全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Highway engineering change reasonanalysis and cost of the project of influenceabstract : in The implementation stage because of highway engineering design factors,environmental factors,The influence of variousKeywords : engineering change,reason,costDue to the highway project period,long,line,So broad in construction of various causes by the engineering change is inevitableengineering change could lead to increase of construction cost or Time limit of the owner and the contractor,between the claim will claim and theowner of change and the causes of the costand when the owner change engineering bidding of construction conditions of commitment .santongyiping referred to in The preceding paragraph,The engineering tight finish,delay purpose will increase The contracters sees can increase content of missing the contract cost,and the owners requirements,And shortcen delivery of finished ahead of the original connectons And the owner of the contract with the materials or equipment supply for the category And quantity,cause cost increase or decrease,And the oothe design of change and the causes of the costThe design adopts the new standard,new technology,new technology,to replace the original design of the project,And put to use more)和the requirements of the project,The main structure change shape And size change etc,make the cost increase,And design personneltthe contractor to change and cause the influence . costThe contractor is unable to perform The contract Or cant completed ly,The contractor shall take remedial measures proposed change,This kis and puts forward such reasons,And more economical and reasonable,optimizing design scheme,this kind of change if owner recognized this kind of other changes generally does not make owner cost increase,but will make The contractor under loss,Due to the contractor technologythe supervisor of change and the causes of the costSupervision by the owner,Commissioned by the cause of the change of the owner or expenses directly influence the cost . 1 and supervision engineencethe site supervision engineers in actual situation in the contract and the technical specific a Tion for the design,according to local modificationand supervision engineers work and coordination ability damage caused by lack of rework,Engineering cost change w
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年黑龙江大庆市中考语文试题解读及备考指导
- 黑龙江省绥化市海伦市2025-2026学年七年级上学期1月期末考试语文试卷(无答案)
- 广东省湛江雷州市2025-2026学年上学期期末七年级语文试卷(无答案)
- 2025秋人教版二年级数学上册期末复习专项拔高卷(含答案)
- 五官科题库及答案
- 微机原理试题库及答案
- 三年级下册第八单元写作指导这样想象真有趣人教部编版
- 北京版六年级下册数学第二单元比和比例测试卷附参考答案【预热题】
- 在市民政工作半年总结会议上的工作报告全国民政工作会议
- 防雷系统设计安装技术要点
- 2026年黑龙江林业职业技术学院单招职业技能笔试备考试题含答案解析
- 生物实验室安全管理手册
- 网络安全与舆情培训简报课件
- 供应商现场审核打分表-评分细则
- 预防葡萄膜炎复发护理策略
- 民兵伪装与防护课件
- 2025年初级经济师考试卷附答案
- 车辆保证过户协议书
- 2026年劳动合同示范文本
- 2025年《城市公共汽车和电车客运管理规定》知识考试题库及答案解析
- 数字文旅发展的沉浸式体验创新
评论
0/150
提交评论