1 2 5 1-单风道VAV安装维护手册-中文_第1页
1 2 5 1-单风道VAV安装维护手册-中文_第2页
1 2 5 1-单风道VAV安装维护手册-中文_第3页
1 2 5 1-单风道VAV安装维护手册-中文_第4页
1 2 5 1-单风道VAV安装维护手册-中文_第5页
已阅读5页,还剩28页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

INSTALLATION, OPERATION disconnect all power and control cir- cuits prior to servicing to avoid burns. Check that rigging and lifting equipment can safely support the unit assembly and component weights. CAUTION identifies a hazard which could lead to damage to the machine, damage to other equipment and/or environmental pollution. Usually an instruc tion will be given, together with a brief explanation. / NOTE is used to highlight additional information which may be helpful to you. All assemblies must be adequately secured during lifting and rigging by temporary supports and restraints until equipment is permanently fastened and set in its final location. All unit temporary and permanent supports must be capable of safely support- ing the equipments weight and any additional live, seismic or dead loads that may be encountered. All supports must be designed to meet applicable local codes and ordinances. INSTALLATION, OPERATION also check the centers of gravity and any specific rigging instructions. CHECK for adequate ventilation so fumes do not migrate through ductwork to occupied spaces when welding or cutting around the unit. DO NOT work on damper until associated actuator is disconnected. INSTALLATION, OPERATION an adapter must be used for metric ductwork. 4, 5, 6, 8, 10, 12, 14 and 16 INSTALLATION DO NOT HANDLE EQUIPMENT S HEATING ELEMENTS, AS PERMANENT DAMAGE MAY OCCUR. All terminal equipment with electric heaters must be installed in a horizontal plane with respect to the airflow stream. Low height equipment (Model SDL) can be flipped over in the field to vary or change control section handing. Clearances All equipment covered in this document, including those with electric heat, are ETL listed for 0.0 clearance to combustibles. Refer to NEC and/or local codes for minimum electrical clearances required for service. Equipment should not make contact with any structure located above the equipment without appropriate isolation. Equipment supplied with bottom access panels requires sufficient clearance to access fasteners, and to lower and slide panel horizontally until clear of bottom of unit. NEC INSTALLATION, OPERATION care must be exercised to avoid damaging fins. Do not use solutions to clean coils; drain pans are not present to remove collected solution. Important: Coils may become externally dirty as result of normal operation. Dirt on the surface of the coil reduces its ability to transfer heat that can result in reduced performance, and increased operating energy cost. If the dirt on the surface of the coil becomes wet, microbial growth (mold) can result, possibly causing unpleasant odors and serious health related indoor air quality problems. INSTALLATION, OPERATION however, if the voltage ap- pears to be changing at regular intervals, it may be assumed that this function is operating properly. INSTALLATION, OPERATION however, if the voltage appears to be chang- ing at regular intervals, it may be assumed that this function is operat- ing properly. 8. If the heater always remains energized when power is applied, remove the wire from P4 of the interface circuit board. If the heat remains on, there is a wiring error or the SSR is defective. 8. P4 SSR Remove Power From the Unit Before Proceeding With the Next Step. 9. If the heater is always de-energized when power is applied, remove the line and load connections to the proportional heat control and temporarily tie them together. If the system is a three phase arrangement, do the phases one at a time. 9. Always remove power from the unit before moving to the next phase. Make sure there is no danger of the temporary connection shorting to another component or the chassis. Briefly reapply power. If the section of heat under test now energizes, the SSR is defective. If heater still will not energize, one of the heater safety devices (limits, safety contactor or airflow switch) or elements is defective. SSR INSTALLATION, OPERATION Low side indicated by black tubing. 3. FlowStarTM INSTALLATION, OPERATI

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论