版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、一级建造师-二级建造师-历年真题-建筑施工管理实务In 2009 Jie ladder training school building construction division two professional test counseling has been completed, with the exchange of students, our school students consistently fully affirmed our teachers, students in Teacher under the guidance of the learning effect i
2、s very good. Can test the construction of two divisions in 2009 but until October 31st and November 1st, she can have over half of the time. To this end, some students may think that learning too early, but I do not think so, and now the course has been completed, there is such a long review time is
3、 not enough to review it? To this end, I hope that the two construction division students can develop a reasonable review plan, cherish the review time of the six months, and strive for all through. Take this, I wish you a happy study! The following is the two construction division construction engi
4、neering management and practice simulation papers, please refer to! By the way, our first grade constructors pre service tutorial will begin in 2009, and still be a heavyweight professor at Tongji University.The examination time of this course is three hours, and the test paper has 120 marks, includ
5、ing 40 individual questions, 1 points for each question, 10 multiple-choice questions, 2 points for each question, 3 case questions, 20 points for each question.From the previous exam situation forecast this year of each chapter in the papers share scores are as follows: the first chapter 40 to 45 p
6、oints, more than in the multiple-choice questions; the second chapter is about 60 minutes, many questions in the case questions; the third chapter 10 to 15 points, more than in the multiple-choice questions.First, individual choice questions (40 questions, 1 points each). Each item options, only one
7、 of the most to do)The scene (a) a stadium project, the total construction area of 11600 square meters, 5600 square meters of the main game, as the structure form of the frame shear wall, the function room of 6000 square meters, 1 floors underground, the ground 5 floor frame structure.The following
8、problems exist on the spot:(1) temporary power consumption organization design on the construction site shall be prepared by the safety officer and set up a 315kVA transformer at the construction site;(2) the third stage distribution box for controlling the electrical equipment is provided with an e
9、lectric leakage protector;(3) wet basement lighting is powered by an autotransformer.Answer the following questions according to the scene (1):1. the organization and design of temporary electrical equipment must be compiled (C).A. security officerB. Project ManagerC. Electrical Engineering Technici
10、anD. Supervision Engineer2. according to the specifications, lighting transformers must be used (A), and the use of autotransformer is strictly prohibited.A. double winding type safety isolating transformerB. single winding type safety isolating transformerC. three winding type safety isolating tran
11、sformerD. four winding type safety isolating transformer3. wet basement lighting, the power supply voltage shall not be greater than (B) V.A. 12, B. 24, C. 36, D. 484. temporary power on site shall be adopted (B) instead of leakage protector only in the last stage switch box.A. two stage distributio
12、n system, three level leakage protection systemB. three stage distribution system, two level leakage protection systemC. four stage distribution system, three level leakage protection systemD. three stage distribution system, four level leakage protection system5. height over 24 meters of constructi
13、on, should install temporary fire standpipe, diameter shall be not less than mm (D).A.25 B.35 C.55 D.756., the general section of the block height shall not be less than (C) m, the main sections of the urban block height shall not be less than 2.5m.A. 1.2, B. 1.5, C. 1.8, D. 2.17. the main intersect
14、ion of the construction site should be marked with five cards and one map, which does not include (D).A. engineering overview brand B. safety production plateC. fire protection brand D. building construction plansScene (two) basement 1 floors, underground construction area of 4000 square meters, the
15、 area of 14000 square meters, the underground water level is higher than the base design. The measurement after the end of the project, the foundation pit with soil nailing wall, in May completed earthwork operations, and to develop a construction plan period. The basement floor is a mass concrete p
16、roject, with a rear pouring slab, and the basement is waterproof.Answer the following questions according to the scene (two):1. below (C) does not belong to the deep foundation pit support mode.A. soil nailing wall support; B.; cement retaining wall; supportC. discontinuous horizontal support D. dia
17、phragm wall2. shallow foundation pit excavation, the first work should be carried out (B).A. slotted support, B. measurement, positioning, C., precipitation, D., layered excavation3. after casting belt usually according to the design requirements to leave, at least retain (D) days later pouring, the
18、 structure as a whole.A. 7, B. 14, C. 21, D. 284. the waterproof grade of underground works is divided into (C).A. six, B. five, C. four, D. three5. during the construction of underground waterproof works, the foundation pit of open excavation method and the excavation shaft and hole of underground
19、excavation must maintain the ground water level below the base (A), and adopt precipitation measures when necessary.A.0.5m B.0.8m C.1.2m D.1.5m6. the ground concrete used in this project, such as slag cement, shall not be less than (C) days old for mixing concrete.A. 7, B. 14, C. 21, D. 287. the fol
20、lowing (C) is not part of the construction survey.Establishment of A. construction control networkB. positioning of buildingsRendering of C. site planD. deformation observation of buildings8. with vibratory compactor filling construction, the layered thickness is (B), the number of times of compacti
21、on per layer is 34 times.A.250300B.250350C.200250D.150200Scene (three) a building is a modern intelligent building, the frame shear wall structure, the ground floor 3,28 on the ground floor, building area of 58 thousand square meters, total construction contractor is the third construction company,
22、because of its advanced equipment, high requirements, therefore, the company will be the mechanical and electrical equipment installation engineering subcontract to a large installation company with the relevant qualification. Check the quality of the column during construction. 10 pillars were foun
23、d to have varying degrees of quality problems.Event 1: two of the columns are detected and identified by qualified testing units, which can meet the design requirements;Event two: another two pillars are detected and identified by qualified testing units, which fail to meet the design requirements,
24、and require the original design unit to calculate and satisfy the structural safety and use functions;Event three: the detection unit three posts by a qualified inspection, can not meet the design requirements, please check the original design unit, still can not meet the structure safety and using
25、function, through consultation and reinforce, which put part of steel, concrete pillars in the outside, after reinforcement can meet the safety requirements;Event four: there are three pillars, the strength of concrete and design requirements are far from each other, and strengthening and strengthen
26、ing can not meet the safety requirements.In engineering archives, the following events occur again:Event five: the installation company will be part of the mechanical and electrical equipment subcontract part of the completion of the information directly to the supervision unit.Event six: the employ
27、er requires the design, supervision and construction contractor to hand over the project files directly to the city archives.Answer the following questions according to the scene (three):1. it is (D) that the post of this case cannot be examined and accepted.A. event, B. event, two C. event, three D. event four2. the completion data in this case shall be collected (A) and shall be handed over to the construction unit in a timely mannerA. turnkey units B. subcontracting units (installation compa
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 有机无机岗位面试题目与参考答案
- 薪酬体系考试题目及答案展示
- 内科护理年终工作总结
- 2025届云南省保山市龙陵县数学三年级第二学期期末预测试题含答案
- 2025届丽江地区玉龙纳西族自治县四年级数学第二学期期末学业质量监测模拟试题(含答案)
- 导游考证试题及答案
- 遴选公文试题及答案
- 珍稀动植物考试试题及参考答案
- 2025-2026学年黑龙江省鸡西市虎林市六校联考四下数学期中调研试题含解析
- 2025-2026学年黑龙江省伊春市伊春区数学三年级下学期期末教学质量检测试题含答案解析
- 快递驿站可行性研究报告
- 房屋加固施工协议书
- 2025年宁夏黄河出版传媒集团有限公司招聘笔试参考题库含答案解析
- 国家职业技能标准-动物疫病防治员2020年版-20211027001
- 信息技术必修一《数据与计算》第一章第一节《数据、信息与知识》教案
- 一《归园田居(其一)》公开课一等奖创新教案设计中职语文高教版(2023-2024)基础模块下册
- 雅马哈RX-V365使用说明书
- T-CRHA 046-2024 标准手术体位安置技术规范
- 草莓收购协议与草莓苗购销合同
- 《电力工程接地用导电防腐涂料技术条件》
- (高清版)DZT 0295-2016 土地质量生态地球化学评价规范
评论
0/150
提交评论