1、Project Status Weekly Report WK02 2013 (Jan.13 Jan.19) PLM Department July 13, 2021 Giedrius, Andrew, Jason, Rockit, Jerry Function Wireless BU CONFIDENTIAL MATERIAL Agenda 1.WiliBox Giedrius 2.BAFO Andrew 3.FTK SZ Jason/Rockit 4.Cross-Team Projects Jerry CONFIDENTIAL MATERIAL WiliBox Giedrius CONFI
2、DENTIAL MATERIAL Projects Overview BrandModelPhaseProject codeStatus update LigowaveLigoPTP UNITY seriesDVTWG20510FCC official report date 01/21. PQA testing in progress. DeliberantAPC 2S US seriesEVTWG20710R For Advantech CPE using; 3 extension models in Advantech Team memberHW: Andy, SW: FonSeeHW
3、versionV05 PRD Approval2012/02/22Phasev05 Material statusV05 1/17 ready in ChinaMilestone1/25 production finish Status(1)V05 pilot run 2012/1/16 EPR2, 2012/4/6 EPR3, 2012/6/27 EPR4 20pcs, 2012/10/26 EPR5 20pcs, 2013/01/21 EPR6 30pcs (2)3/15, System reboot, kernel panic, debugging; 3/28, solution fou
4、nd; 4/2 resolved (3)RD on site support in GR on Jul-9, Aug-27, Sep-13 (4)Continue EPR5 EMI debugging Nov.30 arrange pre-test Final EMI test is ongoingNeed to modify layout to solve this EMI issue.(EPR6) (5)Dec-21, keep debugging, lab prescan Pre-scan currently we see the reason why EMI is higher, HW
5、 layout modification is needed for solving this EMI issue, so when EPR6 comes out, we will verify it as a final reason. CONFIDENTIAL MATERIAL Major Project Status Update BFW-71 ModelBFW-71Project codeBJ20110 DescriptionRealtek RT-8192C based 11an 1x1+ 11gn 1x1 outdoor CPE Team memberHW: Lacost, SW:
6、YangPengHW versionV03V04 PRD Approval2012/1/13PhaseEVT EPR3 EPR4 Material status 50sets for EPR (Oct-19) 220 sets for FPR1 (factory) MilestoneFPR1: Aug. 2012, MP: Oct. 2012 Status (1)EPR4 1/151/18 Sample run in TPE. Production finished, start to calibration(1/181/21). EMI pre-scan at 1/23 (2)China m
7、aterials preparing: CFM, 54 items need to be purchased. To Do(1)EPR4 Calibration and EMI Pre-scan. History (1)2012/5/4 EVT EPR1 10pcs; 2012/8/24 EPR2 30pcs, 2012/9/28 EPR3 30pcs, 2013/1/17 EPR4 30pcs. (2)5/6 power layout error, debugging; 5/10 bug found, but must be jumping wired; (3)Jul-25 spec cha
8、nge final (by Raymond, Seed, Jerry) (4)Continue EMI debuggingNov.30, continue debugging Closed. (5)Nov-2, EMI failed Nov-9, EMI debugging Dect.14, only 5500MHz band edge fail left. However it can only pass with lower output power Dec-21, Continue Added filter and we saw pass in pre-scan, modify layo
9、ut to solve this issue. (6) If factorys schedule is not good that we can receive PCBA at the end of Jan., TPE will do EPR4 at 1/221/25. Factory will also do 30pcs samples when TPE confirm EPR4 (FPR1 in China factory) is ok. TPE do EPR4 sample run. CONFIDENTIAL MATERIAL BFW-5221 DVT FPR2 1. Status FP
10、R1 on 2011/11/09, in Kingnet; Going for FPR2 in Function factory DVT done (EMI pre scan pass) 2. Progress Aug-27th, pilot run documents uploaded to FTP for factory Sep-12th, con-call for project transfer to factory Sep-21th, BOM built in factory Oct.12, Material planning, waiting schedule update fro
11、m factory Oct-19, planned on early November Oct-26, FPR2 planned on Nov-15th in China outsourced factory Nov-16, FPR2 on line. 2 pcs tested, all failed Nov. 30, 2 resistors spec incorrect, still identifying the root cause Dec. 10th, 82 pcs tested, 33pcs passed, draft yield rate is 40% Dec. 17th, all
12、 sent back to Taiwan for analysis Dec-21st, its not sync for the factory and RD, may need RD on site support Jan-7, all units were sent back to factory to verify again Jan-12, run test again, waiting final test report Jan-23, the PR report is done, waiting review CONFIDENTIAL MATERIAL FTK SZ Jason/R
13、ockit CONFIDENTIAL MATERIAL Cross Team Projects Accessory 1.Nov-13: To build accessory as part of product offerings, including antenna, PoE adapter and so on; (Owner: Jason) Nov.23 move owner to Rockit TypeActionsOwnerDueUpdate Dec-7 2012 PoEConvert to sellable product and display on our website Roc
14、kitJan 2013 Dec.27 -48V POE that is out sourcing have sent to factory for testing. Dec-13 Describe the model name in a file. RF Jumper (LMR 400) Convert to sellable product and display on our website RockitJan 2013 To be started in mid of Dec Mounting Kit Convert to sellable product and display on o
15、ur website RockitJan 2013 To be started in mid of Dec Cate5e cable Outsource STP Cat5e Ethernet cable, convert to our product and display on our website Andy, Rockit Jan 2013 To be started in mid of Dec Insulation Tape To outsource, convert to our product and display on our website Andy, Rockit Jan
16、2013 To be started in mid of Dec CONFIDENTIAL MATERIAL Cross Team Projects Accessory (Cont) TypeActionsOwnerDueUpdate POE Surge Arrestor Need to open PRD for factory to come out with a enclosure design and make it a sellable product RockitMar 2013 To be started in late Dec AntennaTo convert DLB and
17、LGW internal antenna to finishing products. Rockit, Jerry Mar 2013 Jan.16 Analysis our internal antenna by N/A . And try to match it with new outer casing. Jan.9 Got outer casing of antenna and going to matching for our FR4 PCB antenna. To outsource antenna and convert to our product. RockitMar 2013
18、 Dec.27 Drafted the datasheet of antenna which are product by our factory. Dec.-14 Summarizing the antenna inquire by xiaofeng in a file. CONFIDENTIAL MATERIAL Cross-Team Projects Jerry CONFIDENTIAL MATERIAL Cross Team Projects New Function group website - on-going Oct-12th, ongoing by Jonas Jr. Nov
19、-30, get consensus with Jonas Jr., waiting final approval with Edward in his visit to LT Dec-14th, the design Aug-7th, starting porting agent by SZ team Aug. 31th, on going Server: Waiting inputs from device porting result; Pending Target availability in Q4 time frame. Nov-23, 4 samples will be sent
20、 to LT by Fonsee Dec-21, sent to LT, waiting test result Jan-12, testing Jan. 22, on going CONFIDENTIAL MATERIAL Deiberant/Ligowave 1.Deliberant Sep-4th, Taiwan attorney replied, waiting for approval Sep-18th, approved, budget is high. The countries should be prioritized for the application Sep-28th
21、, waiting country prioritization from Bill Aug-28th, con-call among Tang & Raymond Sep-8th, Technical questions clarified, decision pending for the direction Sep-18th, LT will release x.91-1 version source in late Sep. and modify in Oct. Oct-5th , Confirmed with Raymond to wait for x.92 version, and to be delivered before Nov. Oct-26th, x.92 RC FW was rel
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 妊娠期卒中患者并发症预防策略
- 妊娠期主动脉夹层术后再狭窄的防治策略
- 保育员卫生试题及答案
- 大数据驱动的重金属暴露预测分析
- 大数据赋能医疗资源优化配置
- 大数据在社区肥胖干预效果评估中的应用
- 多院区医疗数据隐私保护的管理策略
- 多胎妊娠合并贫血的纠正方案
- 2026年会计实务(应付账款管理)试题及答案
- 2025年中职服装设计与工艺(缝纫技能训练)试题及答案
- 静脉采血不良事件分析与改进
- JJF 2216-2025电磁流量计在线校准规范
- 2024-2025学年广东省深圳市福田区六年级(上)期末数学试卷
- 发改价格〔2007〕670号建设工程监理与相关服务收费标准
- 道岔滚轮作用原理讲解信号设备检修作业课件
- 小学师徒结对师傅工作总结
- 廉洁征兵培训课件
- 农业机械行业调研报告
- 金融行业风险控制与投资策略研究
- 北京巿通州区2025届高二数学第一学期期末考试试题含解析
- 幼儿园大班语言活动《新年礼物》课件
评论
0/150
提交评论