1、 Bozshakol Copper ProjectClay plantAB偏跨E-House电缆桥架安装脚手架搭设方案Method statement of AB side building E-House cable tray installation program scaffolding erection窗体底端11373-BD-NFC-3300-MS-OOO-E-0003 0IFRREV#DATEREASONORIGINATORLi XinhuaCHECKEDXia QingAPPROVEDLiu Jianhui目 录Content1、 搭设方案 1. Installation Met
2、hod2、 风险评估2. Risk Assessment3、 安全管理方案3. Safety Management Method一、搭设方案Installation method 1. 概况 根据设计图纸AB偏跨内E-House下设置了2000多米电缆桥架及敷设大量的电缆,工作面相当大,工作时间持续长,而电缆桥架安装在10米的高空上,为了保障工作人员操作的安全性及不影响地面设备安装的空间,采取了以下方案搭设脚手架。1. Brief As per the design drawing, more than 2000 m cable trays and huge quantity cables s
3、hall be installed for E-house of AB side building. Beside part of the trays shall be install in 10m high place; for ensure safety of installation personnel and reduce the influence of installation of equipment on ground, the method of scaffold installation shall be adopt as mentioned below: 2. 编制依据
4、Codes and references2.1 设计图纸:Design drawings2.2 现场勘测资料 on site survey document3. 施工准备 preparation works3.1 技术准备 technical preparation3.1.1 根据设计图纸及现场资料,进行图纸及资料自审和会审工作。 Self check and cross check of drawing3.1.2 图纸及资料自审、会审后,组织施工班组熟悉施工过程及有关技术要求,结合现场实际情况集中进行一次全面技术交底。 After self check and cross check, or
5、ganize the construction team to get familiar with the construction process and the relevant technical requirements, and to give a technical disclosure combined with the actual situation. 3.2 施工部署 Personnel and responsibilities3.2.1 主要施工设备、机具准备 Equipment and tools preparation 设备进场投入使用前进行全面检修,使设备处于完好状
6、态。 Carry out a overall inspection and maintenance to make sure all the equipment in working condition before putting in use.4. 脚手架的搭设 Scaffolding installation4.1 脚手架材料检查 Inspection of materials of scaffolding 对到场的脚手架及配件进行检查,外观检查应无损坏及变形。 Insure no deformation and damage for all materials4.2 搭设流程 Inst
7、allation Process 4.2.1 场地安全措施的安装 Installation of safety facilities 设置安全警示标志,设立安全网。 Set safety sign and safety net4.2.2 搭设作业 Installation work 根据现场位置,利用多台(至少两台)升降机上升至搭设高度将有卡板的脚手架卡在E-House下的PG600工字钢上,以此为支点进行搭设,骨架搭设完成后继续搭设脚手板,完成搭设。 As per the site situation, use at least two elevators to mount scaffold
8、 with plate to PG600 I steel under E-HOUSE, then use it as the point to install the frame. After finish the frame installation, amount the plate. 4.2.3 完成搭设,场地清理 House keeping 搭设完成后,多余的材料及废料及时清理出场,安全警告标示不撤除。 Clean the area after installation, but remain the safety warming sign. 附图4.2.2(1)附图4.2.2(2)附
9、图4.2.2(3)11373-BD-NFC-3300-MS-OOO-E-0003 Page 14 of 14二、风险评估( 脚手架搭设、拆除作业 )工 作 危 害 分析 rick assessment for Removal and Erection of Scaffold工作内容(风险项目)Job content(risk item)危害分析Hazard 风险Risk 矫正措施 Correction measures脚手架搭设、拆除作业Removal and erection of scaffold安全通道 safety access滑倒、跌倒、绊倒slip down, trip down
10、and fall down1、进出通道上禁止摆放材料,保持通道不受阻。The access shall not have obstacles and keep the good housekeeping2、保证作业临边有必要的防护措施,如安全栏杆 working area shall have protective fence3、保证有符合要求的梯子或作业平台 ladder and operating platform shall qualified脚手架搭设拆除作业erection remove人员高空坠落、材料高空坠物People and materials dropping from h
11、igher place1、脚手架搭设、拆除作业站脚处搭设操作平台(预防人员坠落)Platform should be erected when remove scaffold to avoid people dropping.2、搭设、拆除作业遵守拆除作业工序(预防高空坠物)erected and removed work should according to the descending orders (To avoid dropping from high place)3、遵循脚手架搭设、拆除作业工序要求,严禁违反操作作业 erected and removed for scaffold
12、 shall refer to the specification, illegal work is never qualified4、每步搭设、拆除时要及时对材料进行清理,扣件尽量采取麻袋装取运输 The materials should be cleaning after the remove work finished; Fastener should be packaged by sacking, pay more attention to the housekeeping is important.5、禁止同一个垂直面上搭设、拆除作业 erected and removed work
13、 at the same vertical is forbidden6、脚手架操作期间,下面有人作业须有足够的防护 underside worker shall have more enough personal PPE during the scaffold works.7、操作人员不得抛掷工器具与材料 Throwing the tools and materials is not allowedHousekeeping摔倒、跌倒、撞伤、刮伤slip down, trip down, fall down and bruise1、拆除作业时,边拆除边清理 Removed work should
14、 be with removing and cleaning2、搭设、拆除作业时,注意扣件、钢管等材料的堆码 Pay more attention to the piled fastener and conduit during the erected and removed work 3、扣件采用箱装较好,钢管采用堆放在支撑架上较好(规格:1.5米*1.5米或1.5米*2.0米)fastener should saved in the box, steel conduit shall piled in the frame (specification: 1.5m or 1.5m*2.0m)物
15、体打击与坠落 materials dropping and beating人员受伤或死亡 personnel died or injury1、作业人员佩戴好自己的PPE,特别是安全帽(预防头部撞伤),须系安全帽带 Operator shall wear personal PPE, especially the helmet with safety belt.2、遵循搭设、拆除作业循序,严禁自下往上抛投材料,严禁同一垂直面同时搭设拆除 erected and removed work shall refer to the descending orders, throwing materials
16、 or tools from bottom to the up is forbidden, work at the same vertical is not allowed火源 fire source火灾 fire accident1、禁止在现场吸烟 non-smoking in the working site2、做好Housekeeping清理工作 make the good housekeeping work in the site3、配置灭火器 fire stopper should be assembled人的不安全行为personal unsafe situation 不安全状态导
17、致人员违章作业 unsafe situation lead to illegal work1、搭设拆除作业前,要预先做好脚手架搭设拆除作业许可证的申请 work permit shall prepared before remove the scaffold. 2、由有资质的脚手架工进行搭设和拆除 erected and removed work shall work by the qualified people3、脚手架搭设拆除作业人员在进行作业前要预先检查自己的安全防护用品完好,特别是安全带 Operator shall wear personal PPE, especially the
18、 safety belt.4、安全带采取高挂低用的方式,同时必须要有一个牢靠的锚固点,可以是钢管,也可以是生命绳 safety belt shall have an anchor fixed point by both of steel conduit and safety rope. 5、脚手架作业时严禁打闹戏骂 joking and making fun of someone during the scaffold work is not allowed6、划定维护区域,并进行维护与隔离 maintenance area should be arranged with insulated
19、functions7、有心脏病、高血压的人员不得进行脚手架作业 heart disease and high blood pressure couldnt implement to the scaffold work.8、组织相关的技能培训和教育,严禁违章指挥 Relevant training skill and education should be have, illegal direct is not allowed9、临边操作人员必须系挂全束身安全带 aside staff must wear safety belt 不安全工作方式导致人员违章unsafe situation lea
20、d to illegal work13、脚手架作业人员必须佩戴工具袋,大工具袋系保险绳,严禁抛掷物件 scaffold worker should be wear tool bag, large tool bag should tied by safety rope, throwing tools is forbidden14、脚手架作业时严禁随意攀爬 climbing in the scaffold random is not allowed 15、脚手架作业时,作业人员严禁坐在平台孔洞边缘、骑坐在栏杆上、躺在走道上休息 lie on the ground, side on the rail
21、ing, sit down beside the hole in the platform is not allowed during scaffold work.16、使用合格的登高工具-斜道、楼梯等 ladder for the slope and stairs should be qualified安全防护 safety protection没有按照规范导致人员违章 not according to the code lead to illegal work1、在夜间、光线不足的地方加强照明 Add more lighting strengthen to the low power ar
22、ea2、防护栏杆高度必须符合要求 fence should according to the specification3、平台、走道、斜道装设挡脚板 platform, walking access and slope road should have protective foot plate4、作业周围孔洞、沟道装设盖板或围栏 hole and trench should have protective cover or fence5、成品仓(粉矿仓)在高空作业时周围布设安全网 high place working around in the ore bin shall have pro
23、tective net in final products or ore bin.6、六级及以上大风或恶劣气候停止露天高空作业 above lever 6 wind shall not working in the high place7、凌冻天气进行脚手架作业要注意采取防滑措施 attention to the slip down in frozen day when do the scaffold work8、上下交叉作业中间搭设隔离层 cross work between up and down shall have insulated coat 没有按照规范导致高空落物not acco
24、rding to the code lead to the staff dropping9、平台、走道、脚手架上堆放物件不超过允许载荷 piled materials over-loading in the platform, walking access and scaffold is not allowed10、切割的工件、边角余料等应放置在牢靠的地方或用铁丝扣牢并有防止坠落的措施或废料及时清理放到地面 cutting components and excessive material should be fixed by iron wire or another, ground shou
25、ld cleaning it.11、点焊的物件不得移动 spot welding components shall not remove12、交叉施工的隔离层严禁随意拆除 Insulated coat for cross work shall not random remove 疲劳作业Tired work人员伤害Personnel injury1、合理调配人力,注意休息prepare workers reasonable with enough resting time2、检查、观察、发现作业人员疲劳,立即停止作业Pay more attention to the workers situa
26、tion and exhausted person should asking stopped to have a rest.脚手架材质 scaffold material quality钢管、扣件、木方、跳板Conduit, fastener, wood and springboard 不符合要求导致人身伤害 illegal code lead to Personnel injury1、搭设脚手架材料应符合规范要求,凡弯曲、压扁、有裂纹或已经严重锈蚀的钢管严禁使用 the pipe which bending-rupture, cracked and rusty shall not use
27、in the scaffold materials beside all of them should according to the specification2、立杆搭设循序:平整地面-铺设跳板-摆放底座-竖立杆 leveling ground-springboard laying- foundation laying-erect standing bar脚手板铺设 scaffold board paving1、材料不合要求 unqualified materials 人身伤害Personnel injury1、脚手板应满铺,不得有空隙和探头板 plate should be fully
28、 paving, inter space and excessive plate shall not have2、脚手板未满铺 non fully paving 2、板与板搭接长度不得小于20CM The plate distance shall not less than 20cm3、脚手板未绑扎或压条 non fixed or bundling3、脚手板上翻时,应由两人从里向外按顺序进行,工作时挂好安全带 wear safety belt when rolling the scaffold board with according to the descending orders.脚手架搭
29、设 scaffold erection违章作业 work against regulations人身伤害Personnel injury1、脚手架的外侧、斜道和平台应设1.0高的防护栏杆(从脚手板上量起)和20CM高的挡脚板,中间防护栏杆高度45CM-50CM(从脚手板上量起),搭设脚手架时,作业人员要挂好安全带 exterior scaffold, ramp and platform should have protective fence which 1.0m high and protective foot plate which 20cm high, middle protective fence which high is 45cm50cm, scaffold worker shall wear PPE.2、斜坡道、跳板的坡度不得大于1:3,宽度不得小于1.2M,并钉有防护条,防滑条的间距不得大于30CMThe slope degree of ramp and springboard hall not over 1:3, wide shall not less than 1.2m with studding protective tape, the distance of non-slip strip shall not more than
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 纳米染料木素对缺血性脑卒中神经保护作用的机制研究
- 抚顺十五中活动方案
- 接力雨伞活动方案
- 拯救树木活动方案
- 护士挑战活动方案
- 支行虎年开门红活动方案
- 操场捉泥鳅活动方案
- 探访脑瘫病人活动方案
- 林业资源合作开发合同书
- 锦屏山东麓第四纪冰川遗迹与雅砻江阶地序列研究
- 《湖南省房屋建筑和市政工程消防质量控制技术标准》
- 2024年北京市东城区中考生物试题
- 小组工作教案
- GB/T 21671-2018基于以太网技术的局域网(LAN)系统验收测试方法
- GB/T 11177-1989无机胶粘剂套接压缩剪切强度试验方法
- 钴领域:华友钴业企业组织结构及部门职责
- 内容参考zipc教程
- 基金投资管理系统O32用户手册-股指期货套保系统
- 机械原理课程设计-自动打印机设计说明书
- 建设工程消防设计审查申报表
- 江西省中考语文备考及答题技巧——语文考点及答题策略-人教版初中九年级全册语文素材
评论
0/150
提交评论