1、I. Design philosophy1. Crude oil production, separation and treatingThe GOM facility required more equipment for crude oil production, separation and treating due to the lower well productivity, lower surface flowing temperature and requirements for lower RVP for sales. The GOM design had a manifold
2、 allowing each well to be produced into any one of three stages of bulk separation, heating, electrostatic oil treater and dry/wet oil tanks.The North Sea facility had all wells routed to the first stage separator, no oil treater, cooling for stabilization, a surge vessel but no dry oil tank.2. Gas
3、compression and treatingGOM facility had no provision for lowering hydrocarbon dewpoint. It included a triethylene glycol system designed for 7lb /MMSCF water content in the sales gas.The North Sea system included a propane refrigeration system to chill the gas for both water and hydrocarbon dewpoin
4、t control.3. Produced water treatment and disposalThe GOM facility included two stages of water treating (CPI and Flotation) while the North Sea facility utilized flash separation and one stage of water treating (Flotation).4. Waterflood systemThe GOM facility utilized natural gas stripping and cart
5、ridge filters.The North Sea facility utilized sand filtration and vacuum degassing.5. Power generationIn GOM, compressors and pumps greater than approximately 500 HP normally have their own prime mover. With the waterflood pumps, pipeline pumps, main compressor and high pressure booster compressor a
6、ll being driven by turbine prime movers, three 850 KW generators are sufficient for remaining electrical load.The North Sea philosophy operated motor driven pumps and provided a large central power generation facility. Two 23 megawatt turbine generators sets were selected for thisstudy. No spare uni
7、t was provided as the waterflood load can be shed temporarily while a unit is being serviced.6. ElectricalIn the GOM design Control cables and 480 volt power cables are run to each motor which is not part of a major package. The compressors, waterflood pumps, pipe1i ne pumps and quarter packages eac
8、h have one set of 480 volt cables run to them with individual motor starters included in their control panels. Miscel1aneous, 120 volt and 208 volt branch feeders are used for lighting, space heaters, etc.In the North Sea facility, three voltage levels are utilized. The 11,000 volt system feeds the
9、large horsepower motors such as the 4,000 HP waterflood pump motors, the refrigeration compressor motor and the pipeline pumps. The sea water lift pump motors are run off of the 3300 volt system and the remaining motors are run off of the 415 volt system.7. InstrumentationGOM platform has local pneu
10、matic process control with a pneumatic shutdown system. Each major piece of equipment has a local shutdown panel which sends and receives single pneumatic signals to and from the central .shut-down panel. A 12 VDC control provides a mimic of this panel in the quarters building. The main prime movers
11、 each have their own local electro pneumatic panel which provides for start-up and shut-down sequencing, operational control and the sending and receiving of status and shutdown signal s to and from the central shut-down panel.North Sea instrumentation is generally electronic with RTUs (remote termi
12、nal units) and PLCs (programmable logic controllers) for constant monitoring, and analysis of platform information in the main control room and onshore if desired. This type of control system requires over forty interconnecting control logic units for various platform package systems. Each module is
13、 equipped with platform status lights and a public address system with telephones for direct communications with other modules or the main control room.8. Fire protectionThe Gu1f of Mexico platform has a firewater loop supplied by electric motor driven seawater pumps. It has no fixed spray system or
14、 diesel powered firewater pump.In the North Sea facility the protection systems for each process module consist of water deluge, fixed hose reels and portable fi re extinguishers. Four diesels driven fire pumpslocated in pairs in different modules are provided. Firewalls isolate process modules and
15、the HVAC system is interconnected with the fire protection system.9. Heating and VentilationThe Gu1f of Mexico system has open modules with no requirement for heating and ventilation.In North Sea design, two separate ventilation systems completely isolated from one another. One system operates under a slightly
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年作物科学与技术专业技能考核试卷及答案
- 2025年智能财务管理师考试试题及答案
- 2025年职业健康管理师考试试题及答案
- 2025年投资分析师考试试卷及答案
- 2025年网络数据分析师考试题及答案
- 2025年国际贸易专业考生模拟考试试卷及答案
- 2025年非营利组织管理与运营考试试题及答案
- 2025年金融学理论与实务测试试题及答案
- 2025年教育心理学综合考试试题及答案
- 2025年景观设计与生态评估考试试题及答案
- GB/T 21739-2008家用电梯制造与安装规范
- GB 21670-2008乘用车制动系统技术要求及试验方法
- GA/T 1275-2015石油储罐火灾扑救行动指南
- 家务服务员理论考试试题题库及答案
- 交通安全培训课件-道路交通事故十大典型案例-P
- 投标报名登记表格式
- DB4211T12-2022医疗废物暂存间卫生管理规范
- 第二讲公文语言及结构(1语言)分析课件
- 氯氧铋光催化剂的晶体结构
- 低压电气装置的设计安装和检验第三版
- 国际商务管理超星尔雅满分答案
评论
0/150
提交评论