




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Weather Impacts to Columbia Metropolitan Airport Operations Topics Department Overview 部门概述 The Airport System 机场体系 Severe Weather Processes恶劣天气进程 Operational Impacts 运行性影响 Recent FAA Changes to Airport Winter Ops最近FAA机场冬季运行的政策变化IntroducingCAEs Operations Department12 people with diverse educational
2、/aviation backgrounds Airline Ops, Pilots, Movement Controllers, Safety, Law Enforcement, Security, Military Airfield Ops, MeteorologyDiversity aids “big picture” decision-makingEmergency, routine and non-routine airport events2600+ acre facility we make it happen!Established as a separate departmen
3、t in 1995 2 Coordinators on duty at all times (803) 822-5050, Airport Operations CenterAreas of Responsibility Airfield Certification, Inspections, NOTAMs FAR Part 77 & 139 Compliance/Certification Emergency and Routine Dispatch Tenant Severe/Winter Weather Notification Airport Facility Inspections
4、Airfield Driver Training and Orientation Maintenance Work Order Submittal And.anything else to keep CAE running!Airport System Landside Component (ground movement) Passengers, cargo to/from from the air interface Roads, parking, pax/cargo unloading ramps GA (FBOs), fuel farms, pax/cargo terminals (t
5、he “bridge”) Airside Component (air movement) Air interface - aircraft around airport, to/from the air Airfield - runways, taxiways, aprons, approach systems, lighting, etc. Airspace just as important as any ground-based assetAirport System Weatherespecially unplanned creates DELAYS Can lead to poor
6、 operational decisions, affects: Capacityability to handle traffic volume over time Safety (concern #1) Costs up.revenues (concern #2) down We are a heavily-dependent “weather intel” user Good intel aids decision processesSevere Weather ProcessesReceipt of NWSFO Columbia Watch/WarningAlso receive cr
7、ash phone calls from tower.tornado! Disseminate to airport agencies/tenantsRadio, telephone:Fixed Base Operators (General Aviation and Fueling)AirlinesCargo CarriersAirline MaintenanceContractors (airport construction)Key CAE Staff, Police and ARFFSevere Weather ProcessesIncrease METWATCH, Airfield/
8、Facility InspectionsWinter weatherpavement condition, friction surveysImplement Snow/Ice Control Plan (more later)Anticipate and implement emergency plansProtect peopleshelter areasevacuationsIncrease airfield, facility inspection frequencyIssue NOTAMsCoordinate, aid in accomplishing recovery/repair
9、 effortsWeather ImpactsLow Ceilings and Visibilities Maintenance coordination generators for Cat II/III ILS Airfield lighting, NAVAIDs, approach lighting Other airports.divert flow & parking, ramp space Vehicular traffic flow, public safety Passenger overflow/security and public safety issuesPrecipi
10、tationAirside Ponding, taxiway and runway friction/safety Airfield marking/lightingLandside Vehicle/pedestrian traffic safety Physical plant impactsWeather Impacts High winds Runway selection/crosswinds Airside flow impeded Airfield fixtureslighting, signage Power issues Road blockages Landside flow
11、 impeded Ramp safetyprojectiles/maintenance Passenger/employee comfort/injuries (response) Thunderstorms All of the above, plus Fueling and airfield lightning safetyJuly 18, 2007Lightning Damage!High WindsErosionDrainage/RunoffDrainage/RunoffPondingattractant to wildlifeOld Man WinterClimatology dat
12、a helps CAE plan each seasonchemical, equipment and personnelWinter Weather OperationsNew to CAENAC Dynamic Friction TesterImpactsEarly notice helps us swing into gear!Implement Snow and Ice Control PlanRecall Personnel, Position EquipmentBegin Anti-Ice Agent ApplicationContinuous MonitoringContinuo
13、us ActionRunway/Taxiway/Ramp Condition SurveysTimely and Accurate Notices to AirmenWinter Weather OperationsPavement Area ConditionBraking ActionDirectional Control Runway Incursion PotentialRoads, Parking Areas and Traffic SafetyPlowing OperationsSafety IssuesObscured lighting/signage/NAVAIDsDamage
14、d lighting/signageWindrowed/drifted snowobstruction hazardsCAE Snow Removal PrioritiesFAA Winter Ops GuidanceFAA Advisory Circular 150/520-30C (12/9/08)Weather Support to Deicing Decision Making (WSDDM) systems, surface condition sensors & other technologyChanges this winter:No known correlation bet
15、ween “Mu” and braking actionMEDIUM braking action term no longer usedICAO term FAIR now used instead 2 consecutive POOR braking action PIREPsMust conduct runway condition assessmentsContinuous monitoring, timely & accurate NOTAMs requiredAny PIREP of NIL closes the runwayThe Bottom LineWe appreciate your efforts!Airport system interfaces landside
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 工业园区规划与产业升级策略
- 工业排污控制与治理
- 工业旅游景区规划与环境设计研究
- 工业机器人设计与维护指南
- 工业废水处理工程验收案例分享
- 工业机器人技术及其产业发展
- 工业机器人故障诊断与预防技术
- 工业设备故障排查与预防措施
- 工业涂装生产线的发展趋势与挑战
- 工业设计在智能制造中的作用
- 《公路桥涵养护规范》(5120-2021)【可编辑】
- 人教版三年级语文上册期末试卷及答案【完整】
- 基因工程(研究生课程班)
- 煤矿顶板事故预防及应急处置知识培训课件(2022修改版)
- 20t╱h循环流化床锅炉安装工程施工方案
- 交通安全知识考试题库100道(含答案)
- 职业与人生论文
- 昆明市用人单位人员就业(录用)登记表
- 公司职业病危害防治责任制度
- 第十八章:爬行纲课件
- 米亚罗-孟屯河谷风景名胜区旅游基础设施建设项目环评报告
评论
0/150
提交评论