1、Supplier Performance Development ProcessTask 15 PPAP20-Sep-991Task Description Production Part Approval Process (PPAP) Production parts are manufactured at the production site using production tooling, gaging, equipment, operators, etc Parts from production run are analyzed Test results and records
2、from APQP are submitted with Part Submission Warrant20-Sep-992PurposeFor the supplier to demonstrateall design records and specification requirements are properly understoodthe process has the capability to produce product that meets requirements20-Sep-993SomethingChanged Application AIAG PPAP manua
3、l defines when PPAP submission is required New part Correction to discrepancy in previous submission Design or process change Change in source of subcontracted materials or services transfer or rearrangement of tooling & equipment20-Sep-994Methodology Buyer enters PPAP submission date on purchas
4、e order Approver determines submission level default level 3 default level 4 for raw material Supplier submits PPAP PPAPALL.xls electronic submission recommended Approver evaluates PPAP package Level 5 at supplier site Approver determine part submission status Notify supplier and manufacturing of st
5、atus20-Sep-995 DFMEA Control Plan Early Production Containment Plan (Pre-Launch Control Plan) Process capability studies Gage Measurement System Analysis Lab Accreditation & scope Restricted & Reportable Materials form Interim Worksheet, if requiredSupplier Data Received Warrant Appearance A
6、pproval Report (AAR), as required Sample Parts Print/Design Record Engineering Change Documents Check fixtures/aids Process Flow Diagram PFMEA20-Sep-996PPAP Review Checklist Delphi checklist to assist with evaluation of PPAP package Action plan created with use of checklist20-Sep-997Flow Chart Linka
7、ge of Product Characteristics from DFMEA to Operational Steps Operation numbers consistent with PFMEA, Control Plan, Operator Instructions Ensure identification of inspection and rework Use A-6 Process Flow Chart checklist in APQP manual to evaluate20-Sep-998PFMEA Linkage with DFMEA, Process Flow, C
8、ontrol Plan, Operator Instructions, etc Degree to which high RPNs are addressed with preventive strategies Action Plans assigned, implemented, effectiveness assessed and RPN recalculated Use A-7 Process FMEA checklist in APQP manualRPN = 50420-Sep-999DFMEA Assess feasibility, risk, design intent iss
9、ues Confirm manufacturing process capability considered Focus on Critical Characteristics Lessons Learned incorporated Use A-1 Design FMEA checklist in APQP manual to evaluate20-Sep-9910Control Plan Ensure Control Plan is aligned to, and correlates with, DFMEA, Process Flow, PFMEA Control Methods ap
10、propriate to variation type(s) Incorporates Lessons Learned, Statistical Data Use A-8 Control Plan checklist in APQP manual to evaluate20-Sep-9911Pre-Launch Control PlanEarly Production Containment requirementsAdditional controls included for proper duration or quantityPFMEA and statistical data use
11、d to determine what additional controls necessary short term capability long term capability on similar process20-Sep-9912Process Capability StudiesCapabilityInterpretationConclusionPpk 1.67Process probablymeets customerrequirementsCurrent control plansufficient1.33Ppk1.33achievedPpk1.33achieved20-S
12、ep-9913MSA Studies Measurement uncertainty determined Gage R&R, Bias, Stability, and Linearity Gage R & R acceptance guidelines30% unacceptable, measuring system needs improvement Verify study performed correctly20-Sep-9914Part Submission Status Full Production Approval Interim Approval Auth
13、orize shipment to Delphi without Full Production Approval Corrective Action Plan is required Rejected Corrected submission required before production quantities may be shipped20-Sep-9915Interim Part Class parts from production tooling and meet specs, not all PPAP requirements have been met parts fro
14、m production tooling and require rework to meet specs parts not from production tooling, parts meet specs parts do not meet specs parts do not meet specs and vehicles with class E parts require retrofit to make them saleable20-Sep-9916Summary AIAG PPAP manual defines requirements APQP Product and Process Validation Supplier submits PPAP to proper level PPAP package evaluated and status determined Supplier and Delphi manufacturing site not
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 急救设备操作与维护护理
- 中职护理护理技术操作规范
- 人工智能助力护理质量提升
- 崇义中学高二下学期第二次月考物理试题
- 2025年并购重组承销补充协议
- 2025年搬家服务合同协议
- 2025年AI煤矿安全监测系统中传感器漂移实时校正
- 破阵子·为陈同甫赋壮词以寄之 课件 2025-2026学年语文九年级下册统编版
- 疫情防控宣传试题及答案
- 2026 年中职酒店管理(酒店基础)试题及答案
- 纺织业账务知识培训课件
- 1688采购合同范本
- 购买铁精粉居间合同范本
- GB/T 29730-2025冷热水用分集水器
- 污水厂安全知识培训
- (2025年标准)存单转让协议书
- 医学科研诚信专项培训
- 电力通信培训课件
- 第五版FMEA控制程序文件编制
- 药物致癌性试验必要性指导原则
- 软骨肉瘤护理查房
评论
0/150
提交评论