




已阅读5页,还剩11页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
marketing strict internal cost control, business and innovation performance. -Increasing electricity access, price increase, electricity supply is guaranteed. In 2012, the company with coal inventory, get rewards of Jiangsu provincial government power to 266 million kWh. Through the small and bilateral trade, access to electricity 1.695 billion kWh, seeking removal compensation when the power 50 million-kilowatt, 116% market share in Jiangsu Province ranked first in the same capacity, the same type units. Company closely tracked coal linkage policies on July 1 and August 20 respectively increase prices 2.08 minutes and 2.5 points, profitability increased significantly. 公 . Job grading, remuneration of labour agreements into long-term contract workers compensation system, stimulating the enthusiasm of the staff. -Further strengthening of human resources management. Full implementation of the performance appraisal regulations, incentive effect. Complete the reserve cadre evaluation and selection, produced 10 primary reserve cadres and 11 secondary reserve cadres. Implementation of operation staff induction gang system, 14 staff posts be promoted. Strengthening the cultivation of professional technical leaders, selected coverage 9 13 factory-level professional and technical leaders. To enhance staff skills training, 8 staff technicians. Labor contract law compliance, contracts of up to 100%. -Star team-building to advance further. Establish a holding system implementation, and promoting the whole team-building goals, strengthen group management. Team building into a performance review, promoting the construction of the star team depth. This year, respectively, 1 track, 4 team four star rated five-star by Datang and the team. Four, insists on six cultural construction of harmonious development, really good job of party construction and the independent Commission against corruption, strengthening the humanistic care and psychological counseling, the enterprise culture construction to a new level. -Building of enterprise culture is fruitful. Companies adhere to the Shenhua lead of corporate culture, culture of responsibility at the core, to safety culture, a culture of learning, ethical culture, cost culture culture system-assisted, through various cultural integration, has boosted business centre, this year has won the Chinese cultural management advanced unit, National Advanced Unit in the building of enterprise culture of reform and opening up 30 and other honorary titles. The liability of the company culture: solving management problems of corporate culture project was awarded the CEC national electric power enterprise culture achievement award of excellence. The accident early warning and prevention system was rated as Chinas power of innovation management, innovation management of electric power enterprise in Jiangsu Province. -Party and the independent Commission against corruption continues to strengthen. Was carried out to maintain 压力管道焊接工艺规程 1适用范围 本规程适用于工业管道或公用管道中材质为碳素钢、低合金钢、耐热钢、不锈钢和异种钢等压力管道的焊条电弧焊、钨极氩弧焊以及二氧化碳气体保护焊的焊接施工。 2 主要编制依据2.1 GB50236-98现场设备、工业管道焊接工程施工及验收规范; 2.2 GB/T20801-2006压力管道规范-工业管道;2.3 SH3501-2001石油化工剧毒、可燃介质管道工程施工及验收规范;2.4 GB50235-97工业金属管道工程施工及验收规范;2.5 CJJ28-89 城市供热管网工程施工及验收规范;2.6 CJJ33-89 城镇燃气输配工程施工及验收规范;2.7 GB/T5117-1995 碳钢焊条;2.8 GB/T5118-1995 低合金钢焊条;2.9 GB/T983-1995 不锈钢焊条;2.10 YB/T4242-1984 焊接用不锈钢丝;2.11 GB1300-77 焊接用钢丝;2.12 其他现行有关标准、规范、技术文件。3 施工准备3.1 技术准备3.1.1 压力管道焊接施工前,应依据设计文件及其引用的标准、规范,并依据我公司焊接工艺评定报告编制出焊接工艺技术文件(焊接工艺卡或作业指导书)。如果属本公司首次焊接的钢种,则首先要制定焊接工艺评定指导书,然后对该种材料进行工艺评定试验,合格后做出焊接工艺评定报告。 3.1.2 编制的焊接工艺技术文件(焊接工艺卡或作业指导书)必须针对工程实际,详细写明管道的设计材质、选用的焊接方法、焊接材料、接头型式、具体的焊接施工工艺、焊缝的质量要求、检验要求及焊后热处理工艺(有要求时)等。 3.1.3 压力管道施焊前,根据焊接作业指导书应对焊工及相关人员进行技术交底,并做好技术交底记录。 3.1.4 对于高温、高压、剧毒、易燃、易爆的压力管道,在焊接施工前应画出焊口位置示意图,以便在焊接施工中进行质量监控。 3.2 对材料的要求 3.2.1 被焊管子(件)必须具有质量证明书,且其质量符合国家现行标准(或部颁标准)的要求;进口材料应符合该国家标准或合同规定的技术条件。 3.2.2 焊接材料(焊条、焊丝、钨棒、氩气、二氧化碳气、氧气、乙炔气等)的质量必须符合国家标准(或行业标准),且具有质量证明书。其中钨棒宜采用铈钨棒;氩气纯度不应低于99.95%;二氧化碳气纯度不低于99.5%;含水量不超过0.005%。 3.2.3 压力管道予制和安装现场应设置符合要求的焊材仓库和焊条烘干室 ,并由专人进行焊条的烘干与焊材的发放,并做好烘干与发放记录。 3.3 焊接设备 3.3.1 焊接机具设备主要包括:交流焊机、直流焊机、氩弧焊机、高温烘干箱、中温烘干箱、恒温箱、二氧化碳气体保护焊机、焊条保温筒、内磨机及电动磨光机等。 3.3.2 用于压力管道焊接的各类焊机必须装有电流表、电压表,并按要求定期进行检定,焊接规范参数调节应灵活。 3.4 焊接人员3.4.1 压力管道焊工应具备按特种设备焊接操作人员考核细则考试合格的焊工合格证,且其合格项目与施焊项目相适应,并在规定的有效期内。 3.4.2 焊条烘干人员、焊条仓库管理人员要严格按照本公司焊接过程控制程序的规定执行。 3.5 施焊环境 3.5.1焊接时的风速不应超过下列规定,当超过规定时应有防风设施。 a)手工电弧焊:8m/s; b)氩弧焊、二氧化碳气体保护焊:2m/s。 3.5.2 焊接电弧1m范围内相对湿度不得大于90%。 3.5.3 在雨雪天气施焊时,要搭设防护棚;当焊件表面潮湿时,应对无预热要求的管子(件)进行烘烤,去除潮气。 3.5.4 焊接时允许的最低环境温度如下:碳素钢:-20;低合金钢:-10;中高合金钢:0。 4 焊接工艺4.1 压力管道焊接施工流程图(见图1)否水压试验否结果评定硬度测试焊后热处理是否结果评定返修或返工焊缝外观检查焊缝无损探伤焊接检验正式施焊质量评定焊口组对焊条烘干及焊丝清理焊接坡口制备及清理焊机性能确认焊前准备 图1 焊 接 施 工 流 程 图 4.2 焊前准备及接头组对4.2.1 压力管道焊接方法按设计规定执行,当设计无规定时,可按壁厚选用焊接方法。当壁厚6mm时,可选用氩弧焊或氩弧焊打底电焊盖面工艺;当壁厚6mm时,可采用氩弧焊打底,手工电弧焊盖面的焊接工艺。4.2.2 焊接材料的选用按设计规定,若设计无规定时,按表 1、表2、表3选用,并符合下列要求:a)同种管子(件)焊接时,焊缝金属性能和化学成分应与母材相当,且焊材工艺性能良好。 b)异种钢管子焊接时,焊条或焊丝的选用一般应符合下列要求: 两侧管材均非奥氏体不锈钢时,可选用成分介于二者之间或与合金含量低的一侧相匹配的焊条、焊丝。 两侧之一为奥氏体不锈钢时,可选用含镍量较高的不锈钢焊条(丝)。表1 常用钢号推荐选用的焊接材料钢号焊条电弧焊CO2气保焊氩弧焊焊条焊丝钢号(标准号)焊丝钢号(标准号)型号(标准号)牌号示例Q235-AFQ235-A10(管) 20(管)E4303(GB/T5117)J422H08MnSi(GB/T14958)Q235-BQ235-C20G 20g20R 20(锻)E4316(GB/T5117)J426H08MnSi(GB/T14958)E4315(GB/T5117)J42716Mn,16MnRE5016(GB/T5117)J506H08Mn2SiA(GB/T14958)H10MnSi(GB/T14957)E5015(GB/T5117)J50712CrMo12CrMoGE5515-B1(GB/T5118)R207H08CrMoA(GB/T14957)15CrMo15CrMoG15CrMoRE5515-B2(GB/T5118)R307H13CrMoA (GB/T14957)12Cr1MoV12Cr1MoVGE5515-B2-V(GB/T5118)R317H08CrMoVA(GB/T14957)1Cr5MoE5MoV-15R5070Cr18Ni9E308-16(GB/T983)A102H0Cr21Ni10(YB/T5091)E308-15(GB/T983)A1070Cr18Ni10Ti1Cr18Ni9TiE347-16(GB/T983)A132H0Cr21Ni10Ti(YB/T5091)E347-15(GB/T983)A137表2 不同钢号相焊推荐选用的焊接材料被焊钢材类别 接头母材类别或组别号焊条电弧焊氩弧焊 备注焊条焊丝钢号(标准号)型号(标准号)牌号示例碳素钢之间焊接E4303(GB/T5117)J422H08A (GB/T14957) E4315(GB/T5117)J427碳素钢与强度性低合金钢焊接(-1)E4303(GB/T5117)J422 H10MnSi(GB/T14957) E4315(GB/T5117)J427(-2)E4315(GB/T5117)J427 H10MnSi(GB/T14957) E5015(GB/T5117)J507(-1)(-2)E4315(GB/T5117)J427 H10MnSi(GB/T14957) E5015(GB/T5117)J507碳素钢与耐热型低合金钢焊接E4315(GB/T5117)J427H10MnSi(GB/T14957) E4315(GB/T5117)J427H10MnSi(GB/T14957) 碳素钢与低温型低合金钢焊接 E4315(GB/T5117) J427H10MnSi(GB/T14957) 强度性低合金钢的焊接E5015(GB/T5117)J507H10MnSi(GB/T14957)E5515-G(GB/T5118)J557珠光体钢与奥氏体不锈钢焊接珠光体钢与奥氏体不锈钢焊接(-1)E309-16(GB/T983)A302H1Cr24Ni13(YB/T5091)E309-15(GB/T983)A307E309Mo-16(GB/T983)A312 (-1)E309-16(GB/T983)A302H1Cr24Ni13(YB/T5091)E309Mo-16(GB/T983)A312(-1)E310-16(GB/T983)A402H1Cr26Ni21(YB/T5091)E310-15(GB/T983)A407(-1)E309-16(GB/T983)A302H1Cr24Ni13(YB/T5091)E310-16(GB/T983)A402H1Cr26Ni21(YB/T5091)E310-15(GB/T983)A407H1Cr26Ni21(YB/T5091)(-1)E309-16(GB/T983)A302H1Cr24Ni13(YB/T5091)E310-16(GB/T983)A402H1Cr26Ni21(YB/T5091)E310-15(GB/T983)A407H1Cr26Ni21(YB/T5091)(-1)E309-16(GB/T983)A302H1Cr24Ni13(YB/T5091)E309-15(GB/T983)A307表3 常用钢号分类分组类别号组别号钢 号-1Q235-AF, Q235-A, Q235-B, Q235-C10(管),20,20g,20G,20R-116Mn,16MnR-215MnVR,15MnNbR,20MnMo-113MnNiMoNbR, 18MnMoNbR, 20MnMoNb -207MnCrMoVR-112CrMo, 12CrMoG, 15CrMo, 15CrMoG, 15CrMoR,14Cr1Mo ,14Cr1MoR, 12Cr1MoV, 12Cr1MoVG-212Cr2Mo, 12Cr2MoG 12Cr2Mo1, 12Cr2Mo1R -11Cr5Mo-109MnD, 09MnNiD, 09MnNiDR-216MnD, 16MnDR, 15MnNiDR,20MnMoD-307MnNiCrMoVDR, 08MnNiCrMoVD, 10Ni3MoVD -11Cr18Ni9Ti, 0Cr18Ni90Cr18Ni10Ti, 00Cr19Ni10-20Cr17Ni12Mo2, 0Cr18Ni12Mo2Ti, 00Cr17Ni14Mo20Cr19Ni13Mo3, 00Cr19Ni13Mo3-10Cr134.2.3 焊接接头的坡口形式、尺寸及组对要求按设计规定执行,当设计无规定时,按表4确定。表4 焊接接头坡口形式和尺寸厚度T(mm)坡口名称坡 口 形 式坡 口 尺 寸备 注间隙 (mm)钝边 (mm)坡口角度()()13型坡口01.5单面焊3602.5双面焊39V型坡口020265759260303556569带垫板V型坡口3502455592646021260X型坡口030355652060双V型坡口03136575(812)2060U型坡口0313(812)管径76133管座坡口2345604.2.4 管子坡口应按下列方法加工: a)按SH3501-2001石油化工剧毒、可燃介质管道工程施工及验收规范分为SHA级的压力管道、中高合金钢及不锈钢管道的坡口应采用机械方法加工。b)其他管道坡口宜采用机械方法加工,当采用热加工方法时,切割后必须去除影响焊接质量的表面层。4.2.5壁厚相同的管子(件)组对时,应内壁平齐,如有错口,其错口值应按设计规定执行,当设计无规定时,应按下列要求执行: a)剧毒、易燃易爆管道局部错口为壁厚的10%,且不大于0.5mm。b)高温、高压及合金钢管道局部错口为壁厚的10%,且不大于1.0mm。 c)其他管道局部错口为壁厚的10%,且不大于1.5mm。4.2.6 当壁厚不同的管子(件)组对时,应将厚壁管按薄壁管厚度削薄,其具体规定见图 2。 图2 不等壁厚对接焊件坡口加工示意图4.2.7 管道焊缝的设置应避开应力集中区,且便于焊接、热处理及各种检验。4.2.8 焊接接头组对前,应用砂轮清理坡口及其两侧内外表面,在距坡口两侧20mm范围内不得有油漆、毛刺、锈斑、氧化皮及其他对焊接质量有害的物质,并磨出金属光泽。4.2.9 认真检查坡口及其两侧不得有裂纹、夹层等缺陷。4.2.10 不锈钢管道采用电弧焊时,坡口两侧各100mm范围内应涂白粉或其他防沾污剂。4.2.11 焊件组装时,应将待焊管子(件)垫置牢固,以防止在焊接和热处理过程中发生变形和附加应力。4.2.12 除设计规定的冷拉口外,其余焊口应禁止强力组对,更不允许用热膨胀法对口,以防引起附加应力。4.2.13 当焊接所处位置障碍多时,合格焊工在施焊前亦应进行与实际条件相同的模拟练习及试焊,经无损检测合格后方可正式焊接。4.2.14 组对管口局部间隙过大时应设法修正至规定尺寸,严禁在间隙内填塞它物。4.2.15 焊条在使用前应分别按其说明书要求进行烘干,并放在保温筒内随用随取。焊丝使用前应清除其表面的油污、锈迹等。4.3 定位焊4.3.1 定位焊时除其焊接材料、焊接工艺和预热温度等应与正式焊接相同外,还应满足下列要求:a)定位焊应能保证焊缝在正式施焊过程中不致开裂,其长度宜为1015mm,高宜为24mm,且不超过壁厚的2/3。定位焊缝两端应修磨成缓坡状。b)定位焊不得有裂纹及其他缺陷,如有缺陷应彻底磨除重新进行定位焊。c)在合金钢管壁上点焊组对卡具定位时,卡具的材质和焊材应与管材相同。当拆除卡具时,不得用敲打或掰扭的方法拆除。当用氧-乙炔焰切割卡具时,应在离管道表面3mm处切割,然后用砂轮修磨平整。4.4 正式焊接4.4.1 焊接引弧应在坡口内进行,严禁在管子(件)表面引燃电弧、试验电流或焊接临时支撑物。4.4.2 在焊接中应确保起弧及收弧的质量,收弧应将弧坑填满,多层焊的层间接头应相互错开。4.4.3 除焊接工艺有特殊要求外,每条焊缝应一次连续焊完,如因故被迫中断,应采取缓冷措施,再焊时应仔细检查确认无裂纹后,方可按焊接工艺继续施焊。有预热要求的管材应按预热要求重新预热后施焊。4.4.4 管子焊接时,管端要堵封住,防止管内穿堂风。4.4.5 焊接时焊接工艺参数均按表5、表6选择。表5 焊条电弧焊工艺参数焊接方法焊条直径(mm)焊接电流(A)电弧电压(V)焊条电弧焊2.58010022焊条电弧焊3.210014022焊条电弧焊4.016020022表6 钨极氩弧焊工艺参数焊接方法焊丝直径(mm)焊接电流(A)电弧电压(V)气体流量(L/min)钨极氩弧焊22.580100128104.4.6 根据设计及焊接工艺评定需焊前预热的管子(件),焊前应按要求进行局部预热。具体程序按照压力管道安装通用热处理工艺规程中的有关条款执行。 4.4.7 当采用氩弧焊打底时,应及时进行打底焊缝的检查,合格后尽快进行盖面焊接,以防止产生裂纹。4.4.8 有淬火倾向的管材施焊过程中,层间温度应不低于规定的预热温度的下限。4.4.9 中、高合金钢(含铬量3%或合金总含量5%)的管子(件)焊接时,为防止根层氧化或过烧,内壁应充氩气或混合气体保护。4.4.10 厚壁大直径管的焊接应采用多层多道焊进行逐层焊接,其中氩弧焊打底的焊层厚度不小于3mm,各层经自检合格后方可焊接次层,直至完成。4.4.11 为减少焊接变形和应力,直径大于194mm的管子(件)宜采用二人对称施焊。4.4.12 对需做检验的隐蔽焊缝,应经检验合格后,方可进行其他工序。4.4.13 低温钢、奥氏体不锈钢、耐热耐蚀高合金钢以及奥氏体与非奥氏体异种钢接头焊接时应符合下列规定:a)应在焊接作业指导书规定的范围内,在保证焊透和熔合良好的条件下,采用小电流、短电弧、快焊速和多层多道焊工艺,并应控制层间温度。b)对抗腐蚀性能要求高的双面焊缝,与腐蚀介质接触的焊层应最后施焊。c)低温钢焊接完毕,宜对焊缝进行表面焊道退火处理。d)奥氏体不锈钢焊缝及其附近表面应进行酸洗、钝化处理。4.4.14 管道冷拉口所使用的工卡具,应待焊接及热处理工作结束后方可拆除。4.4.15 管道支吊架焊接的焊工和焊材必须与管道焊接要求相同。焊缝焊接牢固,成型美观、无缺陷,焊接过程中要防止焊穿管子,并有防止变形的措施。4.4.16 焊口焊完应进行清理,经自检合格后,在焊缝附近打上焊工本人的代号钢印,并在相应的管道单线图上作记录。5 质量检查及评定5.1 焊缝质量检查5.1.1 焊缝应进行外观自检和专检,自检率为100%,专检率根据设计要求执行。外观检查质量应符合设计要求,当设计无规定时,应符合以下要求:a)焊缝外观成型良好,与母材圆滑过渡,其宽度以每边盖过坡口边缘2mm为宜。b)焊缝表面不允许有裂纹、未熔合、气孔、夹渣、飞溅等存在。c)设计温度低于-29的管道、不锈钢和淬硬倾向较大的合金钢管道焊缝表面,不得有咬边现象。其他材质管道咬边深度不大于0.5mm,连续咬边长度不大于100mm,且焊缝两侧咬边总长不大于该焊缝全长的10%。d)焊缝表面不得低于管道表面。焊缝余高1+0.2焊缝坡口宽度,且不大于3mm。e)焊接接头错边不应大于壁厚的10%,且不大于2mm。5.1.2 焊缝无损检测a)压力管道焊缝无损检测方法:抽检率、合格等级和执行的标准应按设计要求执行。b)按百分比抽检的焊接接头,应由质量检查员根据焊工和现场的情况指定检测位置。c)同管线的焊接接头抽样检验,若有不合格时,应按该焊工的不合格数加倍检验,若仍不合格,则应全部检验。d)不合格的焊缝同一部位的返修次数,非合金钢管道不得超过3次,其余钢种管道不得超过2次。经返修后的焊缝按原要求复检合格。e)其他要求按本公司无损检测通用作业指导书的规定执行。5.1.3 合金焊缝光谱分析按设计规定执行。5.1.4 焊后热处理质量检验根据设计规定进行,当焊缝的硬度值超过规定的范围时,应按班次作加倍复检,并查明原因,对不合格焊缝重新进行热处理及硬度测试。6 安全技术措施6.1所有带电设备必须有良好的接地,焊工及热处理工在启动带电设备时,必须首先检查设备接地是否良好。6.2 非电工严禁拆装一次线,焊接及热处理设备的接线、检查、维修必须在切断电源后进行。6.3焊接设备裸露部分、转动部分及冷却部分均应设保护罩,焊工所用导线必须是绝缘良好的橡皮线,在连接电焊钳一端的接头至少有5米绝缘软导线。6.4 焊工在闭合和断开电源开关时,应戴干燥手套,通电后不准触摸导电部分。6.5 焊工离开工作场所时,必须随即切断电源,检查施焊场地确无火种后离去。6.6 禁止焊接带有压力的管道;禁止在存有易燃易爆物品的车间、室及其周围5米的地方进行焊接与切割。6.7 高空焊接与热处理时,应戴安全帽、安全带并携带工具袋,所使用的工具一律放在工具袋内,并放置在可靠的地点。在焊接与热处理场所上部临时吊装物体时,焊工及热处理工应自动避开。6.8 高空作业使用的脚手架一定要用软铁丝扎牢固,焊工及热处理工使用前要认真检查,禁止登在梯子的最高层进行各种操作。6.9 打药皮时,要防止药皮伤害眼睛,两人对称焊时,应互防弧光打眼。6.10 热处理部位应设明显的警示和隔离措施。加热电缆及热电偶信号电缆应尽可能悬挂设置,防止意外损伤。6.11 其他安全技术要求按本公司安全生产管理制度的规定执行。7 质量记录7.1 工程竣工后,按设计或合同规定及时向业主移交焊接质量记录,若设计或合同无规定时,应按以下交工文件整理: (1)焊材质量的证明; (2)焊工合格证明; (3)焊条烘干记录、焊材发放记录; (4)焊缝外观质量检查记录; (5)焊接记录; (6)焊缝无损检测报告及布片示意图。 (7)焊缝热处理报告及位置示意图。 (8)焊缝光谱分析报告。 (9)焊缝硬度报告。 (10)涉及的焊接工艺评定清单。 (11)焊口探伤委托单。 (12)焊口光谱分析委托单。 (13)焊口热处理委托单。 (14)焊接作业指导书。以上表式,按本公司压力管道安装质量文件记录报告表格选用。7.2 本规程所涉及的以上质量记录按本公司质量记录控制程序的规定执行。在抓好理论学习和业务学习的同时,贴近机关实际,收听收看市政管理,街道卫生工作管理,促进了学用结合。为人民服务是党的根本宗旨。我们在市政管理建设中,牢固树立“以人为本”的服务理念,全面提升服务意识、服务效率、服务水平和服务质量,积极构建与服务对象之间的和谐关系。security, profit, maintain stability and promote harmonious development as the main content of the three guarantees theme practice activities and stressing party spirit, to conduct, for example campaign, party and further improvement of the level of work. Staff participating in the honest and clean culture construction seminars, staffs sense of probity and enhanced. Founded by honest inspectors team composed of 12 employees to broaden the channels of supervision. Adhere to establish four good leadership activities, staff satisfaction rate of 98% to the team. -Group work dynamic. Promoting the openness of factory Affairs, proposal for a love letter box, to the vital interests of the staff Trade Union delegation leader meeting of the 26 system to discuss and safeguard their democratic rights. Improve the organizational structure of the mission, the work of strengthening. Organize maintenance labor emulation and health Cup competition, enhance the skills of staff. Organized a variety of cultural activities, physical and mental health care staff, to create a harmonious atmosphere. During the Wenchuan earthquake, donated all the company employees, to love, to support the disaster areas. This year, the company has won the Su . Cutting costs can be controlled, money should not be wasted management philosophy, management analysis, to improve management quality, improve cost control capacity and market competitiveness. Innovation of science and technology-science and technology innovation is to play the role of science and technology as the primary productive force, active use of new technologies, new materials,
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025房地产行业劳动合同解除与补偿操作规程
- 说明文阅读课件完整
- 2025木材采购合同
- 语法操练课件
- 红酒原料知识培训课件
- 2025加强合同管理提升工程施工业绩
- 2025国际融资租赁合同
- 诗词知识培训内容课件
- 2025咨询服务合同范本(合同版本)
- 红楼色彩课件
- 医院员工手册培训
- 《发热护理》课件
- 《班级植物角我养护》(课件)-二年级上册劳动浙教版
- 五金O2O模式-洞察分析
- 反恐防暴应急知识培训
- 《网络综合布线系统工程技术实训教程(第5版)》 课件 第2章 网络综合布线系统工程技术常用标准
- 2024-2030年中国汽车金融行业市场深度分析及竞争格局与发展前景展望研究报告
- 光伏组件回收再利用建设项目可行性研究报告写作模板-拿地申报
- 《公路桥梁施工监控技术规程》(JTGT3650-01-2022)
- 血气分析标本采集及结果判读
- 2024广西公需课高质量共建“一带一路”谱写人类命运共同体新篇章答案
评论
0/150
提交评论