




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、acca p5 advanced performance managementperformancemanagementpart 3friday 6 december 2002question papertime allowed 3 hoursthis paper is divided into two sectionssection a both questions are compulsory and must beansweredsection b two questions only to be answeredpaper 3.3section a both questions are
2、 compulsory and must be attempted1 privmed is a privately owned profit seeking hospital that specialises in operations to replace hip and knee joints.privmed traditionally determines its prices by adding a 10% mark-up to the budgeted full cost of an operation. thefixed overheads are absorbed on the
3、basis of operating hours using a predetermined rate. privmed operating and financial data for 2001hip knee totaltotal operating capacity (hours) 10,800theatre utilisation ratio 70%average duration of operation 3·0 hours 3·6 hoursnumber of operations taken * 1270total costs ?15,036,780fixed
4、 overheads ?12,000,000* not giventhe variable costs per operation are as budgeted.privmed budgeted data for 2001hip knee totalfixed overhead ?12,000,000annual operating hours 8,000variable cost per operation ?1,450 * not givenrequired:(a) calculate the number of hip operations undertaken during the
5、year and the variable cost of performing a kneeoperation. (4 marks)(b) calculate the prices that privmed would have charged in 2001 for:(i) a hip operation;(ii) a knee operation. (4 marks)(c) an activity based costing study recently discovered that the fixed overheads are determined by non operating
6、 timerelated activities. the study revealed the following data:activity cost driver hip knee fixed 0verheadsconsultations with potential patients number of consultations 3,000 2,000 ?8,980,000x-rays number of x-rays 6,200 6,200 ?1,800,000post-operative care days of care 7,860 23,580 ?1,220,000requir
7、ed:re-calculate the prices that would have been charged in 2001 for each knee and hip operation by using anactivity based costing approach. (5 marks)(d) compare the results of your calculated prices in (b) and (c) and suggest with reasons what pricing decisionsyou would recommend to the hospital. (5
8、 marks)(8><#004699'>e) the regional public health authority is under pressure to reduce the length of its patients waiting lists for kneeand hip operations. in an effort to improve the situation the area manager has approached privmed and askedthem to consider whether they would underta
9、ke some operations on a fee-paying basis. the approach iswelcome, as the hospitals theatre manager would like to improve the utilisation of the facilities. indeed, thehospital recently employed a consultant for a fee of ?70,000 to assess the financial viability of undertaking publichealth authority
10、operations at differing levels. the consultant concluded that contracting to undertake publichealth authority operations would also add to the administrative workload currently undertaken by the hospital<#004699'>e.g. billing and quality monitoring activities. it would be necessary to empl
11、oy an additional clerk for ?15,000 paand additional variable administrative cost per operation would be ?150 for a knee operation and ?100 for a hipoperation. if the hospital were to take on this work, it must also consider an additional requirement to keep 2·5%of its total operating capacity s
12、pare to meet the immediate needs of its special clients i.<#004699'>e. it cannot plan to usethis proportion of its total capacity.2the public health authority has approached the hospital and has proposed two alternative one-year contracts:contract (1)the hospital would be required to perfo
13、rm an equal number of hip and knee operations during the next year thatwould utilise their remaining available spare capacity. the public health authority has agreed that the contractprice should be composed of all the relevant incremental costs of the contract plus an 80% mark up.contract (2)the ho
14、spital would be required to perform 1,500 knee operations. the public health authority will refund all theadditional administrative costs resulting from the contract. the 1,500 additional knee operations would requirethe hospital to install a temporary operating theatre for a total cost of ?500,000
15、with a two-year life. oncompletion of the contract, the hospital estimates that it could lease the temporary theatre during its second yearwith the following revenue estimates:30% probability of earning ?200,00040% probability of earning ?100,00030% probability of earning ?80,000the public health au
16、thority is only prepared to pay ?3,500,000 in addition to the refund of administrative costsfor this one-year contract.required:(i) calculate the contract price and estimated financial benefit of contract 1; (7 marks)(ii) calculate the estimated financial benefit of contract 2. (3 marks)note: the da
17、ta/calculations in this section are at 2001 price levels. (f) if either of the contracts were to be taken on, it would result in no capacity being available to meet an unexpectedincrease in demand from its private patients.required:explain the potential revenue consequences of such an event occurrin
18、g and compile a list of information/datathat you require to assess the financial consequences of the private patient demand unexpectedly rising to80% of the total capacity during the contract year. (7 marks)(g) suggest three broad areas of non-financial performance that the public health authority i
19、s likely to have tomonitor as part of a contract involving knee and hip operations. your answer should include specific variablesthat are to be monitored. (5 marks)(40 marks)3 p.t.o.2 mack-king, a long established uk fast food chain expanded its operations abroad for the first time in 1999 in coja.a
20、lthough the uk business is much larger than the new operation in coja, they both operate as semi-autonomousbusiness divisions with their own performance targets. compared with the uk, the coja business environment ischaracterised by significant political uncertainty and limited general awareness of
21、mack-king products and outletlocations.financial data (?000) for mack-king2000 actuals 2001 actualsuk coja total uk coja totalturnover 780 70 850 845 106 951less:labour 200 10 210 216 12 228materials 150 20 170 165 24 189other operating costs 80 5 85 85 5 90 430 35 465 466 41 507 marketing 60 30 90
22、70 70 140interest (group) 14 41depreciation and amortisation 100 8 108 100 16 116 160 38 212 170 86 297 total costs 590 73 677 636 127 804profit 190 (3) 173 209 (21) 147nbv of fixed assets (year end) 520 40 560 520 90 610(includes capital expenditurein the year)capital expenditure in year 90 30 120
23、100 66 166long-term debt (group) 140 340capital and reserve 600 744required:(a) provide an assessment of the total corporate financial performance of mack-king and of the contributionmade towards it by each of the two divisions between 2000 and 2001. (8 marks)(b) identify and explain the purpose of
24、any additional information that would be required to provide a morecomplete assessment of mack-kings financial performance. (4 marks)(c) explain the problems that may arise in endeavouring to assess the comparative financial performance of themanagement in the two divisions. suggest any allowances/a
25、djustments that could be made to improve thevalidity of any comparisons between managers operating in different countries. (4 marks)(d) suggest two separate measures of performance that would be appropriate for a fast food chain, for each ofthe following areas:service quality;marketing effectiveness
26、;personnel;food preparation. (4 marks)(20 marks)4section b two questions only to be attempted3 you are responsible for managing the preparation of all revenue and cost budgets for a motor componentmanufacturer. you are aware that the external environment has a significant impact on the business acti
27、vity andfinancial performance of your company and that the current information systems are underdeveloped and ineffectivein this respect.required:(a) identify which aspects of the external environment you are likely to consider and give reasons for your choice.(10 marks)(b) identify where you might
28、find the relevant sources of information. (5 marks)(c) suggest how an external environment information system could be introduced into your company.(5 marks)(20 marks)4 (a) explain the role and content of a mission statement. (5 marks)(b) explain how a mission statement could contribute towards the
29、planning and performance measurementprocess. (9 marks)(c) identify the potential problems arising from using a mission statement to manage performance. (6 marks)(20 marks)5 an essential aspect of financial and business planning is concerned with estimating costs and revenues and decidingthe optimum
30、output and price levels. a company produces a single product and operates in a market where it has tolower the sale price of all its units if it wishes to sell more. the companys costing and marketing departmentscurrently use the following cost and revenue model (all output is sold in the current pe
31、riod):current model:total costs = 5,000 + 0·6xtotal revenue = 20x 0·01x2where x = the number of units soldthe company has recently updated its cost and revenue model:revised model:total costs = 4,750 + 0·8xtotal revenue = 19x 0·009x2the acceptability of the current model and the
32、proposed changes as a basis for profit planning and for monitoringperformance is to be reviewed.required:(a) explain the structure of the current and the revised model. (4 marks)(b) it has been estimated that the revised model will result in an optimal output of 1,011 units being produced andsold.(i
33、) suggest two alternative ways of determining this optimal level of output. (3 marks)(ii) discuss the extent to which adherence to this output target is a satisfactory indicator of managerialperformance. (3 marks)(c) name and comment on cost and revenue factors which should be considered in order to
34、 improve the validityof the model as a profit forecasting model. (10 marks)(20 marks)end of question paper5performancemanagementpart 3friday 6 june 2003question papertime allowed 3 hoursthis paper is divided into two sectionssection a both questions are compulsory and must beansweredsection b two qu
35、estions only to be answeredpresent value and annuity tables are on pages 7 and 8paper 3.32section a both questions are compulsory and must be attempted1 a motor car manufacturer has been specialising in the production and sale of one model of car. the model issomewhat dated, and the current sales fo
36、recast indicates that the sales will decline from the current level (2003) of170,000 cars per annum to 150,000 in 2004, 130,000 in 2005 and 110,000 in 2006. the company suppliesto order and no stocks are held. carbon monoxide emission regulations will prevent the model being manufacturedand sold aft
37、er december 2006. the companys current estimates of the selling price and costs in 2004 are as follows:per car ?selling price 9,500production costs:material and labour (vary with production volume) 3,600assembly* 4,000*75% of the assembly costs are fixed and the remainder vary with production volume
38、.in addition, the company estimates that it will incur the following non-production costs: marketing costs of ?60 million. 50% of these vary with sales volumedelivery costs of ?75 million. 20% of these vary with sales volume.the administration costs of ?10 million are fixed.the selling price, variab
39、le costs per car and total fixed costs are expected to remain constant throughout the periodfrom 2004 to 2006.the companys managing director is unhappy with the current annual profit forecasts for 20042006 based uponthe information above and believes that the company has the potential to increase th
40、e profit to ?280m in each of theyears 2004 to 2006. the managing director has undertaken a strategic review and developed the following strategies:strategy 1a marketing proposal will enable the company to enter a new overseas market with the result that the total (includingthe overseas market) sales
41、 level will be stabilised at 160,000 cars per annum from 2004 to 2006. the market entrycosts will be ?30 million for each of the three years.strategy 2a re-design of the car will enhance its sales appeal and will permit the company to increase its selling price to?10,000. the re-design costs are ?30
42、 million and are to be amortised over three years on a straight line basis. strategy 3a radical cost reduction programme will improve efficiency and lower all variable costs by 20%. this will add ?70million to the annual fixed overheads each year from 2004 to 2006.23 p.t.o.required:(a) prepare a fin
43、ancial analysis showing the current annual forecast of costs, revenues and profits for each ofthe years 2004 to 2006 and briefly comment on the figures. ignore inflation. (6 marks)(b) estimate the profit in 2004 if:(i) strategy 1 was implemented; (2 marks)(ii) strategy 2 was implemented; (2 marks)(i
44、ii) strategy 3 was implemented. (2 marks)(c) estimate the profit in 2004 if all three strategies were implemented. (4 marks)(d) explain why the total of the increase in profit arising from the three strategies implemented separately in (b)is different from the total profit calculated in (c). illustr
45、ate your answer with a numerical reconciliation of thedifferences in the two profit figures. (5 marks)(<#004699'>e) explain how gap analysis can be used to assist a company to plan the achievement of its strategic profitobjective. illustrate your answer with a diagram which quantifies the
46、effect of your calculations in (a), (b),(c) and (d) above. (7 marks)(f) (i) explain how sensitivity analysis could be used in conjunction with the profit estimates that you havemade for the company and illustrate your answer with reference to each of the strategies;(ii) calculate and comment on the
47、percentage change in the key variable in each of strategies 1, 2 and 3from its original forecast level in order that the desired profit level of ?280m for 2004 will be achievedin each case. (8 marks)(g) what major external environmental factors need to be considered in assessing the success of the t
48、hreestrategies? (4 marks)(40 marks)42 a large conglomerate with diverse business activities is currently considering whether it should commence project xand has gathered the following data:project x data1. an initial investment of ?54 million will be required on 1 january year 1. the project has a t
49、hree year life witha nil residual value. depreciation is calculated on a straight line basis.2. the project is expected to generate annual revenue flows of ?80m in year 1, ?90m in year 2 and ?100m inyear 3. these values may vary by ±5%.3. the incremental costs will be ?50m in year 1, ?60m in ye
50、ar 2 and ?70m in year 3. these may vary by ±10%.4. the most likely cost of capital is 10%.this may vary from 8% to 13% for the life of the project.additional information:assume that all cash flows other than the initial investment take place at the end of each year. use the written down value o
51、f the asset at the start of each year to represent the value of the asset for the year.note: ignore taxation required:(a) prepare two tables showing net profit, residual income and return on investment for each year of the projectand also net present value (npv) for:(i) the best outcome;(ii) the wor
52、st outcome. (8 marks)(b) explain the distinctive features of residual income, return on investment and net present value inmeasuring financial performance.your answer should include a critique of the strengths and weaknesses of each measure. (8 marks)(c) what broader issues are likely to be consider
53、ed when deciding whether the company should proceed with aparticular project? (4 marks)(20 marks)5 p.t.o.section b two questions only to be attempted3 velo racers has designed a radically new concept in racing bikes with the intention of selling them to professionalracing teams. the estimated cost a
54、nd selling price of the first bike to be manufactured and assembled is as follows:?materials 1,000assembly labour (50 hours at ?10 per hour) 1,500fixed overheads (200% of assembly labour) 1,000profit (20% of total cost) 1,500selling price 3,000velo racers plans to sell all bikes at total cost plus 2
55、0% and the material cost per bike will remain constantirrespective of the number sold.velo racers management expects the assembly time to gradually improve with experience and has estimated an 80%learning curve.a racing team has approached the company and asked for the following quotations:1. if we
56、were to purchase the first bike assembled, and immediately put in an order for the second, what would bethe price of the second bike?2. if we waited until you had sold two bikes to another team, and then ordered the third and fourth bikes to beassembled, what would be the average price of the third and fourth bikes?3. if we decided to immediately equip our entire team with the new bike, what would be the price per bike if weplaced an order for the first
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 25年公司安全管理员安全培训考试试题含答案【考试直接用】
- 2024-2025职工安全培训考试试题有解析答案
- 2024-2025项目部安全培训考试试题含答案(新)
- 2025双方协商解除劳动合同协议书样本
- 2025刺绣工艺合作合同书
- 2025铝合金风管系统安装工程合同
- 2025代理销售合同范本
- 2025年大功率激光传输石英光纤项目建议书
- 2025商业地产销售代理合同
- 2025年基因缺失重组疫苗项目合作计划书
- 电子书 -《商业的底层逻辑》
- 农贸市场消防应急预案演练总结
- 2023年湖北宜昌高新区社区专职工作人员(网格员)招聘考试真题及答案
- 外贸谈判知识分享课件
- 《患者疼痛管理》课件
- 基于AI人工智能的智慧园区融合感知平台建设方案
- JB T 7689-2012悬挂式电磁除铁器
- 课件-错账更正
- 现代汉语语料库词频表CorpusWordlist
- GB/T 5465.2-2023电气设备用图形符号第2部分:图形符号
- 学校德育活动安排表
评论
0/150
提交评论