版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、H E A R T O F H I G H T E C HstructionsOperating Instructions forPumpsTransfer Pumps Series:51, 76, 101, 151, 251, 351, 451, 551FA/ZK.,FA/M.te:18.07.2003Issue date:18Version: 1checked: Author: KingContents1.General.31.1.Use .31.2.Product information.31.3.Pump data .31.4.Overseas Offi ces.42.Safety.5
2、2.1.Labelling of Instructions in the Operating Manual.52.2.Staff qualifi cation and training.52.3.Dangers from non-compliance with safety instructions .52.4.Safety-conscious work.52.5.Safety instructions for the operator.52.6.Safety instructions for maintenance, inspection and assembly work.62.7.Una
3、uthorised conversions and spare parts manufacturer.62.8.Improper modes of Operation.63.Transport and interim storage.73.1.Shipping pumps and protection measures .73.2.Transport .73.3.Interim storage.73.4.Conservation for storage after operation.74.Description of the pump.84.1.Principle of the gear p
4、ump.84.2.Construction design of feed pumps.84.2.1.Basic design .84.2.2.Flow directions .84.2.3.Sealing variants and shaft bearings .94.3.Dimensions.95.Installation.105.1.Data regarding operating location.105.2.Fitting tools .105.3.New set up.105.3.1.Checks before set up starts .105.3.2.Motor mountin
5、g on fl ange pump (ZK version .105.3.3.Set up the motor pump .115.3.4.Electrical connections .125.3.5.Connecting lines .126.Commissioning / Decommissioning.146.1.Preparation for operation.146.2.Initial start-up.146.3.Re-start-up after dry run .146.4.Monitoring.146.5.Decommissioning .156.6.Removal fr
6、om system.157.Maintenance.167.1.Preparation.167.2.Coupling.167.2.1.BOWEX junior M .167.2.2.Rotex - Coupling Rotex - Coup .178.tions, causes and rectifi cation Malfunctions,.189.arts list Spare parts li (19Clearance Certifi cate (21mity with the Provisions of Directive 94/9/EC (ATEX 95Declaration of
7、Conformity w .22ation of Conformity with the Provisions of Directive 98/37/EC (Machinery directiveManufacturers declaration .23Declaration of Conformity w Declaration of Conformity with the Provisions of Directive 98/37/EC (Machinery directivemity with the Provisions of Directive 98/37/EC (Machinery
8、 directiveon of Conformity w H I on of Conformity with the Provisions of Directive 98/37/EC (Machinery directiveG .C H24H E A R T O F H T EH I G C H1.GeneralThis operating manual contains basic information for the pumps specified in Section 1.3, which must be complied with during installation, opera
9、tion and maintenance. It is therefore essential that this operating manual is read prior to installation and commissioning by the fitters and the responsible technicians/ operators, and must always be available at the operating location of the machine.1.1.UseThe 51 - 550 series gear pumps described
10、in these operating manual, henceforth called Feed pumps“ or Pumps“, are only suitable for conveying lubricating liquids that do not have a cor-rosive effect on the pump materials used (Section 1.3. Any liquid to be pumped is hereinafter referred to simply as the “me-dium”.If you require further info
11、rmation that is beyond the scope of this operating manual, please contact Scherzinger Pump Technolo-gy. If you require help, please specify precisely the pump type and series number for which you require the information. The pump type (Typ, year of manufacture (Bj and serial number (Nr. can be found
12、 on the name plate (example, see Figure .Product informationThis operating manual applies to the sizes of type 51, 76, 101, 151, 251, 351, 451 and 551 with pump mount and coupling or with pump mount, coupling and motor from June 2003 onwards, manufactured by Ernst Scherzinger GmbH & Co KG
13、, 78120 Furtwangen, Germany.The pumps are numbered consecutively. The number index (serial numbers starts at zero each year.The title page of this operating manual displays the issue date and the operating manual edition.The motor pumps described in this operating manual conform to the applicable EC
14、 standards and are permitted to bear the CE mark.1.3.Pump dataMax. differential pressure increase 30 barMax. system pressure (suction side 0,3 bar (with a radial shaft sealing ringMax. suction negative pressure -0,3 bar (with a radial shaft sealing ring-0,8 bar (with a BASL radial shaft sealing ring
15、Size 51, 76-0,8 bar (with two radial shaft sealing ringsSize 101, 151, 251, 351, 451, 551Flow rate at 1400 1/minSize 51 2,8 l /min 50mm²/s and 2 bar excess pressureSize 76 3,7 l /min Size 101 5,2 l /min Size 151 7,6 l /min Size 251 16 l /min Size 351 26 l /min Size 451 43 l /minSize55169 l /min
16、edium temperatures Max. medium-20 to +80°C (sealant material NBR -20 to +80°C (sealant material FPM -20 to +80°C (sealant material PTFE -20 to +60°C (sealant material EPDMy range Viscosity rang 2 to 3000 mm 2/s ange Speed range H E A R T O F H T E0 to 2000 RPM2000138200351 FA/ M0
17、,25 /EXD Figure 1.1H E A2.SafetyComply with the general safety instructions listed in this Safety section and also with the special safety instructions listed under the other main sections.2.1.Labelling of Instructions in the Operating ManualThe safety instructions listed in this operating manual wh
18、ich, if not complied with, can cause danger, are specially labelled byNon-compliance poses danger for persons. Non-compliance poses danger of electrical shock.These instructions must be complied with in full for explosion-protection.Non-compliance poses a risk to the machinesThe name plate mounted o
19、n the pump must be complied with and be maintained in a clearly readable condition.2.2.Staff qualification and trainingThe operational, maintenance, inspection and assembly staff must evidence the appropriate qualifica-tions for these works. Areas of responsibility, competencies and monitoring of th
20、e staff must be pre-cisely regulated by the operator. If the personnel do not have the necessary knowledge, they must be trained and instructed accordingly. This can be implemented, if necessary, by the manufacturer / sup-plier on behalf of the machine operator. In addition, the operator must ensure
21、 that the content of this operating manual is fully understood by the personnel.2.3.Dangers from non-compliance with safety instructionsNon-compliance with safety instructions can pose a danger not just to personnel, but also to the envi-ronment and machinery. Non-compliance with the safety instruct
22、ions can lead to the loss of all claims for compensation.In detail, non-compliance can cause the following dangers (examples:Failure of important machine/system functionsFailure of prescribed methods for maintenance and servicingDanger to persons from electrical, mechanical and chemical effects Dang
23、er to the environment from escaping hazardous substances2.4.Safety-conscious workThe safety instructions listed in this operating manual, the applicable national regulations for accident prevents and all internal working, operating and safety regulations of the operator must be complied with.2.5. in
24、structions for the operatorSafety instr hot or cold machine parts pose any danger, these parts must be protected on site against con-If hot or tact. aks (e.g. from the shaft seal of dangerous conveyed goods (e.g. explosive, toxic, hot must be Leaks (ided away in such a manner that no danger is prese
25、nt for persons and the environment. Legal guided quirements must be complied with.requirem requirements must be complied with. anger posed by electrical energy must be excluded (for details, refer to e.g. the regulations of Danger H I G C HDanger posed by electrical energy must be excluded (for deta
26、ils, refer to e.g. the regulations of VDE and the local utility companies.the VD e VDE and the local utility companies.the VDE the VDE and the local utility companies.H E A R T O F H T E WARNING!H E AH E AFigure 4.2Sense of rotaf rotation right (CW,Suction sideside left,e side rightPressure sideH E
27、A C HDesign . FA(R/M . Design . FBL/M .Figure 4.4 Figure 4.5Sense of rotation right (CW, Sense of rotation left (CCW,Suction side left, Suction side right,Pressure side right Pressure side leftOperating the pump against the specified rotation/flow directions is not the intended use. The followingmal
28、functions can be expectedThe pump discharges the pipe system and runs dryThe shaft seal is subject to pressure and the pump will leak.The radial shaft sealing ring will be pressed out of the housing and against the coupling where it will heat up strongly due to friction warmth.4.2.3.Sealing variants
29、 and shaft bearingsThe drive shaft is sealed to the outside by radial shaft sealing rings. A basic function radial shaftsealing ring is fitted in the normal models (Figure 4.6. An improved seal is provided for special opera-ting conditions (e.g. suction height > 3 m, higher media viscosity or inp
30、ut pressure up to 0.8 bar by adouble-lipped sealing ring or two radial shaft sealing rings mounted against each other (Figure 4.7:. Inthis case, the space between the seal lips is filled with grease suitable for the application.An dry running test for the internal radial shaft sealing rings as per D
31、IN EN 13463-5, Section 4.6.3,Appendix B, is not required as the lubricant cannot be topped up. The seals are constantly lubricatedby the medium. Dry running must be avoided (see Section 6.2.The outer radial shaft sealing ring (as shown in Figure 4.7 only transfers 5W into the pump shaft inextreme ca
32、ses during unlubricated operation. This temperature rise is discharged via the shaft to themedium and the environment. The temperature rise is significantly less than the temperature risecaused by frictional losses in the bearings and medium. A critical temperature rise is therefore not to beexpecte
33、d.Figure 4.6Figure 4.74.3.sionsDimensionsant pump dimensions can be found in the data sheets.All relevant p H I GAll relevant pump dimensions can be found in the data sheets.H E A R T O F H T E1: BoWex Figure 5.1: BoWH E ABoWex ®Size Shaft OD mmLocking threadmmDimensions mmd 1D 1G 1t 1T ANmD H
34、l 1; l 2E M ; N L L H 14Ø1025M561,4402346,55037Ø12, Ø142619Ø1630M561,4482548,5543724Ø1836M561,4522647,55641Table 5.1 Figure 5.2: Rotex - CouplingRO-TEX ®Size Dimensions mmShaft OD d (min.max.GeneralLocking-thread L l 1; l 2E b s D H d H D N G t 190 - 25662516122401840-M
35、510240 - 35783018142552755-M510280 - 40903520152,5653065-M815Table 5.2Mounting the coupling:Push the hub onto the drive shaft.Set the E-dimension by axially moving the hub on the drive shaft.Secure the hub by tightening the threaded rod DIN 916 with a cup point.Ensure, when mounting, that the E-dime
36、nsion (see Table 5.1 and Table 5.2 is maintained so that the coupling sleeve remains axially movable in operation.Ensure that sufficient distance is retained axially to the fixed components of the pump and motor. We recommend a minimum distance of 5 mm.Screws and threaded rods used to hold the hub m
37、ust be additionally secured against self-loosening, e.g. by bonding with Loctite (medium strength.When mounting the motor, insulating elements must not be inserted between the pump mount and the motor. The connection screws between the pump and motor must be made of electrically conductive material
38、(e.g. steel.material (e.g.5.3.3.he motor pumpSet up the m or pump is screwed onto the motor mount. The installation location must be level. Unevenness The motor pu ea of the screwing points must be compensated for with suitable shims so that a level plane in the area of ed above these four support p
39、oints (Figure 5.3. If you do not align the pump, this can cause is created ab that could damage the pump or motor, or at the least affect the function. The screws should stresses that ened only once the machine is aligned (uniformly in diagonally opposite sequence.be tightened be tightened only once
40、 the machine is aligned (uniformly in diagonally opposite sequence. stall a motor pump in a small installation location without sufficient ventilation as the motor will Never install H I G C HNever install a motor pump in a small installation location without sufficient ventilation as the motor will
41、 H E A R T O F H T E y cooled and can overheat.be poorly coo WARNING HThe motor pump may only be installed vertically with the pump head point down after consultation with the manufacturer. Otherwise the shaft seals may fail rapidly. This rapid failure can be avoided with special construction measures.1 2Figure 5.3The four mounting screws to attach the
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 染色体非整倍体无创筛查的技术瓶颈与突破方向
- 顺产产程的观察及处理
- 临夏健康管理师2025年测试试卷
- 极端低温医疗保温物资保障方案
- 高中2025责任感培养说课稿
- 医学26年老年心血管疾病义诊活动筹备查房课件
- 初中心理健康教育教案2025年沟通技巧设计
- 第20课 新文化运动与马克思主义的传播说课稿2025学年高中历史华东师大版上海第五分册-华东师大版上海2007
- 初中竞赛基础说课稿2025
- 上海工程技术大学《安全生产事故案例分析技术》2025-2026学年第一学期期末试卷(A卷)
- 七年级语文上册《古代诗歌四首》理解性默写与训练
- T/GXAS 830-2024经桡动脉穿刺介入诊疗患者术肢管理规范
- T/CADBM 8-2018建筑用冷热水输送不锈钢波纹软管及管件
- 【公开课】生活中的轴对称+课件+2024-2025学年+华东师大版(2024)七年级数学下册
- 生命教育与心理健康教育的融合路径研究
- 2025年武汉铁路局集团有限公司招聘笔试参考题库含答案解析
- DB33 1121-2016 民用建筑电动汽车充电设施配置与设计规范
- 铁塔加固改造合同
- 《商务经济学》教学大纲
- 火灾现场触电应急处理方案
- 2023年广州市黄埔区中医医院招聘笔试真题
评论
0/150
提交评论