版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、TLQ series Hoisting mechanismInstruction bookExecutive standard: GB/T5031-2008Jinan Taichang Transmission Machinery Cor., LtdTaichang Machinery, You always rely on the partner!Thanks for choose taichang tower crane, lift machineryFor better service for you, please read this note book in detailOnce c
2、hange content, sorry for we will not note you Catalogue一 summarize.3二 performance parameter.4三 safety explains.5四 working principle.6五 installation debugging.7六 maintaining.8七 lubrication oil.9八 failure cause and measures.10九 quick wear part.12十 organization shape installation Diagram.13One. summari
3、zeThis machine use for raising system of tower crane. Warning: no peopleOperating temperature: -20+40 working noise: =85DbOur company TLQ series raising organization with “L” shape, include multispeed 3 phase asynchronization motor, reducer, lifting altitude limitingstopper, coilingblock, rack, brak
4、e.1. The motor of hoisting mechanism is YZTD series multispeed 3 phase asynchronization motor, own big speedratio, small start electricity, starting torque, high reliability, easy use and maintenance. Spare electric control make the motor 3 group statorcoil, and electrify will get the rated rotate s
5、peed with high, middle, low speed2. Reducer include planetarygear, reducer body through reducer installation foundation contact with rack 3. Lifting altitude limitingstopper through holder installation in the gear pedestal , barrelarbor end face, round pin in the of the coilingblock, through it tran
6、smission introduction to stroke limiter4. Raising coilingblock is welded coilingblock ofcondup rope race5. Rack constitute soldering with proximate matter and steel plate 6. Brake of detail information, please check the brake specificationTwo项目Item单位Unit电机Motor型号ModelYZTPFZ50M-4额定转速Rated speedr/min1
7、471功率PowerKW55减速机Reduction box传动比transmission56卷筒Coiling block容绳量Rope capacitym560层数Number of plies6直径diametermm660绳槽类型Type of score双折线 (左旋)Condup (sinistrogyration)螺距Screw pitchmm21制动器brake型号ModelYWZ9-315/E80制动力矩Retarding torqueN.m630-1000钢丝绳steelwirerope牵引力tractionN40000规格standard35W*7-20-1960I电源频
8、率Power frequencyHZ7-5075100起升速度Raising speedM/mina=25-345168a=42.5-172534起重量Elevating capacityTa=2842a=41684总重量Total weightT2.7备注Remark变频调速Frequency conversion and speed governingThree. safe specification1. The worker who operation and maintain and the machine , must be authorised or trained2. If in
9、stallation and operation, please working as the specification book3. For make sure the performance of the machine, please use the spare parts from our compnay4. If malfunction of our machine, please contact us5. All spare parts of rotate, no touch, its include rope guide, Stop device, coiling block,
10、 steel wire rope6. In the course of assemble disassembly, if the spare parts broken, its must be choose the same type and same strength spare parts to exchange.Four. working principle The rotate of this series three-speed motor of hoisting mechanism, through reducer deceleration and drive the coilin
11、g block. The hoisting mechanism include 3 Lifting speed and 3 rate of descent. medium speed hoisting when raising , it will electrify of the motor stator low speed coil. After change to high speed coil, raising with high speed. When decline, its need working with same start sequence.When stop workin
12、g, electrical control part need change to low velocity with automatic, its need slow down before stop working, make sure braking balanceThe working file of raising system include medium speed gear and high speed gear. The low speed gear use for starting and , general can not working with long time.F
13、ive. installation debuggingBefore installation, its need check if looseof the connect bolt of motor, reducer, braking, stroke limiter, bearing pedestal etc. If loose, please tightened and installation in the tower craneBefore installation, please compare the installation drawing dimension, Fix it in
14、 the tower crane balance arm with pin roll with 4 - 40.5 (h9). When connect the Hoisting mechanism and balance armWhen installation the machine, please reference the installation drawing dimension, use pin roll with 4-40.5 (h9), take the mechanism fix in the balance arm. When connect the raising mec
15、hanism and balance arm, please make sure the otic placode working with natural, not allowed compel connect, avoid transformation of the mechanism chassis and result in badness working. After place the machine, every cotter of the pin roll need open with sufficient, avoid fetch way. Before installati
16、on, its need use the wedge in the one end of the raising steelwirerope fix in the plate block ektexine of the coiling block. After use about 1/10 single rope traction rating to cocking steelwirerope. The motor through reducer transmission coiling block, and make the steelwirerope twine in the coilin
17、g block layer-by-layer. The safe numberofturns not less than 3 of steelwirerope winding in the coiling block. The safety factorsteelwirerope not less than 5.5. If not use leg along device, for smoothly several layer twine in the coiling block of the steelwirerope, we suggest the steelwirerope depart
18、ure the angle of barrelarbor vertical plane. And its better less than 1.5warning: strictly prohibit add the lubrication oil not according the stipulateWarning: strictly prohibit put the hand into the rotary part of the machine. Six maintain Before working, please add GL-5 heavy loading hyperbola gea
19、r oil of the reducer ( 85W/95) to oil pointerIts need check the bolt if loose after working 50 hours, If loose, its need firm in time.After, change the oil every half year. Later, check the oil level every day and add oil as the rule.Before installation and every one month, its need check the adjust
20、 the braking as the braking specificationThere is a lubrication glib outside of end of coiling block bearing foundation , its already fill 2 before leave factory lubrication grease.Its need often check the the spare part of firm, if loose, its need firm it. Its need often check the mechanism if oil
21、leak. If oil leak, please maintain in time. And check the reducer lubrication oil level in key point, add lubrication oil in time, keep the right oil level.When check working, if appear noise and fever, its need stop working and check it. Constraint maintain content and period as the follow form:Mai
22、ntain timePeriod or working timeMaintain ContentFirst Time200 hours1. Add reducer lubrication oil to oil level2. Check or adjust braking (detail please check the braking specification)Interval time3 months or 2400 hours1. Evacuation the old oil in the reducer, wash the entocoele, and fill lubricatio
23、n oil2. Check the wear pattern situation friction plate of braking, as the situation change the friction plateWarning: strictly prohibit use mix the different kind lubrication oilWarning: the steelwirerope must check and scrap as the rule of GB5972Seven: Lubrication Oil1. Reducer lubrication oilGL-5
24、 heavy load hyperbola gear oil mainly use for keep the normally or middle oil temperature, and the gear lubrication in heavy load working.2. Bearing pedestal lubrication greaseBefore the product leave factory, It need fill 2 lubrication grease ( GB/T7323)The customer add oil need accord with bellow
25、situation:The lubrication grease consistence (NLGI) need 2The oil performance index need higher than the requirement GB/T7323 Eight. Malfunction reason and measureWarning: when maintain, please keep the machine be halt situation. And put on caution mark of maintain in the start button.stoppageReason
26、measurereducerBig noise in the in the fastener of reducerThe fastener looseMake the bolt to stipulate torqueThe voice of reducer changeIts broken of gearCheck all the gear, change the bad gearBear brokenChange bad bearingInside of reducer axialdirection no gapCheck and change the bad spare partsRedu
27、cer working temperature too highthe level of oil too high in the boxCheck the oil level and adjustThe level of oil too low, not good for heat dissipationCheck the oil level and adjustThe oil too oldCheck the add oil time, and adjustThe oil contaminateChange new oilThe reducer inside axialdirection n
28、o gapCheck and change spare partsOil leakageBox or cover of box Casting flawChange box or cover of box or repair itThe cover of box connect part seal not goodCheck the seal part or connect part, and add new sealantOil seal brokenChange new oil sealThe temperature too high of the bearingThe oil in th
29、e box of reducer too high or too lowCheck the oil level in natural temperature, and add oil as the situationThe oil too oldChange new oilThe bear brokenCheck and change bearThe amplitude of bearing too highThe bear brokenCheck and change the bearThe gear brokenCheck and change the bearCoiling blocks
30、teelwireropedisorder cable steelwirerope transformation or broken strand Check or change new steelwireropeThe steel wire rope score wear outCheck and change the coiling block The steel wire departure the angle bigger than 1.5 with the flat of vertical coiling block bearingChange the tower crane designThe steelwirerope looseThe wedge of fix the steelwirero
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026年四川省遂宁市高职单招职业技能考试题库含答案详细解析
- 2026广东中远海运重工有限公司社会招聘考试参考试题及答案解析
- 2026首都医科大学附属北京安贞医院南充医院招聘48人(五)考试参考试题及答案解析
- 2026年辽宁机电职业技术学院单招综合素质考试题库及答案详细解析
- 2026年齐齐哈尔市事业单位招聘398人考试参考试题及答案解析
- 2026河南西施兰(南阳)药业股份有限公司招聘22人考试参考题库及答案解析
- 2026年河北建材职业技术学院单招综合素质考试题库及答案详细解析
- 2026年毕节工业职业技术学院单招综合素质考试题库及答案详细解析
- 2026年重庆师范大学单招职业技能考试题库有答案详细解析
- 2026年唐山职业技术学院单招职业适应性测试题库附答案详细解析
- 2026甘肃天水市秦州区选聘大学生村文书50人笔试模拟试题及答案解析
- 北京市2024北京市教师发展中心招聘1人笔试历年参考题库典型考点附带答案详解
- 2026年江西制造职业技术学院单招职业适应性测试题库及答案详细解析
- 2026年安徽新闻出版职业技术学院单招综合素质考试题库及完整答案详解一套
- 2026年人工智能在机械设计中的应用案例
- 2026年常州工程职业技术学院单招职业技能考试题库含答案详解(黄金题型)
- GB/T 6495.1-2025光伏器件第1部分:光伏电流-电压特性的测量
- 统编版(2026)八年级下册历史教材课后问题答案(全册)
- 急性心肌梗塞的早期识别与处理
- 低空经济产业2026年政策红利与市场拓展研究
- 医院档案管理制度流程图
评论
0/150
提交评论