



全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
CONTRACT ORIGINALNo. 92NGS/92602THDate:MAR. 2, 1992The Buyer: China tobacco Import & Export Corporation shanghai Branch 6/F LONGMEN HOTEL 777 HENGFENG ROAD SHANGHAI CHINA TLX:33496 SHATO CN POST DODE:200070The Seller: FIL THAI COMPANY LIMITED 328 PHAHOLYOTHIN RD. P.O. BOX BK 4-53 BANGKOK 10400 THAILAND TLX 82816 PRACHUM TH This contract is signed by and between the Buyer and the Seller, according to the terms and conditions stipulated below:Commodity and SpecificationsQuantityUnit PriceCHARCOAL DUAL FULTER RODSIZE: 120 x7.7 (MM)WEIGHT: 10.0GMHARDNESS: 91 PCPD: 380(DRSCB 120043-008)100 MILLION PCSUSD 4.74/ 1,000 PCSCFR SHANGHAI PACKING CHARGES INCLUDED TOTAL 100 MILLION PCSAT USD 474,000.Total Amount: USD FOUR HUNDRED SEVENTY FOUR THOUSAND ONLY2. Country of Origin and Manufacture:FILTHAI COMPANY LIMITED THAILAND3. Port of Shipment:BANGKOK THAILAND4. Port of Destination:Shanghai China5. time of Shipment:(1) 20M RODS EARLY MAY 1992(2) 40M RODS BY END OF MAY 1992(3) 40M RODS BY END OF JUNE 19926. Insurance: To be covered by the Buyer.7. Packing: To be packed by strong materials, suitable for long distance ocean transportation and well protected against dampness, moisture, shock, rust and rough handling. The Seller shall be liable for any damage to the goods on account of improper packing.8. Shipping Mark:The Seller shall mark on each Package with fadeless paint, The package number, gross weight net weight, 92NGS/92602TH Measurements and the following shipping mark: SHANGHAI/CHINA9. Guarantee of Quality:The Seller shall guarantee the goods in all respects with the quality, specifications and technical terms as stipulated in this Contract. The quality guarantee period will be 12 months starting from the date on which the goods arrive at the port of destination. In the guarantee period, the Seller shall be liable for any damage and quality discrepancies caused by factory designs or manufacture defects.10. Inspection and Claims:(1) The Commodity Inspection Authorities or the manufacturer shall, before delivery, make a precise and comprehensive inspection of the goods as regards their quality, specification and quantity, and issue certificates, indicating the technical data and results of the test.(2) After arrival of the goods at the port of destination, the Buyer shall apply to the China Commodity Inspection Bureau for a reinspection of the goods. If any defective goods or discrepancies are found by the Bureau regarding the specifications and quantity. The Buyer shall, within 90 days after unloading of the goods at the port of destination, claim against the Seller on the strength of the inspection certificate issued by the Bureau. If the goods are not in conformity with the stipulations of this contract, in accordance with the Buyers claim the Seller should be responsible for replacement with new goods, compensation or devaluate the goods, and to bear all direct losses and expenses in connection therewith including interest accrued, banking charges, freight, insurance premium, inspection charges, storage, stevedore charges and all other necessary expenses required for the custody and protection of the rejected goods.(3) Should the Seller disagree the claim he must notify in written form within two weeks after receipt of the Buyers claim. Overdue, all claims shall be regarded as accepted by the Seller.11. Terms of Payment: Remittance by bankers demand draft.12. Terms of shipment:(1) In case of FOB Terms:a. Booking of shipping space shall be attended to by Buyers shipping Agent, China National Foreign Trade transportation Corporation.b. For each shipment the Seller shall, 30 days before the date of delivery stipulated in clause 5 hereof, advise the Buyer/by cable/telex of the date of readiness, 15 days before the date of shipment, advise the Buyer by cable/telex of the Contract number, name of commodity, quantity, value, number of packages gross weight and measurements for the Buyer to book shipping space.c. The Seller shall be liable for any dead freight of demurrage consequent upon his failure to have the goods ready for loading after the carrying vessel has arrived at the port of loading on time.d. The Seller shall bear all the risks before the goods pass over the vessels rail and 50% of all loading expenses. The loading expenses shall mean all expenses accrued in the handling of the goods from side of the ship to the cabin (to were the Buyers vessel derrick can reach in the vessel), including all crane charges for heavy goods, but not, including stowing charge, trimming charge, consolidation charge, damage charge or open and close hatch charge.(2) In case of C & F Terms:a. The Seller shall ship the goods from the port of shipment to the port of destination in China directly within the shipment time, stipulated in Clause 5 of this Contract, trans-shipment is not allowed.b. The carrying vessel shall not be the one of the nationality unacceptable to the Buyer.13. Shipping Advice:(1) Immediately after the goods are completely loaded, the Seller shall cable/telex the Buyer and China National Foreign Trade Transportation Corporation at the port of destination the contract number and name of commodity, and quantity, gross weight, invoiced value, name of the carrying vessel, the port of shipment, the date of sailing and the port of destination as specified on the shipping mark.(2) In case the Buyer fail to arrange insurance in time due to the Sellers failure to advise in time, all losses shall be borne by the Seller.14. Documents:For negotiation, the Seller shall present the following documents to the paying bank after shipment:(1) 3 copies of Negotiable Clean on Bill of Lading made out to order, blank endorsed, and notifying the China National Foreign Transportation Corporation at the port of destination ( In case of FOB terms, marked “Freight To Collect”; In case of C & F Terms, marked “Freight Prepaid”)(2) 5 copies of Invoice, indicating contract number, name of commodity, quantity, unit price and total amount. In case of shipment in lots, lots number must be indicated.(3) 4 copies of Packing List.(4) One copy of Certificate of Quantity and Quality issued by the Manufacturers or by the Commodity Inspection Authorities of the manufacturers country.(5) The operation instructions and technical documents as stipulated in the Contract Appendix or a certificate which certifies that all documents mentioned above have already be packed and dispatched together with each consignment. The documents mentioned above shall be made separately according to the shipping mark, the different shipping mark shall not be listed in the same set of the Bills. The Seller shall send one set of the above mentioned documents, except 4 and 5 to the China National Foreign Trade Transportation Corporation at the port of destination with the vessel, and within 3 days after shipment is effected, two sets by airmail to the Buyer and one set to the China National Foreign Trade Transportation Corporation at the port of destination.15. Force Majeure:Within the delivery period as stipulated in this contract, whatever it is in the process of making, shipment or transportation, the Seller shall not be held responsible for and delay in delivery of goods due to Force Majeure, such as war, severe disasters of flood, fire, wind, snow and earthquake. However, the Sellers shall inform the Buyer by cable/telex immediately of the occurrence mentioned above and within 15 days thereafter, shall send by airmail to the Buyer for their acceptance a certificate issued by the Chamber of Commerce or the registered surveyor of the place where the accident occurs as evidence thereof. Under such circumstances the Seller however, are still under the obligation to take all necessary measures to hasten the delivery of the goods, and advise to the Buyers of particulars of measures. The Buyers shall have right to agree or cancel this Contract according to the circumstances. In case the accident lasts for more than ten weeks, the Buyer shall have the right to cancel this Contract.16. Late Delivery and Penalty: In case of delayed delivery, except for force majeure cases, the Seller shall pay to the Buyer for every week of delay a penalty amounting to 0.5% of the total value of the goods whose delivery has been delayed. Any fractional part of a week is to be considered a full week. The total amount of penalty shall not, however, exceed 5% of the total value of the goods involved in late delivery and is to be deducted from the amount due to the Seller by the paying bank at the time of negotiation, or by the Buyer direct at the time of payment. In case the period of delay exceeds 10 weeks after the stipulated delivery date the Buyer have the right to terminate the Contract but the Seller shall not thereby be exempted from the payment penalty.17. Arbitration:All disputes in connection with the Contract or the execution thereof shall be settled through friendly negotiations. In case no settlement can be reached through negotiation, the case should then be submitted for arbitration to the Foreign Trade Arbitration Commission of the China Council for the Promotion of International Trade, Shanghai, in accordance with the “Provisional Rules or Procedure of the Foreign Trade Arbitration Commission of the China Council for the Promotion of International Trade”. The arbitration shall take place in Shanghai and the decision rendered by the said Commission shall be final an
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 付费推广活动方案
- 仙海公司团建活动方案
- 代表旁听庭审活动方案
- 以旧换新活动活动方案
- 企业体育活动方案
- DB61T-草地分类指南
- 企业中式活动策划方案
- 企业保卫部门活动方案
- 企业公司年会策划方案
- 企业创始人培训活动方案
- 明清时期科技与文化课件统编版七年级历史下册
- 2025财务部上半年工作总结与风险控制
- 2025年网络安全与信息技术考试试卷及答案
- 《学前儿童语言教育》课件-第2章 学前儿童语言的获得与发展
- 神奇校车考试题及答案
- 2025-2030中国造纸行业市场前景趋势及竞争格局与投资研究报告
- 肠梗阻患者护理查房
- 无人机维护保养知识试题及答案
- 2025-2030中国体外诊断(IVD)行业市场发展分析及前景趋势与投资研究报告
- 2024年吉林吉林事业单位招聘考试真题答案解析
- 香港应聘简历模板
评论
0/150
提交评论