1、1.1.1.1 终沉池 Sedimentation Tank平面尺寸为 50m的圆池,地上2.24m,地下2.767.26m,拟采用 无粘结预应力结构,壁板硅标号为 C40,用400mm的沉管灌注桩 抗浮,由于场地开阔且基底下为-1层粉质粘土,基坑可按一定的坡 度进行放坡开挖,但基底已接近层土,该层为细砂,含水量丰富, 渗水性强,且具承压性,施工时务必采取可靠的降水措施,谨防产生 涌砂现象。The plane diameter is about 50m, the upground part is 2.24m and the underground part is 2.76m 7.26m. We

2、 plan to select concrete tank structure prestressed with unbonded tendons. The concrete class is C40. We plan to select 400 pile foundation to preventfrom flotage. The field is plane and the subgrade is layer -1 (powder-clay, so the earthwork can be dug according to a certain slope. However, the bot

3、tom of tanks is closed to soil layer (silver sand, the layer has abundant groundwater, the infiltration coefficient k of soil is big and the groundwater received pressure, so reliable measures must be adopt while digging.1.1.1.3 消化池 Digestion Tank消化池有2组、平面直径约20m,地上部分28m,地下部分5m。计 划采用无粘法预应力水池结构。拟采用中80

4、0桩基础。桩基础施工和土方开挖时必须注意地下水且采取可靠措施。The digestion tanks have 2 groups. The plane diameter is about 20m, the upground part is 28m and the undergroud part is 5m. We plan to select 800 pile foundation. Much attention must be paid to groundwater and reliable measures must be selected during constructing pile

5、 foundation and digging.1.1.1.4 粗格栅及进水泵房 Coarse Screen And Raw Sewage Pumping Station平面尺寸约25m*35m ,此构筑物分为三部分:粗格栅,进水提升泵 池,设备机房。粗格栅,进水提升泵池为地下式水池,深约8米,钢筋硅结构。在粗格栅与进水提升泵池间设伸缩缝一道。设备机房(9m*32m为钢筋硅框架结构,筏板基础。构筑物自重可以满足抗浮要 求,构筑物主要以-1层粉质粘土为持力层。基坑采用放坡开挖,并 应采取有效降水措施。The plane dimension is about 25m*35m,the buildin

6、g is made up of three parts: coarse screen and raw sewage pumping station are underground tanks, the depth is about 8.0m, and it is reinforced concrete structure. A stretching slot is set between the coarse screen and the raw sewage pumping station. Reinforced concrete structure and raft plate found

7、ation are adopted in the equipment house. The building ' s deadweight can counteract the flotage. The subgrade is layer -1 (powder-clay, the foundation pit can be scooped according to a certain degree of slope and measures must be taken to reduce the level of groundwater.7.7.5 防腐措施Method Of Anti

8、-Corrosion地勘报告提示地下水对硅具弱腐蚀性,依据工业建筑防腐设计规范将采取降低 水灰比,加大受力钢筋保护层厚度,埋入土中的墙柱,池体表面涂刷防护材料等一系列措施。Subgrade survey report said: the groundwater is a bit caustic to concrete. According to the code, We plan to reduce the ratio of water/cement of concrete, enlarge the protective thickness of the main bars of concre

9、te structure and painting to prenvent from corrosion,etc.7.7.6 抗震设计Seismic Design建、构筑物均按设防烈度为六度进行设计。并采取相应的 构造措施。According to the code for seismic design of buildings all the buildings Seismic fortification intensity is 6 degree and corresponding measure are taken.7.8电气设计Electrical Design7.8.1 设计依据及设

10、计范围Criteria And Design Range本工程主要依据以下内容进行设计:The criteria of the electrical design for this project are as follows:7.8.1.1 与本工程有关的设计规范和设计标准RequirementChinese Design Codes7.8.1.2 业主要求(详见会议纪要)The Requirement OfEmployer(Meeting Minute7.8.1.3 工艺提供的设计资料 Data From Mechanical Engineer本工程设计范围包括污水厂全部的动力及照明设计。

11、10kV供电线路不在本设计范围之内。The electrical design includes all power and illumination for whole wastewater plant. The 10kV power source line is excluded.7.8.2 负荷等级及供电电源Load Class And Power Source根据污水处理工艺的要求和大中城市污水处理厂的重要性,本工程 用电负荷确定为二级负荷The load class of the project is class 2 according to the process requirem

12、ent and importance of the project.拟采用两路10KV电源供电,两路电源分别引自江纺变电站和高新 变电站。Power source are from Jiangfang transformer station and Gaoxin transformer station respectively.7.8.3 用电负荷Load本工程全部用电设备的电压等级均为 AC220V/380V。总装机容量 4302KW,使用容量4102KW。计算负荷3213KW。经无功功率补偿后 视在功率3448KVA。The rated voltage of all loads shall

13、 be AC220V/380V. The total equipment capacity is 4302KW, the operation capacity is 4102KW, and the calculated power is 3213KW. After reactive compensation, the apparent power is 3448KVA.7.8.4 变配电系统设计The Transformer And Distribution System Design根据全厂总图布置和工艺处理区域的划分,拟建四座10KV/0.4KV变电站:Totally four trans

14、former stations should be built according to the general layout and process function partitions.1#变电站设在进水泵站附近,作为全厂10KV配电中心,同时负责污水机械预处理区设备和一部分生化区设备的供电及控制。1# transformer station shall be located near the saw sewage pumping station. It is not only the 10KV power distribution center but also responsible

15、 for the power distribution and motor control for whole mechanical pre-treatment section and part of the biological treatment section.2#变电站设在氧化沟与沉淀池之间,负责生化处理区设备的供电 及控制。2# transformer station shall be located between oxidation ditch and sedimentation tank. It is responsible for the power distribution

16、 and motor control for the rest part of the biological treatment section.3#变电站毗邻污泥脱水机房,负责污泥处理区设备的供电及控 制。td多媒体学情简析对旅游已经有所了解,知识的掌握能力也更强了教学过程 (内容不能少于150个字)教学环节教学内容教师活动学生活动导入晓东发现周围的环境发生了变化,让我们和 晓东一起来观察一下,他的周围究竟发生了 怎样的变化?这样的变化对我们的生活有什 么影响呢?根据教材的导入案例,让学生对其分析,并对以下问题进行讨论:1、还有哪些更加新颖的旅游方式会出现?2、与往年相比,本地人的吃、穿、行

17、、用方 面有什么变化?3、如果你所在的是旅游地区,游客的旅游 消费有什么变化?现在,假期更多了,对当地人的出游会产生什么影响?分析教材中的导入案例,根据问题让学生 以小组的形式展开讨论,同时教师启发学生在讨论中思考相关的学习内容新授旅游业随着社会经济的发展、人们生活平的 提高、闲暇时间的增多而发展,这是一个经 济社会发展的必然过程。21世纪将是旅游业 的第二个黄金时代,旅游者将达到空前的规 模,旅游业将发展成为世界最大的产业。那我们一起来看看国际旅游业都会有哪些发 展趋势呢?一、国际旅游更加方便、快捷和舒适1、欧美国家凭一张电子旅游磁卡即可进行 全球性无票国际旅游。2、第二代喷气式飞机的广泛应

18、用、空中客 车的问世、新型的最高时速可达 500公里 以上的磁悬浮铁路列车的研制及问世、高 速公路网络的完善,甚至地中海和加勒比 海等主要游船基地的建设,都为旅游者提 供了极大的方便,使旅游活动安全、快 捷。3、随着旅游宣传机构设置的日渐完善、现 代科技水平的不断提高、信息网络的建 立、电子音像技术的先进化,利用报刊、 电台、影视、广告、博览会和交易会等各 种形式和手段的旅游宣传给旅游者提供了极大的方便,尤其是远距离的国际旅游活 动更从中受益。那么,旅游活动的方式会产生什么样的变 化呢?二、旅游活动的方式日趋多样化、个性化和文化化1、多样化方面2、个性化方面3、文化化方面知识拓展在旅游业竞争中,文化竞争是最高层的。旅 游本身的文化功能是内在的,旅游企业是生 产文化、经营文化和销售文化的企业,旅游 者进行旅游,本质上也是购买文化、消费文 化、享受文化的过程。因此,在旅游业的发 展过程中,将会更加注重旅游项目的文化内 涵、更加注重旅游的文化形式、更加注重旅 游过程的文化性和更加注重旅游细节的文化 性。提问:你觉得作为国际旅游者,未来大家的旅游方向会趋向哪里呢?三、国际旅游者的流向继续向亚洲及太平洋地区转移1、人类意识的发展2、精神需求的提高3、经济条件的成熟教师讲解课件展示教师讲解课件展示教师讲解课件展示教师做简单介绍教师讲解课件展示学生思考学生思考学生思考学生阅读小结21世纪将是旅

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论