多点投入培训讲义_第1页
多点投入培训讲义_第2页
多点投入培训讲义_第3页
多点投入培训讲义_第4页
已阅读5页,还剩55页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、 点投入概念培训Multi-entries Production Line纲目content一、多点投入概念 Concept1、多点投入的目的 Purposes of multi-entries production line2、多点投入的概念 Concept of multi-entries production line3、落差的应用 Application of variance4、水蜘蛛发放规那么 493 for water spider in multi-entry line二、投入产出点的设定标准 setting standard for Input & Output po

2、int三、多点投入的SOPSOP of multi-entries production line1、多点投入的标准流程Standard multi-entries production line. 2、烫衬与水蜘蛛的SOPSOP for press interlining and water spider.3、流程模拟的SOPSOP for layout simulation.4、多点投入转款的SOPSOP for change over5、落差的计算方法Calculation method of variance.四、多点投入的工序平衡Line balance for multi-entr

3、ies production line一、多点投入概念 Concept of multi-entries production line1、多点投入的目的、多点投入的目的 purpose for multi-entries production line为什么要这样做呢?为什么要这样做呢?Why do that?1、多点投入的目的、多点投入的目的减少浪费 purpose for multi-entries production lineeliminate waste我要的裁片在哪儿呀?Where is the panel I need?1、多点投入的目的、多点投入的目的流程简单目视化 purp

4、ose for multi-entries production linesimple for managing2、多点投入的概念、多点投入的概念Concept of multi-entries production line什么是多点投入呀?什么是多点投入呀?What is multi-entries production line?什么是多点投入?What is multi-entries production line?根据不同款式流程分区设置、裁片分点投入、 所有非标准作业由水蜘蛛完成的一种后拉生产模式Production line is arranged to several are

5、as in sequence and feed panel to different input points based on styles. All the nonstandard work will be finished by water spider under pull concept.前片前片front后片后片back袖子袖子sleeve3、多点投入的根底落差的应用foundation of multi-entries production line application of variance什么是落差啊?什么是落差啊?What is variance?3、多点投入的根底落差

6、的应用 foundation of multi-entries production line application of variance为了能保证在路程长短不一的环形跑道上,运发动们能够同时到达终点;田径跑道上的外圈起点设置总是在内圈起点的前面。For ensure all the athletes arrive to goal in the circle runway with the same distance, the start point for outer track always in the front of inside track. 组装进前片Input front进

7、袖子Input sleeve进后片Input back生产线内各零件区域之间,因流程的长短造成投入裁片数量的差值The different length of garment parts in line, induce to the differ of feeding panels.3、多点投入的根底落差的应用 foundation of multi-entries production line application of varianceAssembly组装进前片Input front进袖子Input sleeve进后片Input back3、多点投入的根底落差的应用 foundatio

8、n of multi-entries production line application of varianceAssembly组装进前片Input front进袖子Input sleeve进后片Input back3、多点投入的根底落差的应用 foundation of multi-entries production line application of varianceAssembly组装进前片Input front进袖子Input sleeve进后片Input back3、多点投入的根底落差的应用 foundation of multi-entries production li

9、ne application of varianceAssembly组装进前片Input front进袖子Input sleeve进后片Input back3、多点投入的根底落差的应用 foundation of multi-entries production line application of varianceAssembly组装进前片Input front进袖子Input sleeve进后片Input back3、多点投入的根底落差的应用 foundation of multi-entries production line application of varianceAssemb

10、ly组装进前片Input front进袖子Input sleeve进后片Input back3、多点投入的根底落差的应用 foundation of multi-entries production line application of varianceAssembly组装进前片Input front进袖子Input sleeve进后片Input back3、多点投入的根底落差的应用 foundation of multi-entries production line application of varianceAssembly组装进前片Input front进袖子Input sleev

11、e进后片Input back3、多点投入的根底落差的应用 foundation of multi-entries production line application of varianceAssembly组装进前片Input front进袖子Input sleeve进后片Input back3、多点投入的根底落差的应用 foundation of multi-entries production line application of varianceAssembly组装进前片Input front进袖子Input sleeve进后片Input back3、多点投入的根底落差的应用 fou

12、ndation of multi-entries production line application of variance换床换码无需重新计算落差,按顺序整件发放、依次换码 Dont need calculate variance again when change size, feed panels in sequence.Assembly4、水蜘蛛发放原那么、水蜘蛛发放原那么安灯控制安灯控制principle for feed panel Andon control大黄灯和小红灯(任一)两色灯同时亮时才能发裁片Water spider can feed panels under th

13、e both lights opening.大黄灯-后拉生产控制器 big yellow light - control follow by pull system 小红灯-工序平衡控制器Small red light/ activity light- control line balance4、水蜘蛛发放原那么、水蜘蛛发放原那么关灯关灯 principle for feed panelturn off lights发裁片前关大黄灯Turn off big yellow light before feed panels4、水蜘蛛发放原那么、水蜘蛛发放原那么发放顺序发放顺序 principle

14、for feed panel sequence of feed谁先亮灯先发谁!Feed panels according to the sequence of light opening4、水蜘蛛发放原那么、水蜘蛛发放原那么关灯关灯 principle for feed panel turn off lights发裁片后关红灯!Turn off red light / activity light after feed panel4、水蜘蛛发放原那么、水蜘蛛发放原那么整件发放整件发放principle for feed panel feed complete garment one time上

15、件裁片没发完, 不可以发下一件!Before finishing feed one complete garment, water spider couldnt feed the next garment.4、水蜘蛛发放原那么、水蜘蛛发放原那么岗位职能岗位职能 principle for feed panel job functionQC品质亮红灯停发! Stop feed panels once the quality light opening4、水蜘蛛发放原那么、水蜘蛛发放原那么岗位职能岗位职能 principle for feed panel job function换换12码码 ch

16、ange size 12换码要说明Need to announce for change size4、水蜘蛛发放原那么、水蜘蛛发放原那么岗位职能岗位职能 principle for feed panel job function离岗要有人顶替,并被告知发放规那么 the substitute need to be told the principle of feed panels when water spider go away.4、水蜘蛛发放原那么、水蜘蛛发放原那么岗位职能岗位职能 principle for feed panel job function符合发放条件要马上发放裁片Need

17、 to feed panels in time.二、投入产出点的设定标准Setting standard for input and output points二、投入产出点的设定标准Setting standard for input and output pointsn投入产出点的设定并不是越多越好,而是要根据流程中所需设备、辅助工具、线型号来进行合理的合并工序,以减少设备的浪费和便于水蜘蛛的简单操作;It is not better for more input and output points, but need to combine procedures based on requ

18、ired machines, fixes and thread type in flow, so that to reduce equipments waste and easy to work for water spider.越多越好吗?!Is it better for More points?五、投入产出点的设定标准 Setting standard for input and output pointsn但也不能一味追求减少投入点而增加作业员大量的传递寻找动作。We can not add lots of transfer motion to operators for the pu

19、rpose of reducing input & output points.进口input进口input越少越好吗?!Is it better for less points?五、投入产出点的设定标准 Setting standard for input and output points1、区域设置原那么 principle of setting areas五、投入产出点的设定标准 Setting standard for input and output points2、设备、辅助工具、线型号整合原那么Principle of combining machines, acces

20、sory tools and thread type五、投入产出点的设定标准 Setting standard for input and output points3、就近整合原那么principle of combining the nearest operations五、投入产出点的设定标准 Setting standard for input and output points4、自动流出原那么Principle of output automatically三、多点投入的SOPSOP for multi-entries production flow1、多点投入、多点投入SOPsop

21、 for multi-entries production flow水蜘蛛作业标准水蜘蛛作业标准SOP for water spider2、多点投入、多点投入SOP流程模拟作业标准流程模拟作业标准sop for layout simulation3、多点投入、多点投入SOP转款作业标准转款作业标准SOP for change over3、转款总结Summarize for change over1、人员:组长、TPE、PE、领班、观察领班、TPE; member: supervisor, TPE, PE, observing supervisor and TPE2、物料:总结看板、白板笔红、蓝

22、; material: board for summarize, board pen (red, blue)3、内容:问题点所有人员提、改善措施责任人写、责任人负责实施人员、完成时间工程方案完成的时间由责任人写; content: problems (provided by all member), improve method, who is the responsibility person, finish time.4、记录归档共享; file and share the summarize record.四、多点投入的工序平衡Line balance for multi-entries

23、 production flow 如何区分生产线不平衡,寻找如何区分生产线不平衡,寻找等待、搬运、动作的浪费,提等待、搬运、动作的浪费,提升效率升效率? ?How to find the line How to find the line imbalance, and find out the imbalance, and find out the waste of waiting, moving, waste of waiting, moving, motion to improve motion to improve efficiency?efficiency?工序堆货 WIP more

24、than one piece生产断流,人员出现等待Production breakdown, worker start to wait电子看板实际产量比目标产量少Actual output is less than plan人员请假Worker ask leave202218199ABCD瓶颈瓶颈Bottleneck瓶颈瓶颈BottleneckBottleneck一个木桶的最大容水量取决于最短的那块木板The largest capacity of cask depends on the shortest board.一条生产线的最大日产量取决于节奏最慢的那个工作站The largest da

25、ily output of production depends on the slowest station.认识生产中的瓶颈认识生产中的瓶颈Realize the bottleneck of production木桶原理 cask principle 做做YO-I-DONYO-I-DON测时,测时,画出画出Bar ChartBar Chart找出时间最找出时间最长的瓶颈工作站长的瓶颈工作站Carry out YO-I-DON, draw out Bar chart and find out the bottleneck station.YO-I-DON的运用的运用Application o

26、f YO-I-DON1什么时候做什么时候做YO-I-DON?When do YO-I-DON?YO-I-DON的改善步骤的改善步骤Steps of carrying out YO-I-DONFirstly, time testing for each operations, then draw out bar chart.Secondly, find out bottleneck and analyze by cumulative bar chart.Thirdly, apply work balancing between operations and improve each operat

27、ion.Fourthly, Evaluate the improvement resultFifthly, Prepare and apply the improved SOP. 做做YO-I-DON改善的步骤改善的步骤 Steps of carrying out YO-I-DON做做YO-I-DON改善的三大宪法改善的三大宪法Three constitutions of doing YO-I-DON -takt time, one piece flow and pull system-pre-condition is 100% good production- continue doing

28、YO-I-DON做做YO-I-DON改善的工具改善的工具Tools of doing YO-I-DON- platform, number plates, loud speaker, stopwatch做做YO-I-DON改善的表格改善的表格Forms/Documents in doing YO-I-DON山积表的目的:山积表的目的:做做YO-I-DONYO-I-DON找出瓶颈工找出瓶颈工序,运用山积表进行分析,寻序,运用山积表进行分析,寻找浪费,进行改善,降低作业找浪费,进行改善,降低作业时间,能够使瓶颈工作站作业时间,能够使瓶颈工作站作业时间到达或者接近目标节奏,时间到达或者接近目标节奏,

29、来平衡生产线,提升效率来平衡生产线,提升效率Purpose of cumulative Bar Purpose of cumulative Bar chart:chart:After the bottleneck is After the bottleneck is found, use the cumulative found, use the cumulative bar chart to analyze waste bar chart to analyze waste motion. Then take actions motion. Then take actions to remov

30、e the waste to remove the waste motion, cut the operation motion, cut the operation time (to meet/reduce the time (to meet/reduce the takt time) and improve the takt time) and improve the line balancing. line balancing. 山积表的运用山积表的运用application of Cumulative Bar Chart 步骤一步骤一做做YOI-DONYOI-DON画出画出Bar ChartBar Chart找出瓶找出瓶颈工序车里颈工序车里布,运用山积布,运用山积表进行分析表进行分析Carry out YO-I-DON, draw out Bar chart and find out the bottleneck station. Analyze by cumulative ba

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论