1、越南汪秘1 X 330MW机组Viet nam Uong Bl X 330MW Unit锅炉启动操作票OPERATING PERMIT SHEET FOR BOILER START-UP编号No发令人 Commander.受令人 Receiver : .操作人 Operator : .监护人 Supervisor : .起始 Start 年 Year月 Month日 Date时 Hour分 Minute终止 End年 Year月 Month日 Date时 Hour分 Minute班 Name of shift别Shift班Shift班Shift班Shift班人员职捌Operator state
2、、发令人Comma nder监护人Supervisor操作人Operator交班日日日日时间Ha nd时时时时over time分分分分DayDayDayDayHourHourHourHourMi nuteMi nuteMi nuteMi nute操作票使用说明The application notes for this operation sheet1每项操作完毕,由监护人在“执行”栏上打“七”具体操作人则在“操作人”栏签名。After the operation for each item is finished, the aVin the execution” blank should
3、be ticked by the supervisor and the concrete operator should sign in the operator" blank.2如遇到某项操作本次不需要操作时,由监护人在“执行”栏上打“一"记号。If one item does not need to be operated, the supervisor should tick “ ” in the execution blank.3在操作过程中,遇到特殊情况及异常,则记录在备注栏内。During the operation, if there is special c
4、ondition or abnormality, take down on the remark blank.4其它操作及注意事项按规程执行。Other operation and notices should be executed according to the stipulations.锅炉启动操作票Boiler startup operati on sheet序 号No.操作内容Operation contents执行 时间Executed time执行情况Executing condition操作人Operator一、启动前的检查A. The inspection before s
5、tart upi接值长指令后,受令人(班长)组织所属班员作好操 作分工;准备好操作所需工器具。After receiving the order form the shift engineer, the receiver (forema n) should orga nize his staffs to assig n the work and prepare all the n eeded apparatus and tools.2检查所有检修工作全部结束,工作票已全部注销并收 回,一切安全措施拆除,现场清理干净,设备管道保 温完整,道路畅通,照明良好。Check all the overh
6、aul had been finished, the working permit sheet had been canceled, all the safety measures had been dismantled, the site had been clear, the insulation for the piping is completed, the road is not impeded and the lighti ng is good.3机组启动前的联锁保护试验按运行规程要求已完成, 试验合格;Before the start of the un it, the prot
7、ect ion test for the in terlock had bee n done accord ing to the manual and the test is qualified.4按规程要求检查系统、设备符合正常启动条件,相关 阀门处于启动要求的开、关状态,相应联锁、保护处 于投入位置。Check the system according to the manual, all the devices are in accordance with the normal startup condition, the relative valves should be at ope
8、n or close position accord ing the requireme nt of the start, and the corresp onding in terlock and protect ion are at the service positi ons.5投入闭式水系统,检查确认各转机冷却水系统运行正 常;Put the closed circuit water system into service, check each cooling system of each rotary machine works n ormally.序 号No.操作内容Operat
9、ion contents执行 时间Executed time执行情况Executing condition操作人Operator6投入空压机系统,确认系统运行正常。Put the compressor system into service and confirm the system works n ormally.7点火前3小时启动轻油、重油(加热条件具备)供油 泵,炉前油系统打循环。3 hours before the ignition, start the light and heavy oil forwarding pumps including the heating device
10、s and make the oil circulate at the front of the boiler.8锅炉点火前12小时投入电除尘器阴极瓷套保温箱及阴 极振打瓷轴保温箱加热装置,投入灰斗电加热。12 hours before the ignition, put the heaters for the negative pole porcelain sleeve thermostat box of electric de-duster and the negative pole vibration porcelain shaft thermostat box and the heat
11、er for the ash bucket into operatio n.9启动润滑油泵、调节油泵运行,投入润滑油系统。并 检查确认各润滑油系统运行正常。Start the lube oil pump and the regulati on oil pump and put the lube oil system into operation, and check and confirm whether each lube oil system works normally or n ot.10开启汽包及各过热器空气门,关闭给水管道疏水门。 联系汽机启动给水泵向锅炉上水至正常水位。Open
12、the vent valves of drum and each superheater, close the drain valves of feed water pumping, inform the turb ine operator to start the feed water pump to feed water to the boiler till to the no rmal water level.11锅炉上水期间应控制汽包壁温差50C,记录各部膨胀指示。上水完毕后校对各水位计。During the feeding, control the wall temperature
13、of the drum within > 50 C and record the expa nsion in dicati on of each part. After the end of water feedi ng, calibrate each water gauge.12点火前4至6小时投入辅助蒸汽系统,正常后投入炉 底蒸汽加热,记录加热前和加热后各部膨胀指示。4-6 hours before ignition, put the auxiliary steam system in to operati on, after it is no rmal. Heat the boil
14、er bottom with steam, record the expansion indication at each part before and after the heating.序 号No.操作内容Operation contents执行 时间Executed time执行情况Executing condition操作人Operator13确认炉底密封完好。Con firm the seali ng of the boiler bottom is good.14锅炉点火前2小时投入电除尘器各振打装置。2 hours before ignition, put the vibrato
15、r of the electric de-duster into service.15汽包水温100C,解列炉底蒸汽加热,通知汽机。When the drum water temperature is 100°C, stop the heating for the boiler bottom and then inform the turb ine operator.16蒸汽加热完毕后,放水至汽包正常水位,投入省煤器 再循环。After the heating is end, discharge water to the normal water level of drum and
16、put the recirculation of econo mizer into service.二、启动操作步骤B Start operation steps17联系值长、电气,启动风烟系统,确认空预器启动条 件满足,启动 A、B空预器运行;Inform shift engineer and electric shift operator, start the air and flue gas systems, confirm the con diti on to start the air preheated is ok and start the A、B air preheaters.
17、18检查引、送风机启动条件满足,联系值长、电气,依 次启动引风机、送风机运行,调整炉膛总风量在 30% 40%之间,调节炉膛负压正常。Check the con diti ons for start ing the ID and FD fans are satisfied, inform the shift engineer and the electric operator, start the ID and FD fans in turns, adjust the total air quantity of the furnace between 30% 40% and regulate
18、the n egative pressure of the furn ace to be no rmal.19投入炉膛负压自动控制。Put the auto con trol of the furnace n egative pressure into service.序 号No.操作内容Operation contents执行 时间Executed time执行情况Executing condition操作人Operator20启动火焰检测冷却风机运行,运行正常后投入联锁,Startthe cooling fan of the flame detector intooperatio n, a
19、fter it is no rmal, put the in terlock into service.21检查各煤、油火焰检测器冷却风门开启,且风压大于 5Kpa,投入炉膛烟温探针。Check the air valves of each coal and oil flame detector are ope ned and the air pressure is more tha n5Kpa and put the flue gas probe of furn ace into operati on.22联系值长、汽机,确认点火条件具备,检查确认炉膛 吹扫条件满足,按下“炉膛吹扫”按钮,5
20、分钟后吹扫完成。Inform the shift engineer and turbine operator, confirm the ignition condition is ready, check and confirm the purge condition of furnace is satisfied, push down the “brn ace purge” butt on, after 5 minu tes, the purge is completed.23锅炉点火:投入油枪,对角投入油枪使炉膛均匀受 热;调整相应的风门挡板开度,保证燃烧正常;Ignite the boi
21、ler, put the - oil gun into service, put the oil gun in to service on the cross for mak ing the furn ace heating evenly, adjust the relative opening of the air damper for ensuring the combustion normally.24锅炉点火起压后机组按启动升温升压曲线以及金属温 升率,控制升温、升压速度。After the ign iti on and pressuriz ing, con trol the temp
22、erature and pressure rising speed according to the temperature and pressure rising curve and the metal temperature rising ratio.25用锅炉启动对空排汽阀的开度配合控制锅炉升温升压 速度。Control the boiler temperature and pressure rising speed in coord in ate with the ope ning of the valve to atmosphere.26主汽压力在0.150.2MPa时,联系汽机投入
23、旁路系统, 再热器通汽保护,同时关闭汽包及过热器空气门,开 启过热器疏水门,如连续向汽包供水,关闭省煤器再 循环。When the main steam pressure is at 0.15 0.2Mpa, inform the turb ine operator to put the bypass system and序 号No.操作内容Operation contents执行 时间Executed time执行情况Executing condition操作人Operatorthe steam circulati on protect ion of the reheater into op
24、eration, at same time, close the vent valves of the drum and the superheater, open the drain valve of the superheater, if the water is continu ously fed to the drum, close the recirculation of economizer.27主汽压力升至0.4MPa时冲洗水位计,通知相关人员冲 洗压力表管、冲洗水位变送器,并校对水位;通知相 关人员热紧螺丝。When main steam pressure rises to 0
25、.4Mpa, flush the water level gauge, inform the operator concerned to flush the pressure gauge pipe and the tran smitter of water level, calibrate the water level and inform the relative staff to tighte n the screws in hot con diti on.28压力0.5MPa时,定排一次。When pressure is 0.5Mpa, once carry out the perio
26、dic blowdow n.28锅炉点火后可根据饱和蒸汽温升情况逐步成对角增加 油枪;确保汽包最大壁温差小于50 C。After the ign iti on of boiler, the oil guns can be in crease on the cross step by step accord ing to the saturated steam temperature risi ng for en suri ng the max .wall temperature differenee of drum is less than 50 °C .29汽包压力达1.5MPa时
27、,投入锅炉连续排污。When the drum pressure is up to 1.5Mpa, do boiler continu ous blowdow n.30根据升温升压曲线控制压力及汽温,并对锅炉进行全 面检查,炉膛出口烟温达到538 C时退出炉膛烟温探针,Con trol the pressure and temperature of steam accord ing to the temperature and pressure rising curve and thoroughly check the boiler, withdraw the flue gas probe o
28、f furnace when the outlet flue gas temperature of boiler furnace is up to 538 C .31冲转条件满足后汇报值长,做好冲转前的准备,接冲 转命令后全面检查机组正常,冲转前的蒸汽参数:主 蒸汽压力4.0MPa、温度380C ;再热蒸汽温度350 C,再热主蒸汽压力,1.0MPa、。After the initiating condition is satisfied, report to the shift engineer, prepare to initiate. After receiving the序 号No.操
29、作内容Operation contents执行 时间Executed time执行情况Executing condition操作人Operatorinitiation order, thoroughly check the unit which should be normal. The parameters before the initiation: the main steam pressure is 4.0Mpa, temperature is 380 C; the reheat steam temperature is 350 C ; the pressure is 1.0Mpa.3
30、2汽机冲转后关闭未级过热器排汽门,可根据参数逐步 关闭各级过热器疏水门,维持汽温汽压稳定。After the initiation of turbine, close the exhaust steam valve of the last stage superheater, according to the parameter, step by step close the drain valves at each stage of superheater and maintain the steam temperature and pressure stable.33负荷15%B-MCR时
31、,根据系统情况,辅助蒸汽联箱汽 源切换为冷段再热器管道供给。When the load is 15%B-MCR and according to the system condition, change over the steam from the auxiliary steam headder to the steam of the reheater pip ing at cold secti on.34机组并网后根据升温升压曲线增投油枪升温升压,升 至2030%额定负荷时给水由旁路切至主路运行,汽 包水位由电泵转速自动控制。After the un it is synchroni zed
32、, in crease the oil guns to rise the temperature and pressure accord ing to the temperature and pressure rising curve, after the load is in creased to about 20-30% of rated load, the water will be fed from bypass to the main pip ing and the water level of the drum will be con trolled by the motorize
33、d pump automatically.35汽包压力>5MPa,热风温度>250C根据升负荷情况可 启,投运煤粉燃烧器。When the drum pressure is >5MPa, the hot air temperature is >250 C, according to the load rising con diti on, the coal burner can be put into operati on.36主汽压力10 MPa时,加大锅炉连续排污,锅炉洗硅, 联系值长通知化学检查炉水含硅量,合格后再继续升 负荷。When the main stea
34、m pressure is 10Mpa, in crease the continuous blowdown times for washing out the silican, report to the shift engin eer to inform the chemical staff to test the silica n contents in the boiler water, the load can be in creased after the silica n is qualified.37当机组负荷40%额定负荷时,联系值长、汽机启动第 二台给水泵,两台给水泵出力保
35、持平衡。序 号No.操作内容Operation contents执行 时间Executed time执行情况Executing condition操作人OperatorWhen the load of the unit is 40% of the rated one, report to shift engineer and inform the turbine operator to start the second feed water pump, keep the output of two pumps bala nee.38根据主再热汽温情况投入减温水自动调节。According to
36、 the condition of main reheat steam temperature, put the auto regulation of desuperheating water.39当负荷达到230MW时,根据炉内燃烧稳定情况可逐步 停运油枪直至断油燃烧。When the load reaches to 230MW, the oil guns can be stopped step by step according to the stability of the combustion in the furnace till the oil is cut off.40检查锅炉燃
37、烧稳定(不投油稳燃),投运电除尘器并将 振打装置改为周期振打。Check the combusti on in the furnace is stable(without oil help) put the electric de-duster into service and cha nge the vibrator into periodic vibrator.41确认炉组各保护均已投入,汇报值长。After confirming each protection had been in service, report to the shift engin eer.42机组启动操作完毕后,汇
38、报值长。全面检查机组运行 情况并做好记录。After the start operation had been finished, report to shift engineer, thoroughly check the operation of unit and take dow n the record.备 注 Remarks序 号No.特殊情况及异常Special condition and abnormality发生时间Happening time记录人Recorder序 号No.操作内容Operation contents执行 时间Executed time执行情况Executi
39、ng condition操作人Operator附图1:锅炉冷态启动曲线Attached draw ing 1: The start curve for the cold start of boiler5M匕醫主汽出口医力30 60 90 S § 180 210 240 270 300 330 3838§ S 48 f f 一 ? AMS9 圈1“番須滋罂陆翳(磁浇72*工)eujqjn; 40 “isepuj|Ao dlAI直已卑刃申刑戻(UMopjnqs si janoq jaye sjnoi|闻'/母劃)own ijbjs ajejs iujbm 6uiMeja 需聊匹已卑諏:乙国 uor!u6| 和 dn ijbjs 匹哥 uoijeziuojqouAs 画北 (印nug) own (9)回闻 peo| (jaMod) jan
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2024-2025新入职工安全培训考试试题附参考答案(轻巧夺冠)
- 2025厂里安全培训考试试题5A
- 2025公司、项目部、各个班组安全培训考试试题(考题)
- 知到智慧树网课:病理生理学(南方医大)章节测试满分答案
- 2025跨境电商购销合同范本
- 2025租房合同标准范本
- 2025移动应用版本软件授权合同样书
- 2025精简版房屋装修合同协议
- 2025购方信贷合同示范文本
- 2025办公室租赁合同范例
- 2023-2024学年沪科版(2019)高中信息技术必修一第三单元项目六《解决温标转换问题-认识程序和程序设计语言》教学设计
- 《猪的传染病》课件
- 非煤矿山安全生产作业指导书
- 《新媒体营销》课件-项目一 新媒体营销认知
- 医学伦理学的伦理原则
- 2025年春新人教PEP版英语三年级下册课件 Revision Going to a school fair-第2课时
- 《健康进课堂》2024年幼儿园家长助教医疗版
- 《汽车涂装》2024-2025学年第一学期工学一体化课程教学进度计划表
- 小学生涯回顾分享模板
- 机关财务课件
- 2025年冀教版七年级英语下册教学工作计划
评论
0/150
提交评论