




已阅读5页,还剩37页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
e Gas Assist Injection Molding Gas A.I.M Seminar 气 体 辅 助 成 型 技 术 2005-02-24 GE Advanced Material Confidential 1 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding Key Features 主 要 特 征 l An Extension of Traditional Injection Molding 传 统 注 塑 技 术 的 拓 展 l Produces Molded Parts with Hollow Sections 制 品 中 空 l A Low Cavity Pressure Process 低 型 腔 压 力 l A Short Shot Process 缺 料 注 塑 2005-02-24 GE Advanced Material Confidential 2 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding Molding Overview 成 型 概 述 l High Pressure Gas (Nitrogen) is Injected into the Uncured Resin高 压 气 体 (N 2)充 入 未 凝 树 脂 l The Gas Bubble Follows the Path of Least Resistance (High T & Low P)气 体 流 向 阻 力 最 小 处 l Hollow Sections Result from Displaced Resin and Shrinkage in Thick Sections制 品 内 部 壁 厚 处 中 空 2005-02-24 GE Advanced Material Confidential 3 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding Stages of Gas Assist Molding 气 辅 成 型 的 各 阶 段 部 分 充 模 首 次 充 气 二 次 充 气 2005-02-24 GE Advanced Material Confidential 4 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding Process Benefits 加 工 优 势 It is important to note that some (not all) of these benefits may be realized for any given part. l Reduced Sink Marks or Read Through under Channels or Ribs减 轻 缩 痕 l Smooth Surface Finish when Compared to Structural Foam制 品 表 面 光 滑 l Reduced Cycle Time when Compared with Structural Foam or Thick Parts降 低 循 环 时 间 l Lower Part Weight in Some Parts减 小 制 品 质 量 2005-02-24 GE Advanced Material Confidential 5 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding Process Benefits (continued) l Enhanced Flow Capability增 加 流 动 性 Reduced clamp tonnage requirements降 低 锁 模 吨 位 Reduced pressure requirements降 低 注 射 压 力 Replaces external hot or cold runners with built-in (gas) channels (lower tooling cost).降 低 模 具 成 本 l Reduced Molded-in Stress and Stress Gradient throughout the part 降 低 模 内 应 力 Uniform packing/shrinkage均 匀 收 缩 Reduced part warpage减 轻 制 品 挠 曲 l Greater Design Freedom更 大 的 设 计 自 由 度 Adds structure with little penalty结 构 多 样 化 Allows the molding of thick parts可 成 型 较 厚 制 品 2005-02-24 GE Advanced Material Confidential 6 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding Enhanced Flow with Gas Assist 气 辅 增 强 流 动 Gas core Channels act as flow leaders气 道 引 流 2005-02-24 GE Advanced Material Confidential 7 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding 13 x 20 Plaque Sink clearly visible Sink reduced significantly 2005-02-24 GE Advanced Material Confidential 8 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding Weight Reduction 减 轻 重 量 2005-02-24 GE Advanced Material Confidential 9 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding Warpage in a 4 x 30 Plaque with Rib 改 善 翘 曲 变 形 Without Gas With Gas 2005-02-24 GE Advanced Material Confidential 10 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding Process Sequence 加 工 顺 序 l Clamp Mold锁 模 l Inject Resin to a Short Shot or Partial Pack注 射 原 料 ( 未 充 满 ) l Inject High Pressure Gas (Nitrogen)注 高 压 气 体 l Hold Gas Pressure while Cooling冷 却 时 保 持 气 压 l Vent Gas排 除 气 体 l Open Mold / Eject Part开 模 /取 件 2005-02-24 GE Advanced Material Confidential 11 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding Process Variables 加 工 变 量 Injection Molding 注 射 系 统 l Mold Temperature模 温 l Melt Temperature熔 体 温 度 l Injection speed注 射 速 度 2005-02-24 + Gas Assist Molding 气 体 辅 助 系 统 l Gas Pressure Profile气 压 剖 面 图 l Gas Timing定 时 进 气 l Material Characteristics材 料 特 性 GE Advanced Material Confidential 12 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding Setting of molding conditions in the GAI molding *Delay time for gas injection气 体 注 射 的 延迟 时 间 *Gas pressure气 体 压 力 *Gas retention time 气 体 保 留 时 间 *Gas release time.气 体 释 放 时 间 2005-02-24 GE Advanced Material Confidential 13 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding 气 体 注 入 压 力 P.P.C落 十 段 气 体 压 力 控 制 图 表 高 压 保 压 闭 环 控 制 升 压 力 压 力 下 降 低 压 下 降 第 三 段 第 段 时 间 第 一 段 第 二 段 线 性 位 移 延 迟 第 五 段 第 六 段 第 七 段 模 具 顶 出 第 八 段 第 九 段 第 十 段 2005-02-24 GE Advanced Material Confidential 14 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding Delay time for gas injection延 迟 时 间 Delay time for gas injection means the time from the completion of resin injection to the start of gas injection. If it is too short, the thickness of the skin layer can be too thin or even the skin layer can be broken to form holes in some cases. On the other hand, if it is too long, the appearance can be poor or the gas can not be injected because the resin is already solidified. 延 迟 时 间 是 树 脂 注 射 完 成 至 气 体 开 始 注 射 的 一 段 时 间 。 太 短 , 制 品 表 层 太 薄 甚 至 会 引 起 表 面 气 孔 。 太 长 的 话 , 树 脂 已 固 化 会 导 致 不 能 注 射 气 体 或 表 面 光 泽 差 。 2005-02-24 GE Advanced Material Confidential 15 PDF created with FinePrint pdfFactory trial version e Gas pressure 气 压 Gas Assist Injection Molding The gas pressure is usually less than 30MPa and it is not necessary to apply the pressure as high as 100MPa like in the case of usual injection molding. 不 低 于 30MPa但 不 应 高 于 100MPa。 Gas retention time 保 留 时 间 The process of gas retention fills the roles of both dwell and cooling in usual injection molding. The longer the gas retention time is, the better the dimensional accuracy becomes.保 留 时 间 越 长 , 尺 寸 精 度 越 高 。 2005-02-24 GE Advanced Material Confidential 16 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding Gas release time 释 放 时 间 Gas release time is set in order to release the high pressure gas inside before opening the mold. If the mold is opened before the release of internal pressure, the molded products are sometimes broken by the internal pressure. 设 定 释 放 时 间 是 为 了 释 放 开 模 前 的 高 压 气 体 , 否 则 有 可 能 会 使 产 品 破 裂 。 2005-02-24 GE Advanced Material Confidential 17 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding Types of Gas Systems l Gas Injection through the Machine Nozzle 设 备 喷 嘴 进 气 l Gas Injection into the Polymer Stream (Runner, Manifold) 熔 流 中 进 气 l Gas Injection Directly into the Cavity (in article) using Mold Pins/Nozzles 使 用 气 针 ,型 腔 进 气 2005-02-24 GE Advanced Material Confidential 18 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding Gas Injection Through the Machine Nozzle 设 备 喷 嘴 进 气 N 2 in N 2 out via recovery N 2 out at sprue break 2005-02-24 GE Advanced Material Confidential 19 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding Gas Injection into the Polymer Stream 熔 流 进 气 N 2 out at ejection or retraction 2005-02-24 Hydraulics optional GE Advanced Material Confidential N 2 in/out 20 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding Gas Injection Directly into the Cavity 型 腔 进 气 Hydraulics optional N 2 in/out N 2 out at ejection or retraction 2005-02-24 Hydraulics GE Advanced Material Confidential optional N 2 in/out 21 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding Gas Supply l Nitrogen Bottles l Liquid Nitrogen Tank l Membrane Filter 2005-02-24 GE Advanced Material Confidential 22 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding GAS Assisted Injection Molding Part and Mold Design lRod-like part: Use a cross-section approaching round shape. If a non-circular sharp cross-section is used, use a generous radius at any turn on periphery lLarge structural part: Use a small nominal thickness and connect thick sections to be gas channels lUniform melt is very important lAccurate shot size is very important lAccurate cavity dimension is very important lEven cooling is very important lGas channels should be evenly laid-out on the whole part 2005-02-24 GE Advanced Material Confidential 23 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding GAS Assisted Injection Molding Part and Mold Design lGas channel layout should follow the major polymer flow direction lExtend gas channel to the last filled area where should be non-appearance place lGas channel should not be close-looped lWhen a gas channel has two or more branches, a step-down channel at end of each branch can avoid gas acceleration lGas should be limited within the gas channel lSmall gas channel would induce permeation 2005-02-24 GE Advanced Material Confidential 24 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding GAS Assisted Injection Molding Part and Mold Design lGas should penetrate to the end of the gas channel lUse a generous radius at each turn of gas channel lWhen short shot method is used, the volume of unfilled areas prior to gas injection should not exceed 50% of the total volume of the gas channels. lGas channel layout should follow the major polymer flow direction 分 流 道 扼 流 段 型 腔 气 针 2005-02-24 GE Advanced Material Confidential 25 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding GAS Assisted Injection Molding Part and Mold Design lPolymer entrance can be located at thin wall area and apart from gas entrance by more than 30mm, to avoid permeation and back-flow. lWhen polymer and gas enter the cavity at the same location, a balanced polymer flow promotes even gas penetration. lLocated overflow well at the last filled area. lOverflow well can promote gas penetration, increase gas volume percentage in the gas channel, remove hesitation and stability part quality 2005-02-24 GE Advanced Material Confidential 26 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding GAS Assisted Injection Molding Part and Mold Design lLocate gas nozzle at furthest point last filled area. lOrientate the outlet of gas nozzle along the same direction as polymer flow lMulticavity mold: Gas to each cavity is supplied by independent gas nozzle. lKeep the melt from velocity constant. 注 气 孔 注 气 孔 2005-02-24 流 道 GE Advanced Material Confidential 27 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding Typical Process and Design Problems 2005-02-24 GE Advanced Material Confidential 28 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding Converging Flow Hollow Core Solid Slug 2005-02-24 Gas Gate GE Advanced Material Confidential 29 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding Effect of Gravity Resin/Gas Flow Solid on Bottom 2005-02-24 GE Advanced Material Confidential 30 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding Flow Around Corners Bubble takes the inside corner 2005-02-24 GE Advanced Material Confidential 31 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding Large Aspect Ratio Cross Section 8 1.5 2005-02-24 GE Advanced Material Confidential 32 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding Hollow Cross Section Uncontroled wall thickness 2005-02-24 GE Advanced Material Confidential 33 PDF created with FinePrint pdfFactory trial version e Gas Assist Injection Molding Glass Fibers Create a Rough Interior Surface Diverging Flow Rough Surface 2005-02-24 GE Advanced Material Confidential 34 PDF created with FinePrint pdfFactory trial version http:/www.finep
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 矿产资源空间分析-洞察与解读
- 2025年蚌埠爱尔眼科医院招聘若干人模拟试卷(含答案详解)
- 2025年河北沧州南皮县中医医院公开招聘工作人员16名考前自测高频考点模拟试题附答案详解(完整版)
- 2025年金华磐安县卫健事业单位公开招聘工作人员29人考前自测高频考点模拟试题含答案详解
- 2025北京顺义区教委所属事业单位招聘131人模拟试卷及答案详解(网校专用)
- 2025年合肥市引江济淮投资有限公司招聘10人考前自测高频考点模拟试题附答案详解(完整版)
- 2025安顺市参加“第十三届贵州人才博览会”引才1453人模拟试卷及参考答案详解一套
- 班组安全培训讲话材料课件
- 2025广西能源集团有限公司社会招聘15人模拟试卷完整答案详解
- 2025年合肥滨投文化创意发展有限公司招聘3人考前自测高频考点模拟试题及答案详解(全优)
- 医院非暴力沟通小讲课
- 2025至2030年中国山西省房地产行业发展监测及投资前景展望报告
- 第4课洋务运动与边疆危机(任务型导学案)(原卷版)
- 创建文明班级班会课件
- 2025年新修订治安管理处罚法课件
- 社会渠道支撑管理制度
- DBJ50-T-047-2024 建筑地基基础设计标准
- 呼吸科出科小讲课
- 2025年中国红富士苹果市场深度调研研究报告
- 钢结构项目可行性研究报告(立项申请报告)模板
- 仓库员工考试题及答案
评论
0/150
提交评论