater seal washer连接配件Connection fittings必要数量Necessary number11注释:该配件已安装Note: fittings installed压力容器内部的检查: 取下压力容器上端的端板。用干净水冲洗已打开的压力容器,并将容器内部的垃圾或异物除去。Internal inspection of pressure vessel: take out end plate on the top of pressure vessel, wash clean opened pressure vessel, and make clear internal rubbish.(2) 反渗透膜元件的安装RO membrane module loading 从纸板箱中取出膜元件,拆去塑料包装袋。Take out membrance module, then take down plastic sack.查看盐水密封圈是否安装(盐水密封圈一般在膜出厂前已安装好);若没安装请在膜元件上安装盐水密封圈:盐水密封的方向如图4-1所示。如果逆向安装则不能发挥其作用,务请注意.Check seawater seal packing collar(seawater seal packing collar is loaded before leaving plant); please load seawater seal packing collar, Direction as shown in Figure 4-1. Caution: anti direction loading is not allowed. 装填膜元件:将膜元件带盐水密封圈的一端从压力容器的顶端插入,将元件的2/3慢慢推入,进行如图42、图43所示。这时,要注意勿触及压力容器的边缘。Loading membrane module: put seawater seal packing collar side in pressure vessel, put 2/3 slowly, same as figure 4-2, and 4-3. dont touch vessel edge.装填后续膜元件:重复步骤 (图4-2-图4-3)直到所有元件都装入压力容器内,元件和压力容器的长度决定装填数量本套设备每支压力容器装填1支膜元件。Load following part: Redundant step(picture 4-2-picture 4-3) until put all parts in pressure vessel, parts and vessel length decide membrane loading number, loading 1 piece of membrane module every pressure vessel in this system. 安装供给水侧的端板:根据用户光盘的方法,在压力容器的供给水侧安装上端板。Load end plate of water supply: load end plate at pressure vessel supply water side according to user CD.连接好端板处的管道。Connect end plate pipeline well.(3) 装填膜元件后的检查Inspection 通水确认:仔细检查管配件接续是否正确、螺丝是否拧紧后再开始进行通水试验,通水时要注意尽量让水压慢慢上升。Watering confirmation: check whether pipeline connection correct, Whether the screw does screw tight, then start to watering test, try to make water pressure go up slowly when watering. 调整至设定的产水量和回收率:密切注意给水、浓缩水的流量计的同时,调整到设定的制水量和回收率,如果没有压力损失或其他问题时,让这种运行状态持续lh。Adjust to set Water yield and returns-ratio, meanwhile Watch out for gives the water, the thick shrinkage flowmeter. Keep this running situation 1h if there is no pressure lost or other problems. 检查膜透过水水质:将各膜组件的透过水进行采样以检查水质(电导率)。如有水质异常的膜组件,就必须再次检查O形圈、盐水密封圈等,更换不良的零部件。Check water quality pass through membrane: take sample tp test quality. Check 0 shape ring, seawater seal packing collar, etc if water quality is unnormal, change bad spare parts.注意事项Caution:(1)在使用膜元件前请勿捅破塑料包装袋。膜元件装填到压力容器时请参照相关技术资料。Dont damage membrane plastic package. Loading membrane into pressure vessel according to technical data.(2)新装入的膜元件要低压进水,最好浸泡1小时,以使膜元件充分适应水质和水温后再进入调度阶段。New membrane module require Low pressure water supply, soaking 1h is better to make membrane module full adapt to water quality and water temperature, then go to adjustment stage.(3)新投入使用的反渗透膜元件从初始性能过渡到稳定状态需要一定的时间,这一时间的长短取决于膜元件的储存条件和正确的启动程序,大约需要一周的时间。通常反渗透膜元件的脱盐率在其投入运行后的几小时到几天内将不断升高,然后长期处于稳定状态。The new membrane module need some time from initial performance to the steady state, the time is decided membrane module storage condition and Correct start-up procedure, about need one week. Normally, RO membrane module desalinization ratio will Elevates unceasingly from running several hours to several days, then will be at the steady state for a long time.7、安装完毕后,在试水过程中,要密切注意以下问题:7,After installation, test the water in the process, should pay close attention to the following questions:A.泵电机转向是否正确(如电机反正,请调换电机接线中任意两相)A, the pump motor is turned to the right (such as motor anyway, please exchange electrical wiring in any two-phase)B当取水点落差大于5米,水平距离大于8米时,需安装备用自吸泵及备用原水箱;当取水点落差小于5米,水平距离小于8米时,直接连接设备上的原水泵。B,When the water point drop more than 5 meters, the horizontal distance greater than 8 meters, to install a spare pump and backup of the original water tank; when the intake gap is less than 5 meters, the horizontal distance of less than 8 meters, directly connected devices the original water pump.三、操作说明third. instructions1. 水处理设备操作步骤1. Water Treatment Equipment steps1.1水处理设备固定好,关上万向轮的刹车开关;1.1 Water treatment equipment fixed, and closed the caster brake switch;1.2连接好接地线D5;1.2 connect the ground wire D5;1.3连接进水接口C2(无色带金属软管);1.3 connection C2 (no ribbon metal hose);1.4连接纯水接口C3(无色带金属软管);1.4 Connect water interface C3 (no ribbon metal hose);1.5连接浓水接口C4(无色带金属软管);1.5 connection C4 (no ribbon metal hose);1.6接上总进电电源(380V)11、12、13(电机反转可倒相)、N,推上漏电保护器;1.6 total into the power supply connected (380V) 11、12、13 (motor reversal reversible phase)、N, onto leakage protection device;1.7把总电源旋转开关A1扳到启动位置,指示灯A01亮;1.7 The total power pull rotary switch to the start position A1, A01 indicator light;1.8把自吸泵旋转开关A2扳到启动位置,指示灯A02亮(自吸泵备用开关);1.8 Self-Priming pull rotary switch to the start position A2, A02 indicator light;1.9把原水泵旋转开关A3扳到启动位置,指示灯A03亮;1.9 high-pressure pumps pull rotary switch to the start position A3, A03 indicator light;1.10把高压水泵旋转开关A4扳到启动位置,指示灯A04亮;1.10 Revolve the switch A4 to high pressure water pump to pull start position, the indicator A04 is bright1.11设备启动后,系统开启自动清洗功能为时间30秒(可设置);1.11device activated, the system auto-cleaning function for the open time was 30 seconds (can be set);1.12调节反渗透膜浓水调节阀C4至产水流量计B6为8.4LPM(此时产水量为500L/h),压力表B4显示为0.7-1.3MPa左右。 1.12 adjust RO strong water regulating valve C4,and produce water flowmeter B6 to 8.4LPM (water production rate is 500L/h), pressure is about 0.7-1.3MPa. 1.13设备首次使用冲洗1至2小时,将水全部排放掉。1.13First use of flushing 1.14 equipment 1-2 hours, water discharge off all.1.14 设备运行每隔30分钟自动冲洗30秒(间隔时间可调)。1.14 every 30 seconds automaticly wash,wash time is 30 seconds.(time interval is adjustable)注:1. 务必保证自吸泵管道与自吸泵密封性良好1 Must ensure a good seal pump pipe and pump2设备正常停机2. Normal shutdown equipment1)将高压水泵旋转开关A4扳到停止位置;1)The high-pressure pump pull rotary switch to the stop position A4;2)将原水泵旋转开关A3扳到停止位置;2) Revolve a raw water pump the switch A3 to pull stop position3)将自吸泵旋转开关A2扳到停止位置(自吸泵开关为备用开关);3) Pulls self-priming pump turn switch A2 to the stop position (self-priming pump switch for emergency switch) 4)将总电源旋转开关A1扳到停止位置;4) Will always pull the power rotary switch to the stop position A1;5)将漏电保护器QM开关断开。5)QM leakage protection switch will disconnect.3设备故障停机3. Equipment downtime当水处理设备高压泵入口压力低时,设置在高压泵进口部位的低压开关自动断开,设备停机,查找进水量不足的原因并查看粗滤、精滤是否被污堵。在消除上述可能故障后可重新启动。When water treatment equipment, high pressure pump inlet pressure is low, set in the import of high-pressure pump low pressure switch to automatically disconnect parts, equipment downtime, to find the causes of insufficient amount of water and coarse filtration, secondary filter Shipi sewage blocked. Failure to eliminate possible after the restart.当水处理设备高压泵出口压力高时,设置在高压泵出口部位的高压开关自动断开,设备停机。检查浓水调节阀开关度是否过量及检查反渗透膜是否污堵。在消除上述可能故障后可重新启动。When the water treatment equipment, high pressure pump outlet pressure is high, set in the high pressure pump outlet pressure switch automatically disconnected parts, equipment downtime. Check strong water regulating valve switch and RO membrane, then restart system after eliminate all possible fault. 4. 粗滤、精滤过滤器滤芯的更换: 初次运行时, 根据原水的水质,若水质比较混浊时,每隔1小时或2小时检查一次,根据污染情况,清洗或更换滤芯。更换滤芯时,需打开顶端排气阀排气。以后再根据实际情况,来自行确定检查或更换的频次。 4. Rough filtration, secondary filter cartridge replacement:When first run, according to raw water quality, if the water is quite cloudy, 1 hour or 2 hours every once in accordance with the pollution, clean or replace filter. Replace the filter, the need to open the top row of the exhaust valve. Later according to the actual situation, from the line to determine the frequency of inspection or replacement.四、系统常见故障排除fourth. the system common trouble shooting1、开机时原水泵不启动,或反转1. raw water pump does not start at boot time, or reverse1)检查三相电源是否缺相;1) Check whether the lack of phase three-phase power; 2)测量电压是否达到380V。2) whether the measured voltage is 380V. 3)三相电源是否倒相,调换3相接头中的任意2相。3) three-phase power is inverted, transposed three-phase connection of any 2-phase.3、开机时高压泵不启动3.high-pressure pump does not start at boot time 1)检查三相电源是否缺相。1) Check whether the lack of three-phase power supply phase.2)检查进水压力表B1,进水压力是否在0.08Mpa以上或水路是否畅通;2) Check the water pressure gauge B1, water pressure is above or in 0.08Mpa water is smooth;3)缓慢调节浓水调节阀C4至膜前压力表B4为0.7-1.3MPa左右;3) slowly adjust the concentration of water regulating valve before the pressure gauge B4 C4 to the membrane was about 0.7-1.3MPa;4)低压开关是否连接好,调节低压开关使压力在0.050.07Mpa之间;4) Low-voltage switch is connected to regulate the low pressure switch to between 0.050.07Mpa; 5)压力表B1-B2压差大于0.1 Mpa时,检查粗滤过滤器的滤袋是否堵塞,及时更换滤袋;5) B1-B2 pressure difference bigger than 0.1Mpa, check whether rough filter pocket jam or not, change it in time. 4、纯水产量下降到设计的85%4. reduce pure water produce quantity to 85% of design1)进水温度过低;1) inlet water temperature is too low;2)压力表B4的压力是否在控制在0.7-1.3MPa,调节浓水调节阀C4;2) whether the pressure gauge B4 control in 0.7-1.3MPa, water regulating valve regulating concentrated C4;3)源水进水量不足;3) lack of source water into the water;4)反渗透膜污堵,清洗反渗透膜,更换精滤膜。4) when RO membrane is dirty, wash RO membrane and change rough filter membrane. 5、出水水质变差5. water quality deterioration1)进水水质不稳定;1) water quality unstable;2)反渗透膜壳堵头O形圈损坏,更换受损O形圈;2) reverse osmosis membrane shell plug O-ring is damaged, replace the damaged O-ring;3)反渗透膜,用药剂清洗膜元件。3) reverse osmosis membranes, membrane components with chemical cleaning.五、水处理设备污染紧急清洗Fifth. Water Treatment Equipment Pollution Emergency cleaning放一个100升的清洗箱,将浓水调节阀C4、纯水阀门C3全部打开,将浓水软管、进水软管和纯水软管放入清洗箱中,循环清洗。先用设备所产的纯水冲洗10-30分钟,用12%的柠檬酸溶液(调整PH值不低于 2.0),只开自吸泵低压力大流量冲洗1-3小时,如污染严重应浸泡6-12小时,再冲洗0.5-1小时 ;将系统用纯水冲洗干净,再按0.1%比例配好氢氧化钠(NaOH)溶液,调整PH值不高于 12.0,低压力大流量冲洗1-3小时,如污染严重应浸泡6-12小时,在用净水冲洗0.5-1小时,重新启动设备生产。100L clear tank washer, open strong water regulating valve C4 and pure water valve C3, put strong water soft pipe, inlet water soft pipe and pure water soft pipe in washer, recycle wash. First pure water wash 20-30 minutes, then use 12% Solution of citrate (PH value is no less than 2.0), only open self-priming pump, adjust to low pressure, big flux to wash 1-3 hours. When pollution is serious shall sink 6-12 hours, wash 0.5-1 hour again; after system is washed clean by pure water,according to 0.1% rate to mix NaOH liquid , PH value is no more than 12.0. low pressure and big flux to wash 1-3 hours,sink 6-12 hours if pollution is too serious, then use clean water to wash 0.5-1 hour, restart system.六、水处理设备的停运保护sixth.water treatment equipment outage protection设备长期停用15天以上,用设备所产的纯水冲洗1-2小时,,然后采用2%的甲醛(HCHO)溶液,或用1%的亚硫酸氢钠(NaHSO3)的水溶液进行保养,将保护液打入管路中(应尽量排出设备、管路中的空气), 关闭所有的进出口阀,保证设备、管路密封完好,Equipment more than 15 days long-term disabled, equipment wash water produced in 1-2 hours, and then with 2% formaldehyde (HCHO) solution, or 1% sodium bisulfite (NaHSO3) aqueous solution maintenance, will protect the liquid into the pipe (should be discharged equipment, piping in the air), turn off all the import and export of valves to ensure that equipment, pipe seal intact,设备长期停用建议使用北京海德能公司专用杀菌剂HY-220,清洗剂:HY-410 HY-420 反渗透膜保护液:HY-310Recommend the use of long-term disabled equipment to the company-specific fungicides Beijing Hyde HY-220, cleaning agents: HY-410 HY-420 Reverse Osmosis Membrane Protection Solution: HY-310七、设备参数seventh, device parameters电压: 380V 频率: 50HZ Voltage: 380V Frequency: 50HZ原水泵功率:0.75KW 高压泵功率: 1.5KWraw water pump power: 0.75KW high-pressure pump power: 1.5KW总功率: 2.25KW 启动功率:4.5KW Total power: 2.25KW Start power: 4.5KW设备参数:重量: 0.125T Weight: 0.125T设备尺寸:7806801445mmEquipment Size: 780 680 1445mm粗滤滤芯型号 HY-DF-20-3 Crude membrane model HY-DF-20-3精滤滤芯型号 HY-WF-40-1Secondary filter model HY-WF-40-1反渗透膜型号CPA2-4040Model CPA2-4040 reverse osmosis membrane八、设备随机配件单序号名称型号数量备注1进水管1英寸20米(抱箍2个)2原水管1英寸2米(快接头2个,抱箍4个)3浓水管1英寸4米(抱箍2个)4纯水管1/2英寸3米(快接头2个,抱箍4个)5灌装管1/2英寸2米(快接头2个,抱箍4个,阀门1个)6粗滤滤芯20英寸20um10个7精滤滤芯40英寸110um20支8总电缆线三相五线制10米2.5mm29内六角扳手1个10工具箱1个11AB胶水4套12密封袋3卷13十字螺丝刀200mm1把14一字螺丝刀200mm1把15试电笔1把16开口扳手6-241套17活扳手250mm1把18尖嘴钳1把19电工胶带(黑)1卷20说明书1套21装箱单1份22合格单1份23自升式水箱1000L2个Serial

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论