版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、土木工程外文翻译题目: 高层建筑 学院: 兰州交通大学博文学院 专业: 土木工程 班级: 08级土木5班 学号: 20081258 学生姓名: 指导教师: 完成日期: 2012年3月11号 一、外文原文:tall building structuretall buildings have fascinated mankind from the beginning of civilization, their construction being initially for defense and subsequently for ecclesiastical purposes. the gro
2、wth in modern tall building construction, however, which began in the 1880s, has been largely for commercial and residential purposes.tall commercial buildings are primarily a response to the demand by business activities to be as close to each other, and to the city center, as possible, thereby put
3、ting intense pressure on the available land space. also, because they form distinctive landmarks, tall commercial buildings are frequently developed in city centers as prestige symbols for corporate organizations. further, the business and tourist community, with its increasing mobility, has fuelled
4、 a need for more, frequently high-rise, city center hotel accommodations.the rapid growth of the urban population and the consequent pressure on limited space have considerably influenced city residential development. the high cost of land, the desire to avoid a continuous urban sprawl, and the need
5、 to preserve important agricultural production have all contributed to drive residential buildings upward.ideally, in the early stages of planning a building, the entire design team, including the architect, structural engineer, and services engineer, should collaborate to agree on a form of structu
6、re to satisfy their respective requirements of function, safety and serviceability, and servicing. a compromise between conflicting demands will be almost inevitable. in all but the very tallest structures, however, the structural arrangement will be subservient to the architectural requirements of
7、space arrangement and aesthetics.the two primary types of vertical load-resisting elements of tall buildings are columns and walls, the latter acting either independently as shear walls or in assemblies as shear wall cores. the building function will lead naturally to the provision of walls to divid
8、e and enclose space, and of cores to contain and convey services such as elevators. columns will be provided, in otherwise unsupported regions, to transmit gravity loads and, in some types of structure, horizontal loads also.the inevitable primary function of the structural elements is to resist the
9、 gravity loading from the weight of the building and its contents. since the loading on different floors tends to be similar, the weight of the floor system per unit floor area is approximately constant, regardless of the building height. because the gravity load on the columns increases down the he
10、ight of a building, the weight of columns per unit area increases approximately linearly with the building height.the highly probable second function of the vertical structural elements is to resist also the parasitic load caused by wind and possibly earthquakes, whose magnitudes will be obtained fr
11、om national building codes or wind tunnel studies. the bending moments on the building caused by these lateral forces increase with at least the square of the height, and their effects will become progressively more important as the building height increases.once the functional layout of the structu
12、re has been decided, the design process generally follows a well defined iterative procedure. preliminary calculations for member sizes are usually based on gravity loading augmented by an arbitrary increment to account for wind forces. the cross-sectional areas of the vertical members will be based
13、 on the accumulated loadings from their associated tributary areas, with reductions to account for the probability that not all floors will be subjected simultaneously to their maximum live loading. the initial sizes of beams and slabs are normally based on moments and shears obtained from some simp
14、le method of gravity load analysis, or from codified mid and end span values. a check is then made on the maximum horizontal deflection, and the forces in the major structural members, using some rapid approximate analysis technique. if the deflection is excessive, or some of the members are inadequ
15、ate, adjustments are made to the member sizes or the structural arrangement. if certain members attract excessive loads, the engineer may reduce their stiffness to redistribute the load to less heavily stressed components. the procedure of preliminary analysis, checking, and adjustment is repeated u
16、ntil a satisfactory solution is obtained.invariably, alterations to the initial layout of the building will be required as the client's and architect's ideas of the building evolve. this will call for structural modifications, or perhaps a radical rearrangement, which necessitates a complete
17、 review of the structural design. the various preliminary stages may therefore have to be repeated a number of times before a final solution is reached.speed of erection is a vital factor in obtaining a return on the investment involved in such large-scale projects. most tall buildings are construct
18、ed in congested city sites, with difficult access; therefore careful planning and organization of the construction sequence become essential. the story-to-story uniformity of most multistory buildings encourages construction through repetitive operations and prefabrication techniques. progress in th
19、e ability to build tall has gone hand in hand with the development of more efficient equipment and improved methods of construction.earthquake faultsthe origin of an earthquakean earthquake originates on a plane of weakness or a fracture in the earth's crust, termed a "fault". the eart
20、h on one side of the fault slides or slips horizontally and /or vertically with respect to the earth on the opposite side, and this generates a vibration that is transmitted outward in all directions. this vibration constitutes the earthquake.the earthquake generally originates deep within the earth
21、 at a point on the fault where the stress that produces the slip is a maximum. this point is called the hypocenter or focus and the point on the earth's surface directly above this point is called the epicenter. the main or greatest shock is usually followed by numerous smaller aftershocks. thes
22、e aftershocks are produced by slippage at other points on the fault or in the fault zone.types of earthquake faultsfaults are classified in accordance with the direction and nature of the relative displacement of the earth at the fault plane. probably the most common type is the strike-slip fault in
23、 which the relative fault displacement is mainly horizontal across an essentially vertical fault plane. the great san andreas fault in california is of the type. another type is termed a normal fault when the relative movement is in an upward an downward direction on a nearly vertical fault plane. t
24、he great alaskan earthquake of 1964 was apparently of this type. a less common type is the thrust fault when the earth is under compressive stress across the fault and the slippage is in an upward and downward direction along an inclined fault plane. the san fernando earthquake was generated on what
25、 has usually been classified as a thrust fault, although there was about as much lateral slippage as up and down slippage due to thrust across the inclined fault plane. some authorities refer to this combined action as lateral thrust faulting. the compressive strain in the earth of the san fernando
26、valley floor just south of the thrust fault was evidenced in many places by buckled sidewalks and asphalt paving.forces exerted by an earthquakeslippage along the fault occurs suddenly. it is a release of stress that has gradually built-up in the rocks of the earth's crust. although the vibratio
27、nal movement of the earth during an earthquake is in all directions, the horizontal components are of chief importance to the structural engineer. these movements exert forces on a structure because they accelerate. this acceleration is simply a change in the velocity of the earth movement. since th
28、e ground motion in an earthquake is vibratory, the acceleration and force that it exerts on a structure reverses in direction periodically, at short intervals of time.the structural engineer is interested in the force exerted on a body by the movement of the earth. this may be determined from newton
29、's second law of motion ' which may be stated in the following form:f=main which f is a force that produces an acceleration a when acting on a body of mass m. this equation is nondimensional. for calculations m is set equal to w/g, then:f=w/g*a (1)in which f is in pounds, a is in feet per se
30、cond per second, w is the weight of the body also in pounds and g is the acceleration of gravity, which is 32.2 feet per second per second.equation (1) is empirical. it simply states the experimental fact that for a free falling body the acceleration a is equal to g and the acceleration force f is t
31、hen equal to the weight w.for convenience, the acceleration of an earthquake is generally expressed as a ratio to the acceleration of gravity. this ratio is called a seismic coefficient. the advantage of this system is that the force exerted on a body by acceleration is simply the corresponding seis
32、mic coefficient multiplied by the weight of the body. this is in accordance with equation (1) in which a/g is the seismic coefficient.activity of faultsall faults are not considered to present the same hazard. some are classified as "active" since it is believed that these faults may under
33、go movement from time to time in the immediate geologic future. unfortunately in the present state-of-the-art there is a good deal of uncertainty in the identification of potentially active faults. for example, the fault that generated the san fernando earthquake did not even appear on any published
34、 geological maps of the area. this fault was discovered to be active only when it actually slipped and ruptured the ground surface. accordingly the identification of active faults and geologically hazardous areas for land use criteria and for hazard reduction by special engineering may be of questio
35、nable value.only in very recent years have geologists begun to try to evaluate the potential activity of faults that have no historical record of activity. by close inspection of a fault, visible in the side walls of a trench that cuts across the fault, it is sometimes possible to determine if it ha
36、s been active in recent times. for example, if the trace of the fault extends through a recent alluvial material, then there must have been slippage since that material was deposited. however fault ruptures may be very difficult or impossible to see in imbedded material such as sand and gravel. also
37、 of course the location of the fault must be known and it must reach the surface of the ground in order to inspect it by trenching.evidence of the historical activity of a fault may sometimes be obtained by observing the faulting of geologically young deposits exposed in a trench. such deposits are
38、generally bedded and well consolidated so that fault rupture can easily be seen.the approximate time of formation of a fault rupture or scarp has in some cases been determined by radiocarbon analysis of pieces of wood found in the rupture or scarp.in addition to evidence of young fault activity obta
39、ined by trenching, there also may be topographic evidence of young faulting such as is obvious along the san andreas fault. vertical aerial photographs are one of the most important methods for finding topographic evidence of active faults. this evidence, which includes scarps, offset channels, depr
40、essions, and elongated ridges and valleys, is produced by fault activity. the age of these topographic features and therefore the time of the fault activity, can be estimated by the extent to which they are weathered and eroded.二、外文译文:高层建筑结构高楼大厦已经着迷,从人类文明的开始,其建设是国防和最初其后教会的目的。现代高层建筑的增长,然而,这在19世纪80年代开
41、始,在很大程度上是为商业和住宅用途。高商业楼宇,主要是对商业活动的需求响应作为彼此接近,并到城市中心,如可能,从而使在现有的土地空间的巨大压力。此外,因为它们形成鲜明的标志性建筑,高商业楼宇,经常制定了促进企业组织的威信的象征的城市中心。此外,商业和旅游界与流动性日益增加,已促使更多的,经常的高层需要,市中心酒店住宿。城镇人口的迅速增长和随之而来的压力有限的空间大大影响了城市住宅发展。土地成本高,为了避免出现连续的城市扩张以及需要维护重要的农业生产都有助于推动住宅楼宇向上。理想情况下,在规划建设的初期阶段,整个设计团队,包括建筑师,结构工程师,服务工程师,应互相合作,在商定的结构形式,以满足功
42、能,安全性和可维护性各自的需求,并提供服务。冲突的要求之间的妥协将是不可避免的。但在所有的结构非常最高,但结构安排将服从安排和空间美学的建筑要求。两个垂直荷载抗高层建筑元素的主要类型列和墙壁,后者代理或者作为剪力墙或剪力墙作为核心组件独立。该大楼的功能将导致自然提供的墙壁围分裂和空间,和内核,以遏制和传达,如电梯服务。专栏将提供,在每单不支持的地区,否则,传输重力负荷,并在某些类型的结构,水平荷载也。不可避免的结构因素的主要功能是抵抗建筑物及其内容的重力负荷重量。由于不同的楼层负荷往往是相似的,该系统每单位楼面面积重量约不断,不论建筑物的高度。由于对降低建筑物的高度,重量面积和重力负荷的增加而
43、增加约与建筑的高度成正比。在极有可能垂直结构构件的第二个功能是抵制也是寄生风荷载和可能的地震,其震级将由国家建筑守则或风洞研究取得造成的。对这些侧向力的增加造成的建设的弯矩至少高度广场,和其效果会变得越来越重要,因为建筑物高度的增加。一旦结构功能布局已经确定,设计过程中普遍遵循明确的迭代过程。会员规模初步测算,通常根据一个任意扩充增量占风力重力负荷。的跨垂直截面面积的成员将根据其相关地区的支流与积累负荷削减,以考虑到,并非所有的楼层将同时受到其最大的活荷载的概率。最初的梁,板的尺寸通常为基础,在时刻剪一些简单的我获得需氧量重力负载分析,或从编纂中和年底跨度值。进行检查,然后做出的最高水平偏转,
44、并在主要结构构件的力量,使用一些快速近似性能分析技术。如果变形过大,或部分成员不足,调整,是为成员的大小或结构安排。如果行政长官成员吸引过度劳累,工程师可减少其刚度重新分配负载量较低强调组件。初步分析程序,检查和调整,直到满意的解决办法,得到重复。总是以建筑物的初步布局的改动需作为客户端的建设和发展的建筑师的想法。这将调用结构的修改,或者可能是激进的重新安排,因此必须对结构性的设计进行全面审查。各种初级阶段,因此可能要重复最终解决之前,多次到达。勃起速度是在获得在这样大规模的项目涉及投资回报的重要因素。大多数高层建筑都建在拥挤的城市用地,难以利用,因此仔细的规划和施工顺序组织是至关重要的。这个故事对大多数高层建筑的故事,鼓励通过反复的统一行动和预制技术建设。在高大的能力建设已经取得进展的同时更高效的设备和施工方法的改进发展手。地震断层地震的起源据我国地震台起源于软弱的飞机或在地壳断裂,称为“错误”。关于一个断层的一侧地球幻灯片或单就在地球对面横向和/或垂直,这会生成一个向各个方向传播向外震动。这构成了地震震动。这次地震深度一般起源于对故障点的地球内部的压力下产生的支路是最长的。这一点
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 栲胶干燥工个人技能考核试卷含答案
- 白酒酿造工岗前价值创造考核试卷含答案
- 固体饮料加工工岗中基础综合考核试卷含答案
- 家庭照护员跨界整合竞赛考核试卷含答案
- 气垫船驾驶员岗前理论技能考核试卷含答案
- 地毯整修工决策力能力考核试卷含答案
- 2026第三代半导体在新能源汽车领域的渗透率分析报告
- 2026金融投资行业市场现状供需分析投资策略规划分析研究报告
- 2026榫卯结构在现代实木家具中的改良应用报告
- 2026葡萄副产物高值化利用技术开发现状与趋势预测
- 中英文产品研发项目合同协议
- 项目四 直流电动机与三相交流电动机性能检测
- 《内科学》名词解释
- 辽宁省东北育才高中2025 - 2026学年度上学期高一上学期10月考语文试卷
- 人教PEP版三年级英语上册第一单元Unit 1 Making friends 单元试卷(含答案含听力原文)
- 胎盘早剥教学课件
- 农业机械化智能化发展现状下的农业人才培养模式研究报告
- CJ/T 454-2014城镇供水水量计量仪表的配备和管理通则
- 企业安全管理培训课件
- 教学能力比赛教学设计与实施-以“电子产品制作与调试”课程为例
- 正规的个人借款协议范本
评论
0/150
提交评论