




已阅读5页,还剩19页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Form RST-2 ? CHINA CLASSIFICATION SOCIETY No. GZ004000 CALCULATION BOOKLET FOR SUEZ CANAL TONNAGE MEASUREMENT Name of Ship SAMPLE Flag China Registered No. XXXXX SUEZ CANAL GROSS TONNAGE 26713.17 SUEZ CANAL NET TONNAGE 22616.68 Place Guangzhou (Yan Chuanshi) Surveyor to Date Oct. 10, 2001 CHINA CLASSIFICATION SOCIETY (1) CALCULATION SHEETS FOR SUEZ CANAL TONNAGE MEASUREMENT China Oil Tanker XXXXX Nationality Type of Ship Name of Ship Registered Number Signal Letters Port of Registry Name of Owners XXXXX XXXX XXXX XXXXXXX Where built Guangzhou Material of hull Steel Name of builders Guangzhou Shipyard International Co., Ltd., China Type and Lumber of engines Diesel 6S50MC, 1 set Date of launch 11,05,2001 Kind and number of propellers Solid, 1 Set Registered length 179.87 m Registered breadth 30.50 m Registered depth 17.00 m GROSS TONNAGE 26737.47TONS NET TONNAGE 22616.68TONS Under the tonnage deck: 24878.54 Deducted spaces: Lower tween deck Tween deck Upper tween deck Crew s accommodation 497.71 Forecastle 150.36 Officer s accommodation 348.71 Bridge Master s accommodation 53.72 Space under overhead deck 46.22 Galleys, etc. 121.03 Break or breaks Closed-in spaces above uppermost deck used in working the ship 309.26 Roundhouses 1662.35 Total deductions 1330.43 Excess of hatchways 0.00 Net register tonnage (if a sailing ship) 25407.04 Under tonnage deck* 1516.21 In tween decks Engine room as measured On the uppermost deck 78.28 In a screw steamer + 75% of engine room as measured 1195.87 Total deduction for propelling power 2790.36 *Including part of double bottom compartment available for oil drain tank(s). Notes Unit of measurement is in meter. These calculation sheets ( 23 sheets) are to certify that the above named ship has been measured in conformity with the rules adopted by the International Tonnage Commission at Constantinople. Place Guangzhou (Yan Chuanshi) DateOct. 10, 2001 Surveyor to CHINA CLASSIFICATION SOCIETY (2?1) CALCULATION SHEETS FOR TONNAGE MEASUREMENT Details of Gross Tonnage Under the Tonnage Deck Tonnage Length 171.60 m (Stern FrNos.214) No. of divisions of length 12 Common int. bet. Areas 14.300 m Camber of beam at the middle of tonnage length 0.50 m Depth of area at the middle of tonnage length 15.33 m No. of divisions of depth6 No. of areas 1 2 3 4 5 6 7 Depths 7.10 15.26 15.32 15.33 15.33 15.33 15.33 Common int. bet. bths. 1.183 2.543 2.553 2.555 2.555 2.555 2.555 No. of bths. Multi- pliers Bths. Prod. Bths. Prod. Bths. Prod. Bths. Prod. Bths. Prod. Bths. Prod. Bths. Prod. 1 1 19.9019.9026.9026.9029.8029.8029.8029.8029.8029.8029.8029.8029.8029.80 2 4 17.9071.6024.4097.6028.70114.8029.80119.2029.80119.2029.80119.2029.80119.20 3 2 15.5031.0020.8041.6027.5055.0029.7059.4029.8059.6029.8059.6029.8059.60 4 4 13.0052.0013.6054.4025.40101.6029.40117.6029.80119.2029.80119.2029.80119.20 5 2 9.9019.806.4012.8022.2044.4028.6057.2029.8059.6029.8059.6029.8059.60 6 4 6.1024.404.2016.8018.1072.4027.10108.4029.74118.9629.80119.2029.80119.20 7 1 0.000.001.801.8011.8011.8022.2022.2028.3028.3029.6429.6429.8029.80 Sum of products 218.70251.90429.80513.80534.66536.24536.40 1/3 Common int. bet. bths. 0.3940.8480.8510.8520.8520.8520.852 Section areas 86.17213.61365.76437.76455.53456.88457.01 Multipliers 1424242 Products 86.17854.44731.521751.04911.061827.52914.02 1/3 Common int. bet. areas. 4.7674.7674.7674.7674.7674.7674.767 Volume (m3) 410.774073.123487.168347.214343.028711.794357.13 Total volume (m3)33730.20 (2?2) CALCULATION SHEETS FOR TONNAGE MEASUREMENT Details of Gross Tonnage Under the Tonnage Deck Tonnage Length 171.60 m (Stern FrNos.214) No. of divisions of length12 Common int. bet. Areas 14.300 m Camber of beam at the middle of tonnage length 0.50 m Depth of area at the middle of tonnage length 15.33 m No. of divisions of depth6 No. of areas 8 9 10 11 12 13 14 Depths 15.3315.3315.3315.3214.8215.05 Common int. bet. bths. 2.5552.5552.5552.5532.4702.508 No. of bths. Multi- pliers Bths. Prod. Bths. Prod. Bths. Prod. Bths. Prod. Bths. Prod. Bths. Prod. Bths. Prod. 1 1 29.8029.8029.8029.8029.8029.8029.8029.8029.5029.5021.1021.10 2 4 29.80119.2029.80119.2029.80119.2029.80119.2028.50114.0018.8075.20 3 2 29.8059.6029.8059.6029.8059.6029.8059.6027.4654.9216.9033.80 4 4 29.80119.2029.80119.2029.80119.2029.80119.2027.00108.0016.0064.00 5 2 29.8059.6029.8059.6029.8059.6029.8059.6027.0054.0015.9031.80 6 4 29.80119.2029.80119.2029.80119.2029.80119.2026.90107.6015.7062.80 7 1 29.8029.8029.8029.8029.8029.8029.3429.3425.7025.7013.5013.50 Sum of products 536.40536.40536.40535.94493.72302.20 1/3 Common int. bet. bths. 0.8520.8520.8520.8510.8230.836 Section areas 457.01457.01457.01456.08406.33252.64 Multipliers 424241 Products 1828.04914.021828.04912.161625.32252.64 1/3 Common int. bet. areas. 4.767 4.767 4.767 4.767 4.767 4.767 Volume (m3) 8714.274357.138714.274348.277747.901204.33 Total volume (m3)35086.17 (2?3) CALCULATION SHEETS FOR TONNAGE MEASUREMENT Details of Gross Tonnage Under the Tonnage Deck Tonnage Length 9.60 m (FrNos.214230) No. of divisions of length 4 Common int. bet. Areas 2.400 m Camber of beam at the middle of tonnage length 0.20 m Depth of area at the middle of tonnage length 15.93 m No. of divisions of depth6 No. of areas 1 2 3 4 5 6 7 Depths 15.9015.9115.9315.7415.16 Common int. bet. bths. 2.6502.6522.6552.6232.527 No. of bths. Multi- pliers Bths. Prod. Bths. Prod. Bths. Prod. Bths. Prod. Bths. Prod. Bths. Prod. Bths. Prod. 1 1 21.1021.1018.6018.6015.8015.8012.5012.508.808.80 2 4 19.0076.0015.6062.4012.0048.008.1032.404.2016.80 3 2 16.4032.8013.6027.209.8019.605.4010.800.801.60 4 4 16.0064.0013.1052.409.3037.205.2020.800.301.20 5 2 15.9031.8013.2026.409.6019.206.5013.003.807.60 6 4 15.4061.6012.7050.809.5038.006.4025.604.0016.00 7 1 10.5010.507.807.806.506.502.602.601.101.10 Sum of products 297.80245.60184.30117.7053.10 1/3 Common int. bet. bths. 0.8830.8840.8850.8740.842 Section areas 262.96217.11163.11102.8744.71 Multipliers 14241 Products 262.96868.44326.22411.4844.71 1/3 Common int. bet. areas. 0.800 0.800 0.800 0.800 0.800 Volume (m3) 210.37694.75260.98329.1835.77 Total volume (m3)1531.05 (2?4) CALCULATION SHEETS FOR TONNAGE MEASUREMENT Details of Gross Tonnage Under the Tonnage Deck Tonnage Length 3.90 m (FrNos.230Fore) No. of divisions of length 2 Common int. bet. Areas 1.95 m Camber of beam at the middle of tonnage length 0.10 m Depth of area at the middle of tonnage length 2.57 m No. of divisions of depth4 No. of areas 1 2 3 4 5 6 7 Depths 5.262.570.00 Common int. bet. bths. 1.3150.4280.000 No. of bths. Multi- pliers Bths. Prod. Bths. Prod. Bths. Prod. Bths. Prod. Bths. Prod. Bths. Prod. Bths. Prod. 1 1 8.408.405.505.500.000.00 2 4 6.2024.804.6018.400.000.00 3 2 06.600.000.00 4 4 2.309.201.907.600.000.00 5 1 0.600.600.800.800.000.00 6 7 Sum of products 51.2038.900.00 1/3 Common int. bet. bths. 0.4380.1430.00 Section areas 22.435.560.00 Multipliers 141 Products 22.4322.240.00 1/3 Common int. bet. areas. 0.650 0.650 0.650 Volume (m3) 14.5814.460.00 Total volume (m3)29.04 (3) Details of Gross Tonnage under Tonnage Deck Name and location Mean length Mean breadth Mean height VolumeTons Under the tonnage deck Volume Tons (1) Bulb Bow Under the tonnage deck 70477.44 24878.54 L=5.20 m Double-bottom compartments for cargo or fuel 1.00 L.D.O.T.(P) FrNos.30 36 29.90 10.55 2.80 L.D.O.T.(S) FrNos.35 40 34.00 12.00 3.90 F.O. Overflow T. FrNos.36 40 28.40 10.03 A=7.20?4.20 =24.08 m2 F.O. Drain T. FrNos.37 39 11.90 4.20 4.00 3.30 2.20 V=2/3LA=2/3?5.20?24.08=83.48m383.48 29.47 (2) M/E L.O. Sump. T. FrNos.23 36 17.50 6.18 (4) CALCULATION SHEETS FOR TONNAGE MEASUREMENT Details of Gross Tonnage Between Tonnage Deck and Upper Deck Mean length Mean length Common int. bet. bths. Common int. bet. bths. No. of bths. Bths. Mult. ProductsHeights Mult. Products No. of bths Bths.Mult.ProductsHeights Mult. Products 1 2 3 4 5 6 7 8 9 10 11 12 13 Total Total Total Total 1/3 Common int. bet. bths. Mean height 1/3 Common int. bet. bths. Mean height Horizontal area Horizontal area Volume Volume Tons Tons Break or Breaks Mean length Mean length Common int. bet. bths. Common int. bet. bths. No. of bths. Bths. Mult. ProductsHeights Mult. Products No. of bths Bths.Mult.ProductsHeights Mult. Products 1 2 3 4 5 6 7 8 9 10 11 12 13 Total Total Total Total 1/3 Common int. bet. bths. Mean height 1/3 Common int. bet. bths. Mean height Horizontal area Horizontal area Volume Volume Tons Tons (5) CALCULATION SHEETS FOR TONNAGE MEASUREMENT Details of Gross Tonnage Permanently Covered and Closed-in Spaces Above the Upper Deck Items Name and location Mean length Mean breadth Mean height Tons Tons Tons Forecastle Forecastle Mean length 13.80 m FrNos.214 Fore 152.19 No. of bths. Multi- pliers Bths. Pro- ducts 11 1.60 1.60 Less: 24 14.30 57.20 Hawse pipe (p & s) 31 22.70 22.70 FrNos.222 226 4 2?1/4?0.802?6.00 5 = 6.03 m3-2.13 Sum of products 81.50 1/6 Mean length 2.30 Plus: Small hatchway Mean height 2.30 FrNos.232 234 1.20 1.20 0.60 0.30 Volume431.14 m3 Total150.36 Bridge Bridge Mean length No. of bths. Multi- pliers Bths. Pro- ducts 1 2 3 4 5 Sum of products 1/12 Mean length Mean height Volume Space under overhead deck Mean length No. of bths. Multi- pliers Bths. Pro- ducts FrNos.26 27 2?0.90 3.30 2.90 6.08 1 FrNos.31 32 2?0.90 3.50 2.90 6.45 2 FrNos.35 36 2?0.90 3.70 2.90 6.82 3 FrNos.38 39 2?0.90 3.75 2.90 6.91 4 FrNos.41 42 2?0.90 3.75 2.90 6.91 5 FrNos.43 45 2?1.70 3.75 2.90 13.05 Sum of products 1/12 Mean length Total 46.22 Mean height Volume (6) CALCULATION SHEETS FOR TONNAGE MEASUREMENT Details of Gross Tonnage Permanently Covered and Closed-in Spaces Above the Upper Deck Name and location Mean length Mean breadth Mean height VolumeTons Tons Tons (1) R.H. 1st tier FrNos.26 45 15.7022.302.10 735.23259.54 Plus: FrNos.14 23 6.90 19.502.10 282.5699.74 FrNos.12 14 1.10 12.602.10 29.1110.28 (2) R.H. 2nd tier FrNos.26 45 14.8022.402.10 696.19245.76 Plus: FrNos.14 23 6.90 8.70 2.10 126.0644.50 (3) R.H. 3rd tier FrNos.26 45 14.8022.402.10 696.19245.76 Plus: FrNos.14 23 6.90 8.70 2.10 126.0644.50 (4) R.H. 4th tier FrNos.26 45 14.8022.402.10 696.19245.76 (5) R.H. 5th tier FrNos.26 45 14.8022.402.10 696.19245.76 (6) R.H. 6th tier FrNos.26 37 8.50 12.402.10 221.3478.13 Plus: FrNos.37 45 6.00 18.202.10 229.3280.95 Roundhouses (7) CALCULATION SHEETS FOR TONNAGE MEASUREMENT Details of Gross Tonnage Permanently Covered and Closed-in Spaces Above the Upper Deck Name and location Mean length Mean breadth Mean height VolumeTons Tons Tons Hose store FrNos.88 98 2?7.75 2.95 2.60 118.8941.97 Pump RM casing FrNos.45 50 3.70 5.80 2.60 55.8019.70 Side houses, Mast houses, Cranes Hatchways of C.O.T. FrNos.52 54 FrNos.59 61 FrNos.84 86 FrNos132 134 14?(?0.3752+0.75?0.75) ?0.70 FrNos.138 140 =9.82 3.45 FrNos.165 167 FrNos.192 194 Total26737.47 *One half percent of the gross tonnage exclusive of hatchways 133.69 *Excess of hatchways 0.00 Hatchways Total permanently covered and closed-in space above the upper deck1858.93 GROSS TONNAGE 26737.47 * For Suez Canal Tonnage (8-1) CALCULATION SHEETS FOR TONNAGE MEASUREMENT Deductions from Gross Tonnage Name and location Mean length Mean breadth Mean height VolumeTons Tons Tons Deck wardrobes 4.802.102.1021.177.47 Eng. wardrobes 4.002.102.1017.646.23 Drying Rm. 2.401.902.109.583.38 Spare part Rm. 4.803.702.1037.3013.17 Store Rm. (S) 2.402.402.1012.104.27 Clean equipment Rm. 4.802.002.1020.167.12 Store Rm. (A) 1.604.502.1015.125.34 Passageways 1.6021.002.1070.5624.91 Stair way (Upper deck) 2.404.002.1020.167.12 79.01 Stewards 4.803.702.1037.3013.17 Duty Rm. 4.802.902.1029.2310.32 Store Rm. 4.802.102.1021.177.47 Hospital 4.005.002.1042.0014.83 Mess room 6.4011.202.10150.5353.14 Plus 2.402.902.1014.625.16 Passageways 1.6021.002.1070.5624.91 Stair way (Boat deck) 2.404.002.1020.167.12 136.12 Seaman 2.805.002.1029.4010.38 Seaman 2.805.002.1029.4010.38 Carpenter 2.805.002.1029.4010.38 Boatswain 3.505.002.1036.7512.97 Seaman 4.802.402.1024.198.54 Seaman 4.802.392.1024.098.50 Seaman 4.802.322.1023.398.26 Seaman 4.802.402.1024.198.54 Chief cook 3.555.002.1037.2813.16 Motor man 2.805.002.1029.4010.38 Motor man 2.975.002.1031.1911.01 Motor man 2.855.002.1029.9310.57 Crew s accommodation (8-2) CALCULATION SHEETS FOR TONNAGE MEASUREMENT Deductions from Gross Tonnage Name and location Mean length Mean breadth Mean height VolumeTons Tons Tons Deck meeting Rm. 6.204.802.1062.5022.06 Passageways 2? 14.201.602.1095.4233.68 Plus 1.609.602.1032.2611.39 Stair way (Accom. Deck) 2.404.002.1020.167.12 197.32 Motor man 2.905.002.1030.4510.75 Motor man 2.905.002.1030.4510.75 Motor man 2.905.002.1030.4510.75 Chief Motor man 4.803.502.1035.2812.45 Eng. meeting Rm. 6.404.802.1064.5122.77 Store Rm. 2.404.802.1024.198.54 Passageways 7.801.602.1026.219.25 85.26 Crew s accommodation (9) CALCULATION SHEETS FOR TONNAGE MEASUREMENT Deductions from Gross Tonnage Name and location Mean length Mean breadth Mean height VolumeTons Tons Tons Officer mess Rm. 4.805.002.1050.4017.79 Gymnasium Rm. 7.204.502.1068.0424.02 2nd engineer 6.405.002.1067.2023.72 Elec. engineer 4.806.402.1064.5122.77 Chief engineer 6.405.002.1067.2023.72 Plus 4.802.902.1029.2310.32 4th engineer 4.005.002.1042.0014.83 3rd engineer 4.805.002.1050.4017.79 Passageways 1.6011.102.1037.3013.17 Plus 9.401.602.1031.5811.15 Stairway (Upper deck) 2.404.002.1020.167.12 186.40 Doctor 4.805.002.1050.4017.79 Recreation Rm. 6.409.602.10129.0245.54 Chief officer 6.405.002.1067.2023.72 2nd officer 4.805.002.1050.4017.79 3rd officer 4.005.002.1042.0014.83 Passageways 7.901.602.1026.549.37 Plus 9.401.602.1031.5811.15 Stairway (Upper accom. Deck) 2.404.002.1020.167.12 Radio officer 4.404.602.1042.5015.00 162.31 Officer s accommodation Master?s office 6.405.002.1067.2023.72 Bed Rm. 2.902.902.1017.666.23 W.C. 1.902.902.1011.574.08 Reception 4.803.402.1034.2712.10 Passageways 1.606.402.1021.507.59 53.72 Master s accommodation (10) CALCULATION SHEETS FOR TONNAGE MEASUREMENT Deductions from Gross Tonnage Name and location Mean length Mean breadth Mean height VolumeTons Tons Tons Air cond. Rm. 8.805.002.1092.4032.62 Laundry 4.802.402.1024.198.54 Plus 2.401.902.109.583.38 Galleys 8.806.602.10121.9743.06 Smoking Rm. 4.804.802.1048.3817.08 W.C. (1st tier) 2.401.802.109.073.20 W.C. (2nd tier) 2.401.302.106.552.31 W.C. (3rd tier) 2.401.302.106.552.31 W.C. (4th tier) 2.401.302.106.552.31 W.C. (5th tier) 2.401.302.106.552.31 W.C. (6th tier) 2.202.402.1011.093.91 121.03 Galleys, *(Bakers, laundry, refrigerating, disinfecting, disfilling and ventilating apparatus, water-closets and lavatories exclusively for the use of the officers and crew)*(Boatswains stores, Engineer s shoup Water ballast) (11) CALCULATION SHEETS FOR TONNAGE MEASUREMENT Deductions from Gross Tonnage Name and location Mean length Mean breadth Mean height VolumeTons Tons Tons Wheel house 6.4018.602.10249.9888.24 Radio Rm. 4.403.602.1033.2611.74 Radio store Rm. 2.201.802.108.322.94 Nav. Store Rm. 2.202.402.1011.093.91 Battery Rm. 2.201.902.108.783.10 Converters Rm. 1.503.602.1011.344.00 Store Rm. 1.502.402.107.562.67 Passageways 5.201.602.1017.476.17 Stair way (Nav. Deck) 2.203.602.1016.635.87 Inert Gases Rm. 7.204.505.20168.4859.47 Emergency generator Rm. 7.203.602.1054.4319.21 CO2Rm. 7.204.502.1068.0424.02 Foam Rm. 4.803.202.1032.2611.39 Plus 1.601.602.105.381.90 Fire control & equipment Rm. 3.902.902.1023.758.38 Windlass gear 4.005.602.6058.2420.56 Chain locker 2? 2.302.402.6028.7010.13 Fire equipment Rm. 1.309.502.6032.1111.33 Emergency fire pump Rm. 1.806.402.4027.659.76 Plus 1.201.606.6012.674.47 309.26 Closed-in spaces above the uppermost deck used in working the ship Total deductions other than propelling power 1330.43 *Total deductions permissible, (viz.10/100gross tonnage) 2673.75 NET TONNAGE (if a sailing ship)25407.04 *For Suez Canal Tonnage (12-1) CALCULATION SHEETS FOR TONNAGE MEASUREMENT Detailed Measurement for Propelling Power Deduction Name, location and dimensions Tons Name, location and dimensions Tons 1. Floor (FrNos.14 45) 3?2.51?3.01?2.41 = 54.62 m3 -19.28 Space tonnage: Ballast pump (FrNos.42 44) 1.80 2?2.01?1.91?2.61 = 20.04 m3 -7.07 9.00 No.1 F.O.T. (S) (FrNos.39 45) 24.80?15.60?6.20 = 2296.15 m3810.544.80?5.20?4.70 = 117.31 m3 -41.41 21.20 No.1 F.O.T. (P) (FrNos.39 45) 25.40 4.80?4.30?4.70 = 97.01 m3 -34.24 M/E L.O. Sump. T. (FrNos.23 36) 6.18Actual floor tonnage: 622.37 Less: Pump Rm. (FrNos.40 45) 2. Mid-flat (FrNos.14 45) 4.00?14.60?3.00 = 175.20 m3-61.85 Space tonnage: Fire pump (FrNos.38 39) 15.40 1.71?1.61?3.11 = 8.56 m3 -3.02 20.10 Bilg
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 年鉴基础知识培训课件
- 其他项目规划方案(3篇)
- 行政节日预算方案(3篇)
- 有关搬迁的宣传方案(3篇)
- 吉林省松原市前郭县达里巴乡中学·2025届七年级期中检测 历史i试卷(含答案)
- 2025年内蒙古锡林郭勒盟公安局招聘警务辅助人员考试笔试试题(含答案)
- 平安普惠无抵押贷款课件
- 河南省驻马店2026届高三上化学期中质量检测试题含解析
- 2025-2030中国新兴能源产业营销创新分析及前景规划预测报告
- 干体重的意义及设置课件
- 养生茶基础知识培训课件
- 问题解决过程PSP-完整版
- (完整版)中医适宜技术课件
- 机关、团体、企事业单位消防安全管理规定
- GB/T 20221-2023无压埋地排污、排水用硬聚氯乙烯(PVC-U)管材
- 等速肌力测试单关节或关节链不同运动模式以及运动角速度下的肌力参数
- 学生军训缓训(免训)申请表
- 真石漆施工工艺及要求【实用文档】doc
- 2017-2022年高考英语浙江卷七选五试题真题及答案汇编
- YB/T 117-1997高炉用耐火材料抗渣性试验方法
- GB/T 4744-2013纺织品防水性能的检测和评价静水压法
评论
0/150
提交评论