1、外文资料:prestressed concrete buildingsprestressed concrete has been widely and successfully applied to building construction of all types. both precast pretensioned members and cast-tensioned structures are extensively employed, sometimes in competition with one another, most effectively in combination
2、 wit each other.prestressed concrete offers great advantages for incorporation in a total building. it is perhaps the “integrative”aspects of these, that is, structure plus other functions, which have made possible the present growth in use of prestressed concrete buildings. these advantages include
3、 the following: structural strength; structure rigidity; durability; mold ability, into desired forms and shapes; fire resistance; architectural treatment of surfaces; sound insulation; heat insulation; economy; availability, through use of local materials and labor to a high degree.most of the abov
4、e are also properties of conventionally reinforced concrete. presrressing, however, makes the structural system more effective by enabling elimination of the technical of difficulty, e.g., cracks that spoil the architectural treatment. prestressing greatly enhance the structure efficiency and econom
5、y permitting longer spans and thinner elements. above all, it gives to the architect-engineer a freedom for variation and an ability to control behavior under service conditions.although prestressed concrete construction involves essentially the same consideration and practices as for all structures
6、, a number of special points require emphasis or elaboration.the construction engineer is involved in design only to a limited extent. first, he muse be able to furnish advice to the architect and engineer on what can he done. because of his specialized knowledge of techniques relating to prestresse
7、d concrete construction, he supplies a very needed service to the architect-engineer.second, the construction engineer may be made contractually responsible for the working drawings; that is, the layout of tendons, anchorage details, etc. it is particularly important that he gives careful attention
8、to the mild steel and concrete details to ensure these are compatible with his presressing details.third, the construction engineer is concerned with temporary stresses, stresses at release, stresses in picking, handling and erection, and temporary condition prior to final completion of the structur
9、e, such as the need of propping for a composite pour.fourth, although the responsibility for design rests with the design engineer, nevertheless the construction engineer is also vitally concerned that the structure be successful form the point of view of structural integrity and service behavior. t
10、herefore he will want to look at the bearing and connection details, camber, creep, shrinkage, thermal movements, durability provisions, etc., and advise the design engineer of any deficiencies he encounters.information on new techniques and especially application of prestressing to buildings are ex
11、tensively available in the current technical literature of national and international societies. the international federation of prestressing(i.f.p)has attempted to facilitate the dissemination of this information by establishing a literature exchange service, in which the prestressing journals of s
12、ome thirty countries are regularly exchanged. in addition, an abstract is published intermittently by i.f.p the prestressed concrete institute(usa)regularly publishes a number of journals and pamphlets on techniques and applications, and procedures are set up for their dissemination to architects an
13、d engineers as well as directly to the construction engineer. it is important that he keep abreast of these national and worldwide developments, so as to be able to recommend the latest and best that is available in the art, and to encourage the engineer to make the fullest and most effective use of
14、 prestressed concrete in their buildings.with regard to working drawings, the construction engineer must endeavor to translate the design requirements into the most practicable and economical details of accomplishment, in such a way that the completed element or structure fully complies with the des
15、ign requirement; for example, the design may indicate only the center of gravity of prestressing and the effective prestress force. the working drawing will have to translate this into tendons having finite physical properties and dimensions. if the center of gravity of pre-stressing is a parabolic
16、path then, for pre-tensioning, and approximation by chords is required, with hold-down points suitably located.the computation of pre-stress losses, form transfer stress to effective stress, must reflect the actual manufacturing and construction process used, as well as thorough knowledge of the pro
17、perties of the particular aggregates and concrete mix to be employed.with post-tensioning, anchorages and their bearing plates must be laid out in their physical dimension. it is useful in the preparation of complex anchorage detail layouts to use full-scale drawings, so as to better appreciate the
18、congestion of mild steel and anchorages at the end of the member. tendons and reinforcing bars should be shown in full size rather than as dotted lines. this will permit consideration to be given as to how the concrete can be placed and consolidated.the end zone of both pre-tensioned and post-tensio
19、ned concrete members subject to high transverse or bursting stresses. these stresses are also influenced by minor concrete details, such as chamfers. provision of a grid of small bars (sometimes heavy wire mesh is used), as close to the end of a girder as possible, will help to confine and distribut
20、e the concentrated forces. closely spaced stirrups and/or tightly spaced spiral are usually needed at the end of heavily stressed members. recent tests have confirmed that closeness of spacing is much more effective than increase in the size of bars. numerous small bars, closely spaced, are thus the
21、 best solution.additional mild-steel stirrups may also be required at hold-down points to resist the shear. this is also true wherever post-tensioned tendons make sharp bends. practical consideration of concretion dictates the spacing of tendons and ducts. the general rules are that the clear spacin
22、g small be one-and-one-half times the maximum size of coarse aggregate. in the overall section, provision must be made for the vibrator stinger. thus pre-stressing tendons must either be spaced apart in the horizontal plane, or, in special cases, bundled.in the vertical plane close contact between t
23、endons is quite common. with post-tensioned ducts, however, in intimate vertical contact, careful consideration has to be given to prevent one tendon form squeezing into the adjacent duct during stressing. this depends on the size of duct and the material used for the duct. a full-scale layout of th
24、is critical cross section should be made. usually, the best solution is to increase the thickness ( and transverse strength ) of the duct, so that it will span between the supporting shoulders of concrete.as a last restort it may be necessary to stress and grout one duct before stressing the adjacen
25、t one. this is time-consuming and runs the risks of grout blockage due to leaks from one duct to the other. therefore the author recommends the use of heavier duct material, or else the respacing of the ducts. the latter, of course, may increase the prestressing force required.中文翻译: 预应力混凝土建筑预应力混凝土已经
26、广泛并成功地用于各种类型的建筑。无论预制先拉构件,还是现浇后张构件都已大量应用,在应用二者时会相互竞争,但结合应用效率更高。在预应力混凝土为一栋建筑物的总体结合提供了方便。或许正是因为其在建筑结构及其他功能结合上所起的作用,才使得预应力混凝土应用得以推广。其优点体系在下述各项;结构强度;结构港督;耐久性;可塑性,可制成所需求的方式和形状;抗火性;表面的建筑处理;隔声;绝热;经济性;可行性,可通过使用本地原料和劳动力达到较高的程度。上面大都是传统钢筋混凝土具有的特点。然而,预应力通过对建筑有破坏作用的裂缝等缺陷源的消除,而使结构系统更加有效。由于允许采用较长和较薄构件,预应力大大提高了结构的效率
27、和经济性。更重要的是,它为建筑师提供了一种变化的自由,以及在各种服务条件下的行为控制能力。尽管预应力混凝土结构在本质上有着和所有结构一样的设计考虑和操作,但应重视和推敲一下特殊点。施工工程师在设计中参与的工作是有限的。首先,他必须能够向建筑师和工程师提供可行性的建议。由于其具有预应力混凝土施工方面的专业技术知识,他将为建筑师和工程师提供非常必要的服务。其次,施工工程师应通晓施工图。例如钢筋的放置及锚定细节的等。尤为重要的是他应对钢筋和混凝土细节给予足够重视,以使其能够与预应力细节相一致。第三,施工工程师应该在结构完工之前,注重钢筋的临时应力、松弛应力、截取、加工和安装阶段的应力,以及临时条件,如复合灌注时所需的支柱支撑。第四,尽管设计任务是设计工程师的工作职责,不过施工工程师应该从结构整体及使用功能上把握结构的可行性。因此他会关注承载和连接细节、挠度、蠕变、收缩、热运动及耐久性保证等,并向设计工程师提供相应的建议。当今国内外,新技术尤其是预应力在建筑物上的应用技术,已经广泛使用。国际预应力联盟试图通过建立文化交流服务来散布这些信息,大约30多个国家的预应力杂志进行了交流。并且,该联盟还定期发布一些摘要信息。美国的“预应力混凝土结构”定期发布一些关于技术及应用的杂志和手册,同时还建立了将其传播给建筑师、工程师以及施工人员的程序。这种与国内和国际发展接轨的工作有着
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 饥饿性酮症的护理查房
- 膀胱肿物的护理课件
- 2026年停车管理服务协议
- 2026年个人眼镜旅游管理培训服务合同
- 粮食系统内控管理制度(3篇)
- 水泥企业环保奖惩管理制度(3篇)
- 矿山设备耗材管理制度(3篇)
- 特种车辆维修维护管理制度(3篇)
- 小众志愿活动策划方案(3篇)
- 电信行业市场客户行为分析
- 22《鸟的天堂》课件
- 香港大埔宏福苑火灾事件全解析:灾情、救援与安全启示
- 中国的矿产资源课件 -2025-2026学年八年级地理上册湘教版
- 停电停风、瓦斯超限停产撤人制度
- 安装水电施工合同协议书
- 政治学原理#-形考作业1-国开(ZJ)-参考资料
- 工程量清单及招标控制价编制工作方案
- 全球通VIP手机俱乐部整合推广方案
- 药学专业社会实践报告3000字
- 《地方导游基础知识》课程标准
- 中西文化鉴赏智慧树知到答案章节测试2023年郑州大学
评论
0/150
提交评论