版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Manipulator is now used as a industrial robots in use, the control objectives often appear often in industrial automation. Industrial automation technology has gradually matured, as mature a technology line has been rapid development in industrial automation as a separate subject. Manipulator applic
2、ation began to filter into welding, logistics, mechanical processing, and other industries. Especially at high or very low temperatures, full of poisonous gases, high radiation case, robot in similar circumstances showed great use also brings great convenience to the staff. Precisely because of this
3、 robot to get peoples attention began to be a high degree of development. Labor rates, working conditions, labor intensive aspects of promoting development. Both at home and abroad to develop the PLC (programmable logic controller) is in various special circumstances and under special conditions set
4、 for mechanical devices. Now turned on the development of the microelectronics automatic control technology and the rapid development of the trains, the success of PLC hardware software and simulation control win big and successful development, now continues to develop as a factory automation standa
5、rds. Because robots are good development of the technology makes a good optimization of productive capital, and robot shows this unique advantages, such as: has good compatibility, wide availability, hardware is complete, and programming that can be mastered in a short time, so in the context of ind
6、ustrial PLC applications became ubiquitous. Manipulator in many developed country agriculture and industry has been applied, such as the use of mechanical harvesting large areas of farmland, repeated operations on the high-speed line that uses a robotic arm, and so on. Today, the high level of autom
7、ation combined with restrictions on the manipulator development level is slightly lower than the international. The design is mainly arm welding machine by PLC Automation control. This of design let designers on in school by learn of has a must of consolidation, understand has some usually didnt opp
8、ortunities awareness in world range within some leading level of knowledge has has must awareness, hope designers can in yihou of design in the can success of using in this design in the proceeds of experience 1.2 manipulator in both at home and abroad of research profile automation mechanical arm r
9、esearch began Yu 20th century medium-term, after years with with computer and automation technology of development, Makes mechanical arm on the Grand stage of industrial automation and shine, gradually became an industrial evaluation standards, and its importance can be seen. Now original robotic ar
10、m spent most of mass production and use on the production line, which is programmed robotic arm. As the first generation of manipulator position control systems main features, although not back several generations that can detect the external environment, but can still successfully complete like wel
11、ding, painting, delivery as well as for materials simple movements. Second generation mechanical arms are equipped with sensors and manipulators have the environment there is a certain amount of sense, when the mechanical arm is to use the program as a basis. Difference is that the robot begand山东省家庭
12、居室装饰装修工程质量验收办法1、基本原则1.01本办法根据建设部住宅装饰装修工程施工规范、建筑装饰装修工程质量验收规范、民用建筑工程室内环境污染控制规范、住宅室内装饰装修管理办法和山东省家庭居室装饰装修管理办法的要求而制定。1.02住宅装饰装修工程施工应符合国家现行有关标准、规范的规定。1.03装饰装修应在业主的幢户、分户门以内的住户面积范围内进行,不得占用公共空间,不得因装饰影响毗邻房屋的安全及使用环境。1.04装饰装修设计施工必须确保建筑物原有安全性、整体性,不得任意改变建筑物的承重结构,不得随意破坏建筑物外立面,若需开凿安装空洞,在设备安装后应力求按原有外墙装饰效果修整。1.05住宅室内
13、装饰装修活动禁止下列行为:(一)未经原设计单位或者具有相应资质等级的设计单位提出设计方案,变动建筑主体和承重结构;(二)将没有防水要求的房间或者阳台改为卫生间、厨房间;(三)扩大承重墙上原有的门窗尺寸,拆除连结阳台的砖、混凝土墙体;(四)损坏房屋原有节能设施,降低节能效果;(五)其他影响建筑结构和使用安全的行为。1.06采购的装饰材料质量应符合该产品有关标准质量要求和设计要求。成品供货单位应提供产品质保书或检验报告。施工前,必须对材料进行严格验收,合格后如有木质材料必须进行防虫、防火处理,方可进行施工。在供需双方有争议时,可由法定建材质检机构仲裁检验。严禁使用国家明令淘汰的材料。1.07装饰人
14、从事住宅室内装饰装修活动,未经批准不得有下列行为:(一)搭建建筑物、构筑物;(二)改变住宅外立面,在非承重外墙上开凿门、窗;(三)拆、改供暖管道和设施;(四)拆、改燃气管道和设施。1.08燃气管道不得暗敷,不得穿越卧室,穿越吊顶内的燃气管道不得有接头。如确需移动表具,应由业主向燃气主管部门提出申请,经批准后,由具有有关资格证书的部门、人员进行施工安装。1.09对安装、使用有特殊规定的材料制品和设备,施工时应严格按其说明书的规定进行。1.10供需双方在装饰前应签订施工合同。合同中应包括造价、设计要求、材料品种、规格和等级,依据的质量标准,施工期限和质量保修等内容。在选材时应优先采用节能型、阻燃型
15、和环保型装饰材料及用具。1.11管线盒隐蔽前应由业主与装饰企业进行隐蔽前的验收。并签字,符合要求方可隐蔽。1.12家居装饰前,应完成家装装饰设计图,并达到一定的深度,指导施工。2、抹灰工程2.01抹灰工程质量及验收应符合GB50210-2001第四章的有关规定2.02表面应洁净,接茬平顺,线角顺直,粘接牢固,无脱层空鼓,无爆灰和裂缝等缺陷。(采用目测,手摸,用小锤轻敲检查)2.03抹灰质量允许尺寸偏差及验收方法应符合表1的要求:表1 抹灰质量允许尺寸偏差及验收方法 项次项 目普通抹灰允许偏差(mm)检验方法1 立面垂直度4用2m垂直检测尺检查2 表面平整度4用2m靠尺和塞尺检查3 阴阳角方正4
16、用直角检测尺检查4 分格条(缝)直线度4拉5m线,不足5m拉通线,用钢直尺检查5 墙裙、勒脚上口直线度4拉5m线,不足5m拉通线,用钢直尺检查注:1)普通抹灰,本表第3项阴角方正可不检查; 2)顶棚抹灰,本表第2项表面平整度可不检查,但应平顺。3、门窗工程3.01门窗安装工程质量的验收应符合规定GB50210-2001第五章有关规定。3.02门窗安装必须牢固。预埋木砖的防腐处理,木门窗固定点的数量、位置及固定方法应符合设计要求;门窗扇必须安装牢固,并应开启灵活,关闭严密,无倒翘。(检查方法:观察检查,开启和关闭检查,手扳检查)3.03木门窗表面应洁净,不得有刨痕、锤印;木门窗的割角、拼缝应严密
17、平整;门窗框的裁口应顺直,刨面应平整,木门窗上的槽、孔应边缘整齐,无毛刺;木门窗批水、盖口条、压缝条,密封条的安装应顺直,与门窗结合应牢固、严密。(检查方法:观察,手板检查)3.04木门窗制作的允许偏差和检验方法应符合表2的规定。 表2 木门窗制作的允许偏差和检验方法项次项目构件名称允许偏差(mm)检验方法1翘曲框3将框、扇平放在检查平台上,用塞尺检查扇22对角线长度框、扇3用钢尺检查,框量裁口里角,扇量外角3表面平整度扇2用1m靠尺和塞尺检查高度、宽度框0;2用钢尺检查,框量裁口里角,扇量外角扇2;05裁口、线条结合处高低差框、扇1用钢直尺和塞尺检查6相邻棂子两端间距扇2用钢直尺检查3.05
18、木门窗安装的留缝限值、允许偏差和检验方法应符合表3的规定表3 木门窗安装的留缝限值、允许偏差和检验方法项次项目留缝限值(mm)允许偏差(mm)检验方法1门窗槽口对角线长度差3用钢尺检查2门窗框的正、侧面垂直度2用1m垂直检测尺检查3框与扇、扇与扇接缝高低差2用钢直尺和塞尺检查4门窗扇对口缝1-2.5用塞尺检查5门窗扇与上框间留缝1-26门窗扇与侧框间留缝1-2.57窗扇与下框间留缝2-38门扇与下框间留缝3-59双层门窗内外框间距-4用钢尺检查10无下框时门扇与地面间留缝外门4-7用塞尺检查内门5-8卫生间门8-123.06金属门窗表面应洁净、平整、光滑、色泽一致,无锈蚀。大面应无划痕、碰伤。
19、漆膜或保护层应连续;金属门窗框整体之间的缝除应填嵌饱满,并采用密封胶密封。密封胶表面应光滑、顺直,无裂纹;金属门窗扇的橡胶封条或毛毡密封应安装完好,不得脱槽。(检查方法:观察,轻敲门窗框检查,开启和关闭检查,检查隐蔽工程验收记录)3.07钢门窗安装的留缝限值、允许偏差和检验方法应符合表4的规定。表4 钢门窗安装的留缝限值、允许偏差和检验方法项次项目留缝限值(mm)允许偏差(mm)检验方法1门窗槽口宽度、高度1500mm2.5用钢尺检查1500mm3.52门窗槽口对角线长度差2000mm5用钢尺检查2000mm63门窗框的正、侧面垂直度3用1m垂直检测尺检查4门窗横框的水平度3用1m水平尺和塞尺
20、检查5门窗横框标高5用钢尺检查6门窗竖向偏离中心4用钢尺检查7双层门窗内外框间距5用钢尺检查8门窗框、扇配合间隙2用塞尺检查9无下框时门扇与地面间留缝4-8用塞尺检查3.08铝合金门窗安装的允许偏差和检验方法应符合表5的规定。表5 铝合金门窗安装的允许偏差和检验方法项次项目允许偏差(mm)检验方法1门窗槽口宽度、高度1500mm1.5用钢尺检查1500mm22门窗槽口对角线长度差2000mm3用钢尺检查2000mm43门窗框的正、侧面垂直度2.5用垂直检测尺检查4门窗横框的水平度2用1m水平尺和塞尺检查5门窗横框标高5用钢尺检查6门窗竖向偏离中心5用钢尺检查7双层门窗内外框间距4 用钢尺检查8
21、推拉门窗扇与框搭接量1.5 用钢直尺检查3.09涂色镀锌钢板门窗安装的允许偏差和检验方式应符合表6的规定。3.10塑料门窗表面应洁净、平整、光滑,大面应无划痕、碰伤;塑料门窗扇的密封条不得脱槽;玻璃密封条玻璃及玻璃口的接缝应平整,不得卷边、脱槽。(检查方法:观察)3.11塑料门窗安装的允许偏差和检验方法应符合表7的规定。表6 涂色镀锌钢板门窗安装的允许偏差和检验方式项次项目允许偏差(mm)检验方法1门窗槽口宽度、高度1500mm2用钢尺检查1500mm32门窗槽口对角线长度差2000mm3用钢尺检查2000mm43门窗框的正、侧面垂直度2.5用垂直检测尺检查4门窗横框的水平度2用1m水平尺和塞
22、尺检查5门窗横框标高5用钢尺检查6门窗竖向偏离中心5用钢尺检查7双层门窗内外框间距4用钢尺检查8推拉门窗扇与框搭接量1.5用钢直尺检查表7 塑料门窗安装的允许偏差和检验方法项次项目允许偏差(mm)检验方法1门窗槽口宽度、高度1500mm2用钢尺检查1500mm32门窗槽口对角线长度差2000mm3用钢尺检查2000mm53门窗框的正、侧面垂直度3用1m垂直检测尺检查4门窗横框的水平度3用1m水平尺和塞尺检查5门窗横框标高5用钢尺检查6门窗竖向偏离中心5用钢尺检查7双层门窗内外框间距4用钢尺检查8同樘平开门窗相邻扇高度差2用钢直尺检查9平开门窗铰链部位配合间隙2;1用塞尺检查10推拉门窗扇与框搭
23、接量1.5;2.5用钢直尺检查11推拉门窗扇与竖框平行度2用1m水平尺和塞尺检查4、墙面饰面板(砖)工程4.01饰面板(砖)工程质量验收应符合GB50210-2001第八章的有关规定。4.02饰面板(砖)表面应平整、洁净、色泽一致,无裂痕和缺损。石材表面应无碱等污染(检查方法:观察)。4.03饰面板(砖)按缝应平直、光滑,填嵌应连续、密实;宽度和深度应符合设计要求(检查方法:用小锤轻敲检查)。4.04采用湿作业法施工的饰面工程,石材应进行防碱背涂处理。4.05饰面板上的孔洞应套割 ,边缘整齐,墙面突出物周围的饰面砖应整砖套割,边缘整齐。墙裙、贴脸突出墙面的厚度应一致(检查方法:观察;尺量检查)
24、。4.06阴阳角处搭接方式,非整砖使用部位应符合设计要求。4.07饰面板安装的允许偏差和检验方法应符合表8的规定。4.08饰面砖粘贴的允许偏差和检验方法应符合表9的规定。表8 饰面板安装的允许偏差和检验方法项次项目允许偏差(mm)检验方法石材瓷板木材塑料金属光面1立面垂直度221.522用2m垂直检测尺检查2表面平整度21.5133用2m靠尺和塞尺检查3阴阳角方正221.533用直角检测尺检查4接缝直线度22111拉5m线,不足5m拉通线,用钢直尺检查5墙裙、勒脚上口直线度22222拉5m线,不足5m拉通线,用钢直尺检查6接缝高低差0.50.50.511用钢直尺和塞尺检查7接缝宽度11111用
25、钢直尺检查表9 饰面砖粘贴的允许偏差和检验方法项次项目允许偏差(mm)检验方法内墙面砖1立面垂直度2用2m垂直检测尺检查2表面平整度3用2m靠尺和塞尺检查3阴阳角方正3用直角检测尺检查4接缝直线度2拉5m线,不足5m拉通线,用钢直尺检查5接缝高低差0.5用钢直尺和塞尺检查6接缝宽度1用钢直尺检查5、地面工程5.01地面工程应符合建筑地面工程施工质量验收规范(GB502092002)的要求。5.02镶贴应牢固,表面平整干净,无漏贴错贴;缝隙均匀,周边顺直,砖面无裂纹,掉角、缺楞等现象,留边宽度应一致。5.03用小锤在地面砖上轻击,应无空鼓声。5.04厨房、卫生间应做防水层,与地漏结合处应严密。5
26、.04有防水要求的地面镶贴坡度应满足排水设计要求,与地漏结合处应严密牢固。5.05地面镶贴验收应按表10的规定进行。 表10 地面镶贴验收要求及方法项次项 目质量要求及允许偏差验收方法量具测量方法1外观符合5.02的要求目测全检2空鼓不允许小锤轻击3表面平整度2.0建筑用电子水平尺或2m靠尺、楔形塞尺每室测量二处,取最大值。4接缝高低差0.5钢直尺、楔形塞尺5接缝直线度3.05m拉线、钢直尺6间隙宽度2.0钢直尺7排水坡度坡度应2,并满足排水要求,应无积水现象建筑用电子水平尺或泼水试验全检5.06木地板表面应洁净,无沾污、磨痕、毛刺等现象。木搁栅的含水率应16.0%。地板铺设应无松动,行走时无
27、明显响声。地板与场面之间应留8mm12mm的伸缩缝。5.07木地板的铺设质量验收要求和方法应按表11的规定进行,在采用素板时,在地板油漆前进行验收;当采用漆板时,在漆板铺设后进行验收。卫浴地板等特殊规格的地板应按产品说明书操作。表11 木地板的铺设验收要求和方法项次项 目质量要求及允许偏差验收方法量具测量方法1表面平整度浸渍纸层压木质地板2.0建筑用电子水平尺或2m靠尺、楔形塞尺每室测量三处,取最大值。实木复合地板2.0实木地板a)2.02缝隙宽度浸渍纸层压木质地板0.5塞尺实木复合地板0.5实木地板0.53地板接缝高低浸渍纸层压木质地板0.5钢直尺、楔形塞尺实木复合地板0.5实木地板0.54
28、地板翘曲度浸渍纸层压木质地板0.5%实木复合地板0.5%实木地板0.5%5安装与墙面之间应留8mm-12mm的伸缩缝钢直尺测量四边行走无明显响声行走一圈6外观符合5.06的要求手感、目测全检注: a)本表实木地板所列允差适用于柚木、白栎、印茄木树种的地板,其他树种的 可参照执行。6、涂饰、吊顶、裱糊工程6.01涂饰工程质量及验收应符合GB50210-2001第十章的有关规定。6.02涂料涂饰工程应涂饰均匀,粘结牢固,不得漏涂、透底、起皮和反锈。6.03吊顶工程质量验收应符合GB50210-2001第六章的有关规定。6.04裱糊工程质量验收应符合GB50210-2001第十一章的规定。7、细部工
29、程7.01细部工程质量验收应符规范GB50210-2001第十二章规定。7.02橱柜工程质量验收。7.02.1橱柜安装预埋件或后置预埋件的数量、规格、位置及橱柜的造型、尺寸、安装位置、制作和固定方法应符合设计要求。(检查方法:观察;检查隐蔽验收记录或施工记录)7.02.2橱柜的抽屉和柜门应开关灵活、位置正确(检查方法:手板检查)。7.02.3橱柜表面应平整、洁净、色泽一致,不得有裂缝、翘曲及损坏。橱柜裁口应顺直、拼缝应严密(检查方法:观察)。7.02.4橱柜安装的允许偏差和检验方法应符合表12的规定。表12 橱柜安装的允许偏差和检验方法项次项 目允许偏差(mm)检验方法1外型尺寸2用钢尺检查2
30、立面垂直度3用1m垂直检测尺检查3门与框架的平行度3用钢尺检查 7.03窗帘盒、窗台板和散热器罩工程质量验收。7.03.1窗帘盒配件的品种、规格及窗帘盒、窗台板和散热器罩的造型、规格、尺寸、安装位置和固定方法必须符合设计要求,安装应牢固(检查方法:观察;尺量检查;手板检查)。7.03.2窗帘盒、窗台板和散热器罩表面应平整、洁净、线条顺直、按缝严密、色泽一致,不得有裂缝翘曲及损坏。窗帘盒、窗台板和散热器罩与墙面、窗框的衔接应严密,密封胶应顺直、光滑(检查方法:观察)。7.03.3窗帘盒、窗台板和散热器罩安装的允许偏差和检验方法应符合表13的规定。表13 窗帘盒、窗台板和散热器罩安装的允许偏差和检
31、验方法项次项 目允许偏差(mm)检验方法1水平度2用1m水平尺和塞尺检查2上口、下口直线度3拉5m线,不足5m拉通线,用钢直尺检查3两端距洞口长度差2用钢尺检查4两端出墙厚度差3用钢尺检查7.04门窗套工程质量验收。7.04.1门窗套的造型、尺寸和固定方法应符合设计要求,安装应牢固(检查方法:观察;尺量检查;手板检查)。7.04.2门窗套表面应平整、洁净、线条顺直、接缝严密,色泽一致,不得有裂缝、翘曲及损坏。7.04.3门窗套安装的允许偏差和检验方法应符合表14的规定。 表14 门窗套安装的允许偏差和检验方法项次项 目允许偏差(mm)检验方法1正、侧面垂直度3 用1m垂直检测尺检查2门窗套上口
32、水平度3用1m水平检测尺和塞尺检查 3门窗套上口直线度2拉5m线,不足5m拉通线,用钢直尺检查7.05.花饰工程质量验收。7.05.1花饰制作与安装所使用材料的材质、规格及花饰的造型、尺寸、安装位置和固定方法应符合设计要求(检查方法:观察;尺量检查;手板检查)。7.05.2花饰表面应洁净,按缝应严密吻合,不得有歪斜、裂缝、翘曲及损坏(检查方法:观察)。7.05.3花饰安装的允许偏差和检验方法应符合表15的规定。表15 花饰安装的允许偏差和检验方法项次项 目允许偏差(mm)检验方法室内室外1条型花饰的水平度和垂直度每米12拉线和用1m垂直检测尺检查全长362单独花饰中心位置偏移1015拉线和用钢
33、直尺检查 8、室内环境污染控制8.01住宅装饰装修室内环境污染控制应符合民用建筑工程室内环境污染控制规范(GB50325-2001)和住宅装饰装修工程施工规范(GB50327-2001)等国家标准规定。设计、施工应选用低毒性、低污染的装饰装修材料。8.02对室内环境污染控制有要求的,业主可委托认可的环境质量检测机构进行环境质量检测,可按有关规定对氡(222Rn)、甲醛、氨、苯和总挥发性有机物(TVOC)全部或部分进行检测,其污染物浓度应符合表16的要求。表16 住宅装饰装修后室内环境污染物浓度限值室内环境污染物浓度限值氡(Bq/m3)200甲醛(mg/m3)0.08苯(mg/m3)0.09氨(
34、mg/m3)0.20总挥发性有机物TVOC (Bq/m3)0.509、电气9.01基本要求9.01.1每户应设置分户配电箱,配电箱内应设漏电断路器,漏电动作电流应不大于30mA,动作时间不大于0.18秒,有过负荷、过电压保护功能,并分数路出线,分别控制照明、空调、插座等,其回路应确保负荷正常使用。9.01.2导线的敷设应按装饰设计规定进行施工,线路的短路保护、过负荷保护、导线截面的选择,低压电气的安装应按国家现行标准有关规定进行。9.01.3室内布线除通过空心楼板外均应穿管敷设,并采用绝缘良好的单股铜芯导线。穿管敷设时,管内导线的总截面积不应超过管内径截面积的40%,管内不得有接头和扭结。导线
35、、闭路电视线、通信线等不得安装在同一管道中。9.01.4照明及电热负荷线径截面的选择应使导线的安全载流量大于该分路内所有电路的额定电流之和,各分路线的容量不允许超过进户线的容量。9.01.5接地保护应可靠,导线间和导线对地间的绝缘电阻值应大于0 .5佟9.01.6进户的PVC塑料导线管的管壁厚度应不小于1.2mm。9.01.7电暖气安装不得使用普通插座,不得直接安装在可燃构件上。卫生间插座宜选用防溅式。9.01.8插座离地面应不低于300mm。线盒内导线应留有余量,长度宜为150mm.接线时相线进开关,零线直接进灯头,螺口灯头相线不应接外壳,照明开关距地高度宜为1.3m,开关不宜装在门后。9.
36、01.9吊顶内的电气配管,应按照明配管的要求,不得将配管固定在平顶的吊架或龙骨上。灯头盒、接线盒的设置应便于检修,并加盖板,使用软管接到灯位的,其长度不应超过1m。软管两端应用专用接头与接线盒,灯具连接牢固。金属软管本身应做接地保护。各种强、弱电的导线均不得在吊平顶内出现裸露。9.02验收要求和方法9.02.1工程竣工后应向业主提供线路走向位置尺寸图,并按上述要求逐一进行验收,需隐蔽的电气线路应在业主验收合格后方可进行隐蔽作业。9.02.2.面向电源插座的相线和零线位置为右相左零,有接地孔的插座,其地线插孔应为上方位置,接地应可靠。开关插座应安装牢固。采用目测和手动的方法检查,并采用电路测试的
37、专用工具检测插座上的相线、零线和地线的位置是否符合要求。9.02.3导线与燃气管路的间隔距离符合表17的规定,并用钢卷尺进行检查。表17 导线与燃气管道间隔距离位 置导线与燃气管道之间距离电气开关接头与燃气管间距离同一平面100不同平面50 1509.02.4施工完毕,应进行电气通电和灯具试亮试验,验证开关插座性能是否良好。10、卫浴设备10.01基本要求和验收卫生洁具外表应洁净无损坏。卫生洁具安装必须牢固,不得松动,排水畅通无堵,各连接处密封无渗漏,阀门开关灵活。采用目测和手感方法验收。安装完毕后进行不少于2h盛水试验无渗漏,盛水量分别如下:便器高低水箱应盛至扳手孔以下10mm处;各种洗涤盆
38、、面盆应盛至溢水口;浴缸应盛至不少于缸深的三分之一;水盘应盛至不少于盘深的三分之二。10.02卫生洁具安装的一般规定10.02.1卫生洁具的给水连接管,不得有凹凸弯曲等缺陷。10.02.2卫生洁具固定应牢固。不得在多孔砖或轻型隔墙中使用膨胀螺栓固定卫生洁具。10.02.3卫生洁具与进水管、排污口连接必须严密,不得有渗漏现象。坐便器应使用膨胀螺栓固定安装,并且油石灰或硅酮胶连接密封,底座不得用水泥砂浆固定。浴缸排水必须采用硬管连接。11、燃气用具及管道安装11.01燃气用具的安装11.01.1燃气用具的型号、规格、质量应符合相应的国家标准要求。11.01.2燃气用具应放置在通风状况良好的位置,灶
39、具直接放在灶台上,燃气热水器的安装高度应使点火开关中心线距地面1.5m。燃气热水器严禁安装在浴室内。燃气热水器的废气应采用排气管排出户外。11.01.3燃气用具安装平稳、牢固、软管与接头连接应采用管卡可靠固定,严密不泄露。11.02管道及附件安装11.02.1未经燃气管理部门许可,不得擅自更改原有燃气管道。11.02.2室内燃气管道不许埋设。11.02.3管道及附件的型号、规格、质量应符合设计要求。11.02.4管道及附件安装位置正确、横平竖直、固定牢固、坡向正确。支(托、吊)架安装牢固,防腐良好。11.02.5管道之间、管道与附件之间、附件之间连接牢固,严密,无泄漏。11.02.6系统畅通,
40、无堵塞,无泄漏;气表运转正常。12、质量验收及判定12.01验收程序管道、电气及其他隐蔽项目应在转入下道工序前由双方签字验收。装饰竣工后,施工方应先自行检查,若符合要求,可交付业主验收,并填写验收记录表。业主可委托专业机构(或专业人员)进行分项工程质量和竣工验收,并有委托书,其中送装饰施工队伍一份。竣工验收必须有业主签字。12.02质量判定12.02.1在判定中涉及安全及重要使用性能的给排水管道、电气、卫浴设备三项分项目必须全部合格。其余分项目90%以上合格,则判该装饰项目质量合格。12.02.2若在验收中发现有不符合验收要求的项目,施工方应进行整改,整改后对不合格项次进行复验,直至达到要求。
41、13、装饰装修质量保证保修期应符合中华人民共和国建设部令第110号第32条的规定。manipulator control mode and programmable controllers introduction 2.1 Select discussion with manipulator control 2.1.1 classification of control relays and discrete electronic circuit can control old industrial equipment, but also more common. Mainly these t
42、wo relatively cheap and you can meet the old-fashioned, simple (or simple) industrial equipment. So he can see them now, however these two control modes (relay and discrete electronic circuits) are these fatal flaws: (1) cannot adapt to the complex logic control, (2) only for the current project, th
43、e lack of compatibility and (3) not reforming the system with equipment improvements. Spring for the development of Chinas modern industrial automation technology the substantial increase in the level of industrial automation, completed the perfect relay of the computer too much. In terms of control
44、ling the computer showed his two great advantages: (1) each of the hardware can be installed on one or more microprocessors; (2) the official designer of the software writing content control is all about. Now in several ways in the context of industrial automation can often be seen in three ways: (1) Programmable Logical Controller (referred to as IPC); (2) Distributed Control System (DCS for short), and (3) the Programmable Logical Controller (PLC for
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 销售部门季度奖惩制度
- 直播客服奖惩制度
- 事业单位考核奖惩制度
- 光伏电站运维奖惩制度
- 情报信息报送奖惩制度
- 如何具体制定奖惩制度
- 乡村卫生室奖惩制度范本
- 酒店客房查房奖惩制度
- 负责人安全生产奖惩制度
- 煤矿雨季三防奖惩制度
- 2025-2026学年冀美版(新教材)初中美术八年级下册(全册)教学设计(附目录P125)
- 吸痰护理操作中的并发症预防
- 动物营养学各单元
- 2026福建龙岩漳平市招聘高校师范类毕业生101人考试备考试题及答案解析
- 碳排放控制技术-第6篇
- 2025年山东城市服务职业学院单招职业适应性测试题库附答案解析
- 2026年云南公务员考试备考题库(8925人)附答案详解(a卷)
- 学校饮用水的自查报告5篇
- RCEP培训商务部课件
- 路灯改造工程实施方案
- 铁路安全红线培训课件
评论
0/150
提交评论