1、VMware Site Recovery Manager: 技术解决方案技术解决方案 杜建华 Vmware中国 Agenda Introduction and Key Concepts Site Recovery Manager 1.0 Prerequisites and SAN Integration Site Recovery Manager Workflows Site Recovery Manager Roles and Privileges Alarms and Site Status Monitoring Summary What is a Disaster? Complete l

2、oss of a data center for an extended period of time Declaration of a disaster usually requires consensus from multiple parts of the organization (at the C*O level) What is not a disaster? Failure of an individual host A temporary service interruption The Current State of Traditional Disaster Recover

3、y DR services tiered according to business needs Physical DR is challenging Maintain identical hardware at both locations Apply upgrades and patches in parallel Little automation Error-prone and difficult to test TierRPORTOCost IImmediateImmediate$ II24+ hrs.48+ hrs.$ III7+ days5+ days$ Advantages o

4、f Virtual Disaster Recovery Virtual machines are portable Virtual hardware can be automatically configured Test and failover can be automated (minimizes human error) The need for idle hardware is reduced Costs are lowered, and the quality of service is raised Simplifies and automates disaster recove

5、ry workflows: Setup, testing, failover Turns manual recovery runbooks into automated recovery plans Provides central management of recovery plans from VirtualCenter Introducing VMware Site Recovery Manager Works with VMware Infrastructure to make disaster recovery rapid, reliable, manageable, afford

6、able Site Recovery Manager leverages VMware Infrastructure to deliver advanced disaster recovery management and automation Protected Site Recovery Site VirtualCenter Site Recovery Manager VirtualCenter Site Recovery Manager Datastore Groups Array Replication Datastore Groups X Site Recovery Manager

7、at a Glance Server Side Components * Site 1 VC Server 1 SRM Server 1 Storage Replication Adapter SRM 1 DB VCMS 1 DB Block Replication SW Site 2 VC Server 2 SRM Server 2 Storage Replication Adapter SRM 2 DB VCMS 2 DB Block Replication SW Array 1Array 2 * Note: Conceptual drawing only. SRM Server may

8、run on another system than VCMS Site Recovery Manager Concept Relationship “Cheat Sheet” SiteConceptRelationship ProtectedLUNIndivisible unit of storage that can be replicated ProtectedDatastoreContains one or more LUNs (i.e. VMFS) ProtectedDatastore Groups Auto-generated collection of one or more d

9、atastores. Indivisible unit or storage failover. ProtectedProtection Group Collection of all VMs stored in a datastore group RecoveryRecovery PlanContains one or more protection groups Key Concepts And Their Relationships Protection Group 3 Protection Group 2 Protection Group 1 Datastore Group 3 Dat

10、astore Group 2 Datastore Group 1 LUN 1 LUN 2 LUN 3 LUN 4 LUN 5 VMFS 1VMFS 2VMFS 4VMFS 3 Recovery Plan 1 (Whole Site) Protection Groups: Recovery Plan 2 (Subset) Protection Groups: Protected SiteRecovery Site Protection Group 1 Protection Group 2 Protection Group 3 Protection Group 1 Array Integratio

11、n with SRM Vendor-specific scripts support: Array discovery Replicated LUN discovery SRM Test initiation (simulated failover in an isolated environment) SRM Failover initiation (actual failover of services to the recovery site) Array vendors will be responsible for creating the scripts for their arr

12、ays to enable the integration with Site Recovery Manager Safety Tip: DNS Validation The Rule of Four Validate DNS is working as expected and by performing the following DNS lookups for the VC,SRM and ESX servers Short name Long name Reverse Forward Site Recovery Manager 1.0 Prerequisites ESX Server

13、3.0.2, ESX Server 3.5 or ESX Server 3i VirtualCenter (VC) server version 2.5 installed at the protected site and at the recovery site SRM server installed at the protected and at the recovery site SRM plug-in installed on the VI Clients that will access the protected and recovery site Network config

14、uration that allows TCP connectivity between VC servers and SRM servers An Oracle or SQL Server database that uses ODBC for connectivity in the protected site and in the recovery site A SRM license installed on the VC license server at the protected site and at the recovery site Pre-configured array

15、-based replication between the protected site and the recovery site Installation Workflow At the protected site the following activities are completed: Installation of the SRM server Installation of the SRM Plugin into the VI Client Installation of the Storage Replication Adapter (SRA) At the recove

16、ry site the following activities are completed: Installation of the SRM server Installation of the SRM Plugin into the VI Client * Installation of the Storage Replication Adapter (SRA) It is important to complete the Site Recovery Manager workflows in the order detailed in this presentation * Note:

17、Optional step, only required if a different instance of the VI Client is used to access the recovery site Protected and Recovery Site Datacenters PROTECTED SITE RECOVERY SITE Site Recovery Manager User Interface Setup Workflow Protection Site At the protection site the following setup activities are

18、 completed: The user pairs the SRM servers at the protected and recovery sites Security certificates are established between the SRM servers and the VC servers Certificates that are not properly signed will result in the Yellow Warnings Signs. Reciprocity will still be established allowing you to co

19、ntinue to the next step in the workflow. Setup Workflow Protection Site Array Managers Configuration Select the correct Manager Type from the Manager type drop down box SRM identifies available arrays and replicated datastores and determines the datastore groups. Setup Workflow Protection Site Setup

20、 Workflow Protection Site Using the Inventory Preferences Mapper, the user maps resources in the protected site to their counterparts in the recovery site. Setup Workflow Protection Site A protection group is a group of VMs that will be failed over together to the recovery site Working through the P

21、rotection Group wizard you will need to select a location for temporary VirtualCenter Inventory files for the protected VMs at the recovery site. Setup Workflow Protection Site Working through the Protection Group wizard a user selects which VMs need to be protected and assigns them to a protection

22、group The creation of a protection group results in VC inventory updates in the recovery site Setup Workflow Recovery Site At the recovery site the following setup activity is completed: The user creates a recovery plan which is associated to a single or multiple protection groups Site Recovery Mana

23、ger Recovery Plan VM Shutdown High Priority VM Recovery Attach Virtual Disks High Priority VM Shutdown Normal Priority VM Recovery Site Recovery Manager Recovery Plan Site Recovery Manager Recovery Plans: Turn manual BC/DR run books into an automated process Specify the steps of the recovery process

24、 in VirtualCenter Provide a way to test your BC/DR plan in an isolated environment at the recovery site without impacting the protected VMs in the protected site Low Priority VM Recovery Post Test Cleanup Virtual Disk Reset Testing a Recovery Plan Test a recovery plan by simulating a failover of pro

25、tected VMs with zero downtime to the protected VMs in the protected site Testing a Recovery Plan Executing Failover WARNING - Executing an actual failover will permanently alter virtual machines and infrastructure of both the protected and recovery sites Executing Failover WARNING - Executing an act

26、ual failover will permanently alter virtual machines and infrastructure of both the protected and recovery sites Failback Options in Site Recovery Manager 1.0 Site Recovery Manager 1.0 does not provide a push-button automated failback process. Failback Options: Without SRM (no startup order, no fail

27、back history reports) Work with your storage team, reverse data replication VM re-inventory*, restart and re-ip (manual or scripted) With SRM (start up order in recovery plan with failback history) Work with your storage team, reverse data replication Leverage SRM, complete all SRM workflows in the

28、reverse direction from Recovery Site back to the Protected Site Repeat the above two steps from the Protected Site back to the recovery Site. * Note: VM re-inventory in VC may not be necessary in the Protected site. Default Roles and Privileges Alarms and Site Status Monitoring Site Recovery Manager

29、 will support the following alarm notification actions: Send e-mail to specified address Send SNMP trap to VC trap receivers Execute specified command on VC host We recommend you complete setup of alarm notifications for: Remote Site Down Remote Site Ping Failed Replication Group Removed Recovery Pl

30、an Destroyed License Server Unreachable Site Recovery Manager Server Monitoring Site Recovery Manager will raise VirtualCenter events for the following conditions: Disk Space Low CPU use exceeded limit Memory low Remote Site not responding Remote Site heartbeat failed Recovery Plan Test started, ended, succeeded, failed, or cancelled Virtual Machine Recovery started, ended, succeeded, fa

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论