版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁
2、螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿
3、袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀
4、衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀
5、袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈
6、羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿
7、羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀
8、罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈
9、蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈
10、蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿
11、螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇
12、螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇
13、螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅
14、袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆
15、袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆
16、袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄
17、羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅
18、羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆
19、蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂蝿螈节芈莅袀肅膄莄羃芀蒂莄
20、蚂肃莈莃螅芈芄蒂袇肁膀蒁罿袄葿蒀虿聿蒅葿袁袂莁蒈羄膈芇蒈蚃羁膃蒇螆膆蒁蒆袈罿莇薅羀膄芃薄蚀羇腿薃螂膃肅薂羄羅蒄薂蚄芁莀薁螆肄芆薀衿艿膂蕿羁肂蒁蚈蚁袅莇蚇螃肀芃蚆袅袃腿蚆蚅聿膅蚅螇羁蒃蚄袀膇荿蚃羂羀芅蚂蚂膅膁螁螄羈蒀螀袆膃莆螀罿羆莂 1. generalthe scope of works in the project includes:(a) general(b) setting out(c) drainage works (including lining the trapezoidal drains with concrete or masonry) (d) earthworks ( gr
21、ading, forming , embankment construction and re-gravelling)(e) road paving and surface sealing(f) concrete works(g) road furniture the scope of works include upgrading of the gravel road to bituminous surface dressing and drainage works. we carried out the site inspection conducted by the client and
22、 we are very familiar with the site conditions as relates to these works.2. project administrationwe shall provide, maintain and subsequently remove temporary office, sanitary arrangements, store, workshop and everything necessary for the completion of the works. the site office will be provided wit
23、h all the necessary facilities required including on- site test equipment to test compaction density and survey equipment to ensure that the works done are to specification. at mobilization, we will move all the necessary equipment, personnel and materials to site. this process will take only a mont
24、h from the date of the commencement order.we shall employ female staff as well and shall be paid no less than the government gazette requirement for wages.the consortium will provide a contract manager on the project who will make sure that all resources are available to the project staff for timely
25、 execution of the works.we shall have a site agent/engineer whose duties shall include but not restricted to; programming of the works, progressing and co-ordinating all the works. he will also be responsible for the following: all of the contractors design (where appropriate) construction of all ro
26、ad and drainage works ensuring that all works complied with relevant standard and environment requirement. all correspondence and communication between the employer and the contractor, the engineer and the contractor shall be directed through the contract manager. our proposed project organization c
27、hart is attached.1 3. traffic managementa traffic management plan will be formulated to minimize disruption of traffic flow as works progress. alternative routes shall be opened up for motorist so as not disrupt works as well as inconvenience the motorists. we will endeavor to complete one or two ro
28、ads at a time before moving to other roads so that traffic flow in town is not disrupted. once one road is completed, it will be opened to traffic to restore the flow.4. site preparationclearing shall consist of removal of grubbing all vegetation on the roads including disposal of all material resul
29、ting from the clearing and grubbing as directed by the supervising engineer.only the trees within the right of way which may fall on the carriageway or block the drainage system, or block sight lines shall be removed. 5. method statementkindly refer to the following construction sequence of main pro
30、ject: 2 5.1 repeating surveyaccording to the traverse points and elevation offered by supervising engineer, repeating survey are required by means of total station instrument, involved control pile to be set every 500m along the line. all the project teams shall add piles in accordance with control
31、pile approved by consulting engineering; test、layout centre pile and section pile, 20m in a line segment and 10m in a curve segment, or set it as per requirements of consulting engineer, while test、layout the location of bridge and culvert.as per survey data outside, construction drawing shall be de
32、signed by means of software, including dimension of section、form of structure, which shall be3conducted after approved by consulting engineer.5.2 earthwork & stonework excavation and treatment1、earthwork excavation: excavator or bulldozer will be used to removed gravelly soil. filling materials
33、for roadbed will be delivered to the segment of filling within economical distance after the approval of consulting engineer, and the remaining to be delivered to spoil ground specified (or approved) by consulting engineer. while repairing and compacting for existing roadbed, the bench excavation is
34、 applied in accordance with different types of excavation or filling. the steps and roadbed shall be compacted together, and the thickness is not less than 150mm. after confirmed by supervising engineer, if the excavated materials can be reused, shall be stacked on specified location, and crushed to
35、 extent size as required.2. stonework excavation: a mall amount of excavation for weathered stone will use excavator, however, blasting construction will be used for a large area of stonework excavation.5.3 earthwork construction for roadbedearthwork construction for roadbed will be conducted as per
36、 the following procedures “three stages、four segments、eight technology process”, as follows:three stages: preparation stage、construction stage、completion stage; four segments: filling area、leveling area、rolling area、test area;eight technology process: construction preparation、basement treatment、fill
37、ing in layer、paving and leveling、watering and drying、rolling and compacting、test and signature、roadbed renovation.4 5(1) preparation workestablishment of temporary pavement , arrangement for personnel、machinery entering the arena、waterproof & drainage facilities.selection of materials and compac
38、ting test:compacting test shall be conducted to ensure appropriate technological parameter used in construction stage, approved by supervision. detailed content: selection of suitable compacting machinery;selection of the best fill depth、the best water content; selection of reasonable compaction tim
39、es; confirmation of earth volume in rate of change、coefficient of loose laying; confirmation of reasonable technological process.survey and positioning:set permanent plane and vertical control point, setting out centre line by surveying in the construction area, set the location for toes of roadbed、
40、trench and excavate it as per design position.verifying the geological survey:detailed design documents about engineering geology、hydrology and geological basis, practical situation of this project, involved the similarly construction experience of foundation, the following above items are required
41、prior to commencement of work.it is necessary to carry out additional exploration, to inspect and calibrate geological data based on the original geological data. exploration will be conducted by the methods of static test and vane shear test.(2) base of foundation treatmentsurface clearing: prior t
42、o commencement of work, attachments planted on the land、grass、tree root and other clutters shall be removed, while the thickness of clearing is not less than 0.15m, arrangement for drainage facilities as well. if base of foundation is cultivated land or loosen soil, the original surface shall be rol
43、led and compacted, while the thickness of loosen soil is less than 0.3m; otherwise, the thickness of loosen soil is more than 60.3m, which shall be loosened、crushed、 rolled & compacted based on practical situation; after that, bulldozer will be used to remove humus soil and deliver to spoil grou
44、nd by dump truck. the pits and caves due to cleaning shall be backfilled by using materials (crushed stone) with better water permeability, and shall be compacted as required. after base of foundation cleaning, leveling is required by means of excavator and road grader, while rolling and compaction
45、is required by means of heavy-duty vibratory roller. based on different surface soil, the test shall be conducted to base of foundation, and filling is required after testing qualified.quality inspection of roadbed treatment: surface on base of foundation after foreign matter cleaning, if the bearin
46、g capacity of natural foundation is less than design requirement, base of foundation shall be compacted by vibratory roller, with compactness 95%.(3) filling in layersadhere to the policy “three lines、four levels” during construction. three lines, namely centre line、side boundary; set a red flag eve
47、ry 20m, to confirm the control point of centre line and side boundary. four levels, namely thickness、compactness、camber、smoothness; the thickness of roadbed in layers shall be controlled to ensure the compactness in each layer; strictly control of compactness of filling, to ensure the quality of roa
48、dbed and the settlement are not exceeded; control of camber is required to discharge rainwater in time; control of smoothness to ensure uniform thickness of roadbed after rolling and no water accumulation on roadbed with the rainfall. filling and compaction will conducted in longitudinal layer of cr
49、oss section, and then divided into some construction sites every 200m or between two structures. thickness in layer shall be controlled strictly on the basis of test data. a group of elevation point set on embankment every 20m; however, the thickness is not more than 30cm, while the thickness is not
50、 less than 20cm, and the maximum thickness of virtual layer can not exceed 35cm. filling exceed 4050cm in thickness along the roadbed every time, so as to compact, 7to ensure enough compactness on border of embankment after completion. in the area of backfill soil, the distance between every mound s
51、hall be based on the capacity of dump truck, so as to balance thickness in layers during leveling.5.4 imperfection mending for existing road1. preparationprior to commencement of work, put safety signs on construction sections and close half range of the road, moreover, put speed limit sign on anoth
52、er range of the road, which shall be in the charge of a specially-assigned person. construction activities shall be conducted in the premise of safe operation on highway.for excavated section of highway as required by supervising engineer or on construction drawing, the border excavated firstly is r
53、equired, with sign marked on highway. mechanical equipment、auxiliary tool and personnel shall be confirmed in accordance with different areas and depth.2. excavationchoose suitable tools in accordance with excavation border and depth, assisted with manual excavation, and reserve bench excavation. wh
54、ile discrepancy exists between construction site and construction drawing during excavation, contact with supervising engineer to ensure the best method statement with high quality. excavation materials, which can be utilized again, shall be stacked to the specified place for cycling; otherwise, del
55、ivered to spoil ground.3. mendingbase of foundation treatment shall be conducted firstly for excavated road. after achieving smoothness and compactness as required, back fill in layers as per design requirement. filling material and thickness shall be in compliance with required specification, moreo
56、ver, foundation and selected layer shall be back-filled by using qualified gravelly soil; stabilized gravelly soil will be used for base back-filling. after back-filling and leveling finished, compaction shall 8be conducted on time, and electric hammer used to compact potholes and corners, with curi
57、ng of watering. stabilized gravelly soil can be mixed on the site for the area of mending, however, the method of central mixing can be used for the potholes, and finished materials delivered to back-filling. not exceed the initial setting time of cement during construction.5.5 base constructioncons
58、truction technology chart for cement stabilized soil: 1. preparationpreparation for bearing layer: before cement and gravel spreading, compactness、smoothness and dimension of foundation or base course shall be checked complied with specification as required.(1) survey: recover centre line on base or
59、 roadbed, one pile will be set every 15-20m on straight segment, and another pile set every 10-15m on curve segment, moreover, indication pile set on both sides of shoulder. design elevation of cement and gravel shall be marked on indication pile for surveying.(2) materials preparation: materials used for construction activities shall be taken
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026档案法制知识竞赛题库(+答案)
- 2026年初级统计师考试统计专业知识和实务备考题及答案详解
- 2026健康饮品市场消费需求分析及未来趋势与商业机会评估报告
- 2026余压发电行业数据监测体系与市场预测模型报告
- 2026会议用水采购行为研究及大客户管理与服务优化策略报告
- 2026人工智能行业当前态势专业调研及创新突破方向与财富扩张空间预判论文
- 2026人工智能医疗系统行业市场现状应用分析投资评估规划分析报告
- 2026中国直播电商行业生态重构与流量变现模式报告
- 2026中国植物工厂行业能耗优化与经济作物种植可行性分析报告
- 2026年广东省深圳市第一中学九年级化学第9章测试卷及答案
- 财务业务伙伴制度
- 学生意外伤害事故过程调查表2026年
- 土鸡快乐养殖技术培训课件
- DB34∕T 4450-2023 涉路施工交通安全管理规范
- 市政管网改造施工中的防水防漏方案
- DB35∕T 2033-2021 姜黄栽培技术规范
- 2024年医疗器械经营管理制度岗位职责等岗前培训(共4篇)
- 主题活动我们的校园(1)(课件)数学青岛版二年级上册
- 《先进制造技术》课件(共七章)
- 支气管哮喘的急救护理
- 电工基础课程说课课件
评论
0/150
提交评论