1、12 安全第一安全第一 预防为主预防为主Safety first, precaution crucial3 Safety first, precaution crucial Safety is forever topics for Power production. Safety came from alarm, accident came from careless. Work ingeniously brought safety, act rashly brought disaster.Stupid man gains lessons by blood, wise man avoid ac
2、cident through lessons.45 1. 1.不不伤害自己伤害自己Dont hurt yourself 2.2.不不伤害别人伤害别人Dont hurt others 3.3.不被不被别人伤害别人伤害Dont be hurted by others 6Analyze the reason of accident1.事故原因不清楚不放过;It can not be let pass if the reason of the accident is unclear.2.事故责任者和应受教育者没受到教育不放过;It can not be let pass if the responsi
3、ble person and messes of the accident obtain no lessons3.没有采取防范措施不放过; It cannot be let pass if the preventive measures are not taken4.事故责任者没有受到处罚不放过.it cannot be let passed if the responsible person is not punishedSafety Work process of State Gird Corporation (变电站和发电厂电气部分)Electrical part of Transfor
4、mer substation and power plant8Basic requirement for the work of high voltage equipment 2.1.3 无论高压设备是否带电,工作人员不得单独移开或越过遮拦进行工作;若有必要移开时,应有监护人在场,并符合表2-1的安全距离.The worker can not remove or step over the guardrail whether the high voltage equipment energized or not. If need to remove the guardrail, the cus
5、todian should be on site, and in accordance with the safety operating distance.表2-1 设备不停电时的安全距离Safety operating distance with energized equipment电压等级Voltage Class (kV) 10及 以下20,3563,66110220 330 500安全距离Distance (m)0.71.001.503.00 4.005.009Basic requirement for the work of high voltage equipment2.1.4
6、 10、20、35kV配电装置的裸露部分在跨越人行过道或作业区时、若导电部分对地高度分别小于2.7、2.8、2.9m,该裸露部分两侧和底部须装设护网。 When the unprotected part of the energized equipment of 10,20,35Kv is across the pedestrian crossing or work area, there should have protective screen around the unprotected part, if the height of conductive part is lower th
7、an 2.7, 2.8, 2,9m, 10Basic requirement for the work of high voltage equipment2.1.5 户外35kV及以上高压配电装置场所的行车通道上、应根据表2-2设置行车安全限高标志.There should be height limit mark on the truck where there was distribution device of 35Kv and above .表2-2 车辆(包括装载物)外廓至无遮拦带电部分之间的安全距离.The safety distance between the edge of t
8、ruck (including the cargos on the truck) and the unprotected conductive part.电压等级Voltage class (kV)3563(66)110220330500安全距离Safety distance (m)1.151.401.65(1.75)2.553.254.5511Organizational rules for keeping safety3.1电气设备上安全工作的组织措施Rules for safety work on electrical equipment3.1.1工作票制度;Working permit
9、ting card system3.1.2工作许可制度;Work license system3.1.3工作监护制度;Work monitoring system3.1.4工作间断、转移和终结制度。Work interruption, transmission and ending system12Technical rules for keeping the safety4.1电气设备上安全工作的技术措施Technical rules for safety operation of electrical equipment4.1.1停电Cut off the power4.1.2验电Volt
10、age testing4.1.3接地Grounding4.1.4悬挂标示牌和装设遮拦(围栏) suspend the signboard and set up the guardrail 13Technical rules for keeping the safety4.2.1工作地点应停电的设备如下:The following equipment on site should be powered off:4.2.1.2与工作人员在进行工作中正常活动范围的距离小于表4-14-1规定的设备。The equipment within the area mentioned in form 4-1.
11、表4-1 工作人员工作中正常活动范围与带电设备的安全距离 the safety distance between the energized equipment and the workers activity area.电压等级Voltage class (kV)10及以下20.3563110220330500安全距离Safety distance (m)0.350.601.50 3.00 4.005.0014works on power cable5.1电力电缆工作的基本要求Basic requirement for works on cable 1.办理工作票履行工作许可手续; Issu
12、e the work permit 2.核对电缆名称,标志牌; Check the cable name and signboard 3.核对检查安全措施正确可靠; Check whether the safety device was correct and reliable.15works on power cable5.2.电缆施工的安全措施:Safety measures for the cable construction 1.锯电缆前应核对图纸并用专用仪器确切证实电缆无电后,用接地的带绝缘柄的铁钎钉入电缆线芯后,方可工作.Check the drawing and test the
13、 cable with professional device to make sure its no power before cutting the cable. Grounding the cable by stick in one steel rod with insulated handle before start the work. 2.进入隧道应有充足的照明,并有防火,防水通风的措施;Sufficient light should be provided in the cable tunnel, and the measurement for fire safety, wate
14、r proof and ventilation should be taken in the tunnel.3.使用携带型火炉或喷灯时,火焰与带电部分的距离:10kV及以下者不得小于1.5m;10kV以上者不得小于3m.The safety distance between the electrified part and flame: 10kV and below class should be 1.5m at least; 10kV and above class should be 3m at least. 1617works on power cable5.2.2 电力电缆线路试验安全
15、措施Safety rules of testing the cable line1.电缆耐压试验前,加压端做好安全措施,防止误入试验场所.另一端挂警告牌或派人看守.Before apply HV test to the cable, carefully prepare the safety procedure on the energizing side to protect someone uninvolved from entering into the test site. Hanging the warning plate or arrange someone to guard on
16、the other side.2.试验过程中,更换试验引线时,应充分放电,并戴绝缘手套;During the testing, the cable should be fully discharged before change the test lead. And the operator should wear the insulating glooves.3.电缆耐压试验分相进行时,另两相应接地; When test one phase, the other two phases must be earthed.4.电缆试验结束,应对被试电缆充分放电.lThe tested cable
17、should be fully discharged after the testing is finished.1819General safety rules6.1 凡离地面(坠落高度基准面)2m及以上的地点进行的工作,应视作高处作业.lIf the work platform is more than 2(include) meters high, it should be considered working in the highly situation.6.2 高处作业应使用安全带(绳),安全带(绳)使用前应进行检查,并定期进行试验.-在没有脚手架或没有栏杆的脚手架上工作,高度超过1.5m时,应使用安全带或采取其他可靠的安全措施.If working in the height , safety belt must be used and being checked before working. The belt should be tested at regular intervals. When work higher than 1.5m without
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 大干四季度活动方案
- 大型电玩城开业活动方案
- 太康超市推销活动方案
- 大学生应急演练活动方案
- 大公司周年庆典活动方案
- 夜宵清吧活动方案
- 增产创效活动方案
- 在线直播活动方案
- 夏日团建室内活动方案
- 大班中秋居家活动方案
- 肢体离断伤的护理
- 浙江省强基联盟学考模拟2024-2025学年高二下学期6月学考模拟地理试题(含答案)
- 中国美术学院非教学岗位招聘笔试真题2024
- JIS G4305-2021 冷轧不锈钢板材、薄板材和带材
- 危险化学品临界量表(参考)
- 墙柱梁板混凝土同时浇筑方案.doc
- 新生儿视觉训练黑白卡(整理90张必备图卡)
- 矿山地质环境恢复治理方案治理经费估算计算部分
- 大学遗传学期末考试题库及答案参考
- 艺术设计专业“职场化”工作室制实践教学模式论文
- 工程机械销售基本知识.ppt
评论
0/150
提交评论