APSS 011 1.2 - 0 Defect.docx_第1页
APSS 011 1.2 - 0 Defect.docx_第2页
APSS 011 1.2 - 0 Defect.docx_第3页
APSS 011 1.2 - 0 Defect.docx_第4页
APSS 011 1.2 - 0 Defect.docx_第5页
已阅读5页,还剩3页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

APS Standards Autoliv ChinaName APSS 011APS Standard Autoliv CHINAZero DefectAPSS 011Distribution to: Autoliv China APS Managers, Autoliv China Plant ManagersAuthor:Carl HuXXApproved by:Frederic BurguezVersion:1.2Release date: 29-06-2014Pages: 5APSS 011 version 1.2 / 21-08-2012 Page 8 of 8Table of Contents APSS 011INTRODUCTION31PURPOSE32SCOPE33RESPONSIBILITY34PROCEDURE35REFERENCES86APPENDICES86.1Appendix A Visual Board86.2Appendix B Defect Record86.3Appendix C Defect Calendar86.4Appendix D Action Register87MODIFICATION INDEX8Introduction1 PurposeThe purpose of this standard is to describe Autoliv Chinas zero defect activity.This activity is created to give opportunity to re-set quality mindset of all employees in autoliv plant.2 ScopeAll plants within Autoliv China3 ResponsibilityIt is the responsibility of the site APS leader and PQM to plan, implement and execute this standard4 Procedure4.1 The zero defect activity is the teamwork in genba.Participant should be Plant Manager, Manufacturing Manager, AMC Manager, PQM, PQ, PE, SQE, IE, CQ, COP, APS etc.4.2 What is defect?4.2.1 NCE/NCM4.2.2 Customer PPM4.2.3 Components defect Components defect that is assembled to the product Components defect that is found before assemble to the product and after incoming4.2.4 Dropped down parts4.2.5 Defect on a change overSetting piece is defined in the standard during change over, such like die casting process, webbing process etc.4.2.6 DPMUIt includes all defects recorded throughout the process steps that cause units and parts to be rejected, reworked, re-run or scrapped. Defects are recorded independent from the root cause: sub supplier, tooling, maintenance or handling all parts or units which are not passing first time through the line4.2.6.1 DPMU TableIn the table below some issues are explained, how they shall be counted or not counted in the formula for DPMU:4.2.6.2 Re-RunRepeating a process step with the same part (e.g. repeating of testing operations orfolding a bag a 2nd time)4.2.6.3 ReworkAll corrected/repaired defects in or out of the process flow and which is not a standard operation (e.g. cover with scratch replacement; misaligned nut on bolt replacement)4.2.6.4 RejectPart separated from the process flow and put into the reject box (e.g. wrong assembled part or part with bad riveting). 4.2.6.5 ScrapRejected parts that can never be used again (e.g. inflator without barcode, split line open of wrap).4.3 Defect matrix in zero defect activity4.4 Workshop openFollow strictly the workshop process, why this WS, Action Register, intensive days, success story, Yokoten etc.4.5 Daily review AMCs review the actual situation in a daily meeting Inform a trend (Going worse / better) New type of defect happening Problem for action progress Plant management team review the zero defect status in daily plant status review4.6 Weekly review PQM and APS managers review the zero defect status in the genba with the workshop leaders Inform a trend (Going worse / better) New type of defect happening Problem for action progress4.7 Monthly review Plant management team review the zero defect status in the genba every month (Minimum) Trend of defect happening Root cause analysis of Top items in AMC/G Deep dive and coach the team as OJT Progress of actions Support needed4.8 Others AMC/G team goes to Genba when the top item happens in order to catch the root cause Follow the CPC process for any actual changes by Kaizen When change or create the SWI, it shall be made by team include operator then tried by team member by themselves APS and related managers support education and training of required items4.9 Standard of visual board4.10 Zero defect status board The Golden Flower: Keeping zero defects more than 26 days. The Silver Flower: Keeping zero defect more than 15 days and less than 26 days The Copper Flower: keeping zero defect more than 7 days and less than 15 days4.11 The defect market:5 ReferencesALA APS S 001 Visualization of Zero Defect Activity6 Appendices6.1 Appendix A Visual Board6.2 Appendix B Defect Record 6.3 Appendix C Defect Calend

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论