




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Introduction to CMMVer 1.1DEFINED LEVEL 第1页/共45页RECAPITULATIONPROJECT A LEVEL 3PROJECT BPROJECT CPROJECT DORGANIZATION WIDE VIEW第2页/共45页Level 3 - Recap. Organization wide view now Process assets in use Projects learn from each other Training Peer Reviews Process stability getting strong 第3页/共45页TYPI
2、CAL CHARACTERISTICS OF A DEFINED LEVEL ORGANISATION At level 2, the focus is on projects At level 3 the emphasis shifts to the organization Best practices are gathered across the organization Processes are tailored as appropriate第4页/共45页TYPICAL CHARACTERISTICS OF A DEFINED LEVEL ORGANISATION The Org
3、anization Supports the Projects by Establishing Common processes for Engineering and Management Common measurements Training The process capability is based on a common, organisation wide understanding of the activities, roles and responsibilities.第5页/共45页KEY PROCESS AREAS Peer reviews Intergroup co
4、ordination Software product engineering Integrated software management Training program Organization process definition Organization process focus第6页/共45页 Organization Process Focus - Common Features Commitment Written organization policy for coordinating software process development and improvement
5、 across the organization. Sponsorship of Senior Management in carrying out the activities cited above. Activities are overseen by Senior Management.第7页/共45页 Organization Process Focus - Common Features Ability Group responsible for software process activity exists Adequate resources and funding Trai
6、ning to Perform the activities pertaining to process definition and improvement to the group as well as Engineering Group Measurements to determine status of activities pertaining to Process Focus第8页/共45页 Organization Process Focus - Activities Software process development and improvement activities
7、 are coordinated across the organisation. The organizations and projects activities for developing and improving their software processes are coordinated at the organization level. The use of the organizations software process database is coordinated at the organizational level.第9页/共45页 Organization
8、 Process Focus - Activities (contd.) New processes, methods, and tools in limited use in the organization are monitored, evaluated, and, where appropriate, transferred to other parts of the organization. Training for the organizations and projects software processes is coordinated across the organiz
9、ation. The groups involved in implementing the software processes are informed of activities for software process development and improvement.第10页/共45页 Organization Process Focus - Activities The Strengths and Weaknesses of the Software Processes Used Are Identified Relative to a Process Standard. T
10、he software process is assessed periodically, and action plans are developed to address the assessment findings. Organizational-level Process Development and Improvement Activities Are Planned. The organization develops and maintains a plan for its software process development and improvement activi
11、ties. 第11页/共45页Organization Process Focus - Summary SW Engg. Process group Project teams Quality assurance May be part time Process development and improvement now coordinated at the organization level第12页/共45页Organization Process Focus - Summary Process development and improvement plan New processe
12、s and tools evaluated and used elsewhere Process assessed periodically Information shared with all Training on processes given第13页/共45页 Organization Process Definition - Common Features Commitment Written organizational policy for developing and maintaining a standard software process and related pr
13、ocess assets. Ability Adequate resources and funding Training to individuals on process definition and maintenance. Measurement To determine the status of process definition activities. Verification By Quality Assurance Group through review / audit. 第14页/共45页 Organization Process Definition -Activit
14、ies A Standard Software Process For The Organisation Is Developed And Maintained. The organizations standard software process is developed and maintained according to a documented procedure. The organizations standard software process is documented according to established organization standards. De
15、scriptions of software life cycles that are approved for use by the projects are documented and maintained. Guidelines and criteria for the projects tailoring of the organizations standard software process are developed and maintained.第15页/共45页 Organization Process Definition - Activities Informatio
16、n Related To The Use Of The Organizations Standard Software Process By The Software Projects Is Collected, Reviewed, And Made Available The organizations software process database is established and maintained. A library of software process-related documentation is established and maintained.第16页/共4
17、5页Organization Process Definition Summary Org. standard software process Criteria for tailoring of OSSP Process data base established All measurement data stored here Library of process documentation is also maintained第17页/共45页 Training Program - Common Features Commitment Written organizational pol
18、icy for meeting the training needs Ability Training group exist Resources and funding Necessary skills and knowledge to perform their training activities Orientation on the training program Measurement To determine the status of the training program To determine the quality of the training program第1
19、8页/共45页 Training Program -Activities Training Activities Are Planned Each software project develops and maintains a training plan that specifies its training needs. The organizations training plan is developed and revised according to a documented procedure. The training for the organization is perf
20、ormed in accordance with the organizations training plan.第19页/共45页Training Program -Activities Training For Developing The Skills And Knowledge Needed To Perform Software Management And Technical Roles Is Provided. The training for the organization is performed in accordance with the organizations t
21、raining plan. Training courses prepared at the organization level are developed and maintained according to organization standards.第20页/共45页 Training Program -Activities Individuals In The Software Engineering Group And Software Related Groups Receive The Training Necessary To Perform The Roles. A w
22、aiver procedure for required training is established and used to determine whether individuals already possess the knowledge and skills required to perform in their designated roles. Records of training are maintained.第21页/共45页Training- Summary Training group Organization training plan Project train
23、ing plan Training imparted Materials developed according to organization standards Waiver procedure followed第22页/共45页 Integrated Software Management - Common Features Commitment Written organizational policy for planning and managing the project Ability Adequate resources and funding Training on how
24、 to tailor the organisations standard software process Training to software managers in managing the technical, administrative and personnel aspects of software project. Measurement To determine the effectiveness of the Integrated Software Management activities.第23页/共45页 Integrated Software Manageme
25、nt - Activities The Projects Defined Software Process Is A Tailored Version Of The Organisations Standard Software Process. The projects defined software process is developed by tailoring the organizations standard software process according to a documented procedure. Each projects defined software
26、process is revised according to a documented procedure. The projects software development plan, which describes the use of the projects defined software process, is developed and revised according to a documented procedure.第24页/共45页Integrated Software Management - Activities The Project Is Planned A
27、nd Managed According To The Projects Defined Softwre Process The projects software development plan, which describes the use of the projects defined software process, is developed and revised adocproc The organizations software process database is used for software planning and estimating. The size
28、of the software work products (or size of changes to the software work products) is managed adocproc The projects software effort and costs are managed adocproc第25页/共45页 Integrated Software Management - Activities The Project Is Planned And Managed According To The Projects Defined Software Process
29、The projects critical computer resources are managed adocprocThe critical dependencies and critical paths of the projects software schedule are managed adocproc The projects software risks are identified, assessed, documented, and managed adocproc Reviews of the software project are periodically per
30、formed第26页/共45页Integrated Software Management Summary Projects defined SW process developed by tailoring OSSP SW life cycles defined Waivers approved Planning and tracking done based on the Defined SW process Estimating based on process DB第27页/共45页Integrated Software Management Summary Effort, costs
31、, schedules managed Risk factors managed Risk management plan Project reviews, within team and with senior management第28页/共45页 Software Product Engineering - Common Features Commitment Written organizational policy for performing software engineering activities. Ability Adequate resources and fundin
32、g Training to members of software engineering group to perform their technical assignments. Orientation to related software engineering disciplines. Orientation in the technical aspects of the software project.第29页/共45页 Software Product Engineering - Common Features (contd) Measurement To determine
33、the functionality and quality of the software products. To determine the status of product engineering activities第30页/共45页 Software Product Engineering - Activities The Software Engineering Tasks Are Defined, Integrated, And Consistently Performed To Produce The Software. Appropriate software engine
34、ering methods and tools are integrated into the projects defined software process (DSP). Software requirements are developed, maintained, documented, and verified by analyzing the allocated requirements, ADSP.The software design is developed, maintained, documented, and verified, ADSP. The software
35、code is developed, maintained, documented, and verified, ADSP Software testing is performed , ADSP第31页/共45页 Software Product Engineering - Activities The software engineering tasks are defined, integrated, and consistently performed to produce the software. Integration testing of the software is pla
36、nned and performed, ADSP System and acceptance testing of the software are planned and performed to demonstrate that the software satisfies its requirements. The documentation that will be used to operate and maintain the software is developed and maintained, ADSP Data on defects identified in peer
37、reviews and testing are collected and analyzed, ADSP第32页/共45页 Software Product Engineering - Activities SOFTWARE WORK PRODUCTS ARE KEPT CONSISTENT WITH EACH OTHER Consistency is maintained across software work products, including the software plans, process descriptions, allocated requirements, soft
38、ware requirements, software design, code, test plans, and test procedures.第33页/共45页Software Product Engineering Summary Requirements analyzed and documented SW design to match requirements Coding to reflect design and requirements Unit / Integration / System test Defects data collected & analyze
39、d 第34页/共45页Software Product Engineering-Summary Consistency across work products Traceability matrix useful Measurements extremely important Quality of product Defect density, defect age, review effectiveness, test coverage etc.第35页/共45页Intergroup Coordination - Common Features Commitment Written or
40、ganizational policy for establishing interdisciplinary engineering teams Ability Adequate resources and funding Support tools used by different engineering groups are compatible Training on team work to all managers Orientation in processes, methods and standards used by various groups. Orientation
41、to Engineering group in working as a team. Measurements To determine the status of intergroup coordination activities.第36页/共45页 Intergroup Coordination - Activities The Customers Requirements Are Agreed To By All Affected Groups. The software engineering group and the other engineering groups partic
42、ipate with the customer and end users, as appropriate, to establish the system requirements.第37页/共45页Intergroup Coordination - Activities The Commitments Between The Engineering Groups Are Agreed To By The Affected Groups. A documented plan is used to communicate intergroup commitments and to coordi
43、nate and track the work performed. Critical dependencies between engineering groups are identified, negotiated, and tracked according to a documented procedure. Work products produced as input to other engineering groups are reviewed by representatives of the receiving groups to ensure that the work products meet their needs.第38页/共45页 Intergroup Coordination - Activities The Engineering Groups Identify, Track, And Resolve Intergroup Issues. Representatives of the projects software engineering group work with representatives of the other engineer
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 抗震性能升级中的结构拓扑优化与成本控制悖论
- 微震舒适度阈值与久坐办公场景下健康椅面结构创新研究
- 微型化高密度插头座封装工艺对电磁屏蔽效能的影响量化分析
- 循环经济视角下刀片冲孔机金属边角料分级回收与再制造技术
- 循环经济模式下劈刀总成可回收材料分级分类标准缺失
- 异构材料焊接界面结合强度预测模型在交直流双模式切换中的失效归因研究
- 市场供需结构性矛盾下产业链价值分配模型构建
- 本册综合教学设计-2025-2026学年小学信息技术(信息科技)第二册(2016)电子工业版(安徽)
- 《4给物体分类》(教学设计)教科版一年级下册科学
- 2025年6月福建省泉州中考模拟数学试题【附答案】
- 二年级上册《树之歌》优秀课件
- 锅炉安全技术规程
- 初中音乐《快乐的女战士》《水草舞》课件
- 战现场急救技术教案
- 易制毒化学品岗位责任制度
- 气力输送计算
- 新人教版小学美术五年级上册教学设计(全册)
- 公共关系学授课教案
- 《中国导演简介》PPT课件
- 5米深沟槽开挖安全施工方案
- 光伏幕墙施工工法
评论
0/150
提交评论