1、电气安装工程施工质量控制程序Quality Inspection and Test Plan for Installation of Electrical Work目录TABLE OF CONTENTS1. 电气装置安装工程应执行的标准、规范 Applicable Codes and Standards . 2. 电气装置安装工程质量控制点 Quality Control Point:. 3. 电气装置安装工程质量控制表格、交工资料表格及质量评定表格目录 Applicable forms for quality control, turnover document and quality ev
2、aluation: . Quality Inspection and Test Plan for Installation of Electrical Work(Rev1).doc电气安装工程施工质量控制程序Quality Inspection and Test Plan for Installation of Electrical Work1. 电气装置安装工程应执行的标准、规范 Applicable Codes and Standards监理规范:GB503192000建设工程监理规范Code on Supervision of Construction Project, GB503192
3、000交工技术文件规定:SH35032001石油化工工程建设交工技术规定Regulation of Technical Turnover Document for Construction of Petrochemical IndustryProject, SH35032001技术规范:GB0254-1996,GB0255-1996, GB0256-1996, GB0257-1996 电气装置安装工程施工及验收规范Code on Construction and Acceptance Inspection of Electrical Installation, GB0254-1996,GB02
4、55-1996, GB0256-1996, GB0257-1996GB50303-2002 建筑电气工程施工质量验收规范, Code on Acceptance of Construction Quality of Electrical Installation in Building, GB50303-2002GB50171-1992 电气装置安装工程盘柜及二次回路接线施工及验收规范Code on Construction and Acceptance Inspection of Panel Installation and Control Circuit Wiring of Electri
5、cal Work, GB50171-1992GBJ149-1990 电气装置安装工程母线装置施工及验收规范Code on Construction and Acceptance Inspection of Bus bar Installation of Electrical Work, GB149-1990GB-50170-1992 旋转式电动机安装工程施工及验收规范Code on Construction and Acceptance Inspection of Rotating Motor Installation, GB50170-1992GBJ148-199 电气装置安装工程电力变压器
6、、油浸电抗器、互感器施工及验收规范Code on Construction and Acceptance Inspection of Installation of Power Transformer, Oil Immersed Reactor, and Metering Transformers of Electrical Work, GBJ148-1990GB50150-1991 电气装置安装工程电气设备交接试验标准Standard on Turnover Testing of Electrical Equipment Installation Work, GB50150-1991GB50
7、168-1990 电气装置安装工程电缆线施工及验收规范Code on Construction and Acceptance Inspection of Electrical Cabling Work, GB50168-1990GB50085-1992 爆破和火灾危险环境电力装置设计规范Design Specification for the Explosion, Fire and Risk Environment of Electric Power Unit GB50085-1992GBJ147-1990 电气装置安装工程高压电器施工及验收规范Code on Construction and
8、 Acceptance Inspection of HV Electrical Apparatus of Electrical Work, GBJ147-1990GB50303-2002 电气装置安装工程照明装置施工及验收规范Code on Construction and Acceptance Inspection of Lighting Device Installation of Electrical Work, GB50303-2002电气安装工程施工质量控制程序Quality Inspection and Test Plan for Installation of Electrica
9、l WorkGB50172-1992 电气装置安装工程蓄电池装置施工及验收规范Code on Construction and Acceptance Inspection of Battery Device Installation of Electrical Work, GB50172-1992GB50169-1992 电气装置安装工程接地装置施工及验收规范Code on Construction and Acceptance Inspection of Grounding System of Electrical Work, GB50169-1992SH3505-1999 石油化工施工安全
10、技术规范Code on Construction Safety and Technology of Petrochemical Industry Project, SH3505-1999质量评定标准:Quality Inspection and Test Plan for Installation of Electrical Work(Rev1).doc2. 质量控制点 Quality Control Point:电气安装工程施工质量控制程序Quality Inspection and Test Plan for Installation of Electrical Work序 号质量控制点控
11、制内容控制方法等 级参加单位控制表格 验收表格 评定表格施工 总承 包商监理PMC业主政府 部门1施工技术文件方案审查(1) 施工方案(2) 质量控制程序(3) 人员组织施工图执行 P-CM302002 施工方案审查程序BXXXGB 50319-2000-A22设备材料验收(1) 设备外观检查符合规范要求;检查内容包括品种、型号、数量、铭牌、规格、质量、设备材料合格证(2) 专用工具、技术文件齐全材料汇总表执行 P-CM305002 设备进场检验程序AXXXXGB 50319-2000-A93盘柜基础验收(1) 基础位置,预留孔,预埋件(2) 基础型钢平直度执行GB50171-1992 电气装
12、置安装工程盘柜及二次回路结线施工及验收规范和P-CM306001专业间移交程序BXXGB 50319-2000-A4/A104盘柜安装检查(1) 水平度、垂直度、间隙、位号(2) 电器安装,抽屉小车操作灵活,接触可靠(3) 绝缘测试和接地测试执行GB50171-1992电气装置安装工程盘柜及二次回路结线施工及验收规范,P-CM306001 安装过程质量控制程序和安装平面图BXXGB 50319-2000-A4/A10SH3503-2001-J539, 5保护控制盘安装(1) 水平度、垂直度、间隙、位号(2) 电器安装,小母线,相序,标志牌(3) 绝缘测试和接地测试执行GB50171-1992电
13、气装置安装工程盘柜及二次回路结线施工及验收规范,P-CM306001 安装过程质量控制程序和安装平面图CXGB 50319-2000-A4/A10SH3503-2001-J540Quality Inspection and Test Plan for Installation of Electrical Work(Rev1).doc电气安装工程施工质量控制程序Quality Inspection and Test Plan for Installation of Electrical Work6母线安装 母线板连接及螺栓力矩设定,母线平直度,弯曲半径及固定 安全距离,相序,相色,相序测试执行G
14、BJ149-1990电气装置安装工程母线装置施工及验收规范和安装图CXSH3503-2001-J5127二次回路接线(1) 电缆、排列、固定铠装屏蔽、接地(2) 接线、回路编号、外观整齐、牢靠执行GB50171-1992电气装置施工工程盘柜及二次回路结线施工及验收规范和二次回路接线图CXGB 50319-2000-A4/A108变压器安装(1) 变压器外观、固定、水平度要求(2) 油位、密封、硅胶、接地要求(3) 耐压, 电阻执行GBJ148-1990电气装置安装工程电力变压器油浸电抗器互感器施工及验收规范,P-CM306001安装过程质量控制程序和安装图BXXXGB 50319-2000-A
15、4/A10SH3503-2001-J504,J534, J535, J5369电缆桥架安装(1) 支架、桥板安装牢固(2) 平顺整齐,走向正确(3) 桥架出现管(4)接地可靠性执行GB50168-1992电气装置安装工程电缆线路施工及验收规范,P-CM306001安装过程质量控制程序和施工图CXSH 3503-2001-J54610电缆敷设(1) 电缆、弯曲半径、排列排序、标志牌、标志桩(2) 接头、相序、记录、保护接地(3)测试执行GB50168-1992电气装置安装工程旋转电机施工及验收规范和施工图BXXXGB50319-2000-A4/A9SH3503-2001-J508,J543, J
16、51211交流电动机安装检查(1) 铭牌参数,防爆等级,轴承密封(2) 接线、编号、间隙、集电环、刷架、刷握、技术要求(3)保护整定值、主控回路电阻、接地要求、测试执行GB50170-1992 电气装置安装工程电缆线路施工及验收规范和设备说明书BXXXGB50319-2000-A4/A9SH3503-2001-J502,J531, J532, J53312照明安装(1) 照明安装、位置、垂直、平直度、密封、安全距离、接地(2) 接线回路编号、牢固性、防爆措施、相色规定、测试执行GB50303-2002建筑电气工程施工质量验收规范和施工图纸BXXXGB 50319-2000-A4/A10SH35
17、03-2001-J54413直流电源UPS安装(1) 柜内接线、标志、部件操作灵活(2) 蓄电池组装、接线充放电(3)绝缘电阻、调试执行GB50172-1992电气装置安装工程蓄电池装置施工及验收规范和设备说明书BXXXGB 50319-2000-A4/A10SH3503-2001-J541,J542-1, J542-214电气设备功能调试(1) 断路器行程要求、指示器准确、安全距离、插件接触、机构灵活(2) 三相异步电动机、按规范和按说明书的规定调试、测试执行GB50150-1991电气装置安装工程电气设备交接试验标准和设备说明书CXSH3503-2001-J512,J SH3503-200
18、1-J50715火灾和报警系统安装检查(1) 安装管路及线槽, 支、吊架符合规范要求(2) 系统安装、位置、标高、穿线符合规定要求(3)接线、标号、绝缘电阻接地(4)检查其全部功能均符合设计规范执行GB50085-1992 爆破和火灾危险环境电力装置设计规范,设计施工图AXXXXGB 50319-2000-A4/A10SH3503-2001-J54516电气设备接地安装测试(1) 接地线、接点、接线规定、牢固性(2) 接地电阻值执行GB5016-1992电气装置安装工程接地装置施工及验收规范和设计技术要求BXXXGB 50319-2000-A417电气试验表计校验(1) 互感器、变压器、避雷器
19、、电容器、高压开关、操作机械电气设备试验(2) 电度表、电流表、电压表计校验执行设备说明书CXSH3503-2001-J504,J505,J506, J509, J518, J51918继电器校验鉴定系统整定值和动作可靠性执行GB50150-1991电气装置安装工程电气设备交接试验标准和继电器说明书CXSH3503-2001-J514,J515,J516, J51719耐压试验(1) 高压电气设备、电动机、变压器等耐压试验(2) 绝缘电阻值执行GBJ147-1990电气装置安装工程高压电器施工及验收规范和试验报告单CXSH3503-2001-J51220开关联动试验(1) 试验方案(2) 二次
20、回路接线、保护正定测量正确(3)联动试验报告执行GBJ147-1990电气装置安装工程高压电器施工及验收规范和试验报告单AXXXXGB 50319-2000-A4/A10SH3503-2001-J52121模拟试验按整定值要求通电模拟断路器跳闸动作情况执行GBJ147-1990电气装置安装工程高压电器施工及验收规范和试验报告单AXXXXGB 50319-2000-A4SH3503-2001-J50722受电(1) 安装完毕、检查、试验合格、试验报告(2) 空负荷受电/满负荷受电验电、核相执行GBJ147-1990电气装置安装工程高压电器施工及验收规范和送电规定程序操作规程AXXXXGB 503
21、19-2000-A4/A1023送电遂回路送电进行试车考核执行GB5J147- 1990电气装置安装工程高压电器施工及验收规范和操作票AXXXXGB 50319-2000-A4/A10SH3503-2001-J50124交工验收(1) 出厂技术资料(2) 电气施工记录(3)施工竣工图(4)修改通知单执行P-CM308010交工技术文件验收规范BXXXGB 50319-2000-A4SH3503-2001-J502,J521, J531, J545电气安装工程施工质量控制程序Quality Inspection and Test Plan for Installation of Electric
22、al WorkNo. Quality ControlPointControl ContentControl MethodGradeParty InvolvedApplicable FormsContractors Super vision companyPMCOwnerGovernment Agency1Review Technical Document & work Method Statement (1) Construction procedure(2) Quality control system(3) Construction manpower, and constructi
23、on equipment and toolsAs per Construction Drawing and P-CM3020022 Review and Approval Procedure for construction method statementBXXXGB 50319-2000-A22Equipment and Material Inspection (1) Visual Inspection to equipment/material as per code requirement, check the type, quantity, specification, and ce
24、rtificates(2) Special tools and technical document are completeAs per Material take off and P-CM305002 Inspection Procedure for the Material and Equipment Delivered on SiteAXXXXGB 50319-2000-A93Panel Foundation Acceptance Inspection (1) Foundation, location pre-installed opening and embedded items(2
25、) Levelness of base steelAs per GB50171-1992 Code on Construction and Acceptance Inspection of Panel Installation and Control Circuit Wiring of Electrical Work and P-CM305003 Turnover Procedure among DisciplinesBXXGB 50319-2000-A4/A104Panel Installation Inspection (1)Verticality, levelness, clearanc
26、e and tag number(2)Electric devices installation, busbar, phase sequence, and marking(3) Insulation megger test and grounding continuity testAs per GB50171-1992 Code on Construction and Acceptance Inspection of Panel Installation and Control Circuit Wiring of Electrical Work and P-CM306001 Quality C
27、ontrol Procedure in the Process of InstallationBXXGB 50319-2000-A4/A10SH3503-2001-J539, 5Installation of Control Panels(1)Verticality, levelness, clearance and tag number(2)Electric devices installation, busbar, phase sequence, and marking(3) Insulation megger test and grounding continuity testAs pe
28、r GB50171-1992 Code on Construction and Acceptance Inspection of Panel Installation and Control Circuit Wiring of Electrical Work and P-CM306001 Quality Control Procedure in the Process of InstallationConstruction drawingCXGB 50319-2000-A4/A10SH3503-2001-J540电气安装工程施工质量控制程序Quality Inspection and Test
29、 Plan for Installation of Electrical Work6Busbar Installation (1) Levelness, straightness, and tightness of busbar connection, bending radius, and fitness(2)Safe distance, phase sequence, phase marking, and testingAs per GBJ149-1990 Code on Construction and Acceptance Inspection of Busbar Installati
30、on of Electrical Work and Installation DrawingsCXSH3503-2001-J5127Control Circuit Wiring (1) Wiring, arrangement, shielding of armored cables and grounding(2) Connection, circuit marking, appearance and fitnessAs per GB50171-1992 Code on Construction and Acceptance Inspection of Panel Installation a
31、nd Control circuit wiring of Electrical Work; Control Circuit Wiring DiagramCXGB 50319-2000-A4/A108Installation of Transformer(1) Appearance, levelness and fitness of installation(2) Oil level, sealing, grounding requirement(3) Dielectric and resistance testingAs per GBJ148-1990 Code on Construction
32、 and Acceptance Inspection of Power Transformer, Oil Reactor, and Metering Transformers of Electrical Work; P-CM306001Quality Control Procedure in the Process of Installation; Construction DrawingsBXXXGB 50319-2000-A4/A10SH3503-2001-J504,J534, J535, J5369Cable Tray Installation (1) Installation of b
33、racket/support and cable tray, cable arrangement, marking(2) Levelness and alignment, and correct routing(3) Outgoing conducting (4) Reliable groundingAs per GB50168-1992 Code on Construction and Acceptance Inspection of Cabling Installation of Electrical Work and Construction drawings CXSH 3503-200
34、1-J54610Cabling(1) Cable and bending radius, arrangement, cable mark, and signs on/above ground(2) Cable head, phase sequence, record, and safety grounding (3) Testing As per GB50168-1992 Code on Construction and Acceptance Inspection of Cabling Installation of Electrical Work and Construction drawi
35、ngsBXXXGB50319-2000-A4/A9SH3503-2001-J508,J543, J51211Installation of AC Motors(1) Check the name plate, explosion proof grade, bearing seal(2) Connection, marking, clearance, collecting ring and brush support, and the technical requirement(3) Relay settings, resistance of main control circuit, and
36、grounding connection, and testingAs per GB50170-1992 Code on Construction and Acceptance Inspection of Rotating Motor Installation and Vendors Instruction Manual BXXXGB50319-2000-A4/A9SH3503-2001-J502,J531, J532, J53312Lighting Installation (1) Check the installation, location, verticality, levelnes
37、s, sealing, safety distance, and grounding of the lighting(2) Check the circuit marking, tightness, explosion proof measures, phase coding, and testingAs per GB50303-2002 Code of Acceptance of Construction Quality of Electrical Installation in Building and Construction drawingsBXXXGB 50319-2000-A4/A
38、10SH3503-2001-J544电气安装工程施工质量控制程序Quality Inspection and Test Plan for Installation of Electrical Work13DC System and UPS Installation (1) Wiring and marking inside the panels(2) Battery assembly, wiring and charging/discharging(3) Insulation resistance and testingAs per GB50172-1992 Code on construct
39、ion and Acceptance Inspection of Battery Device Installation of Electrical Work and Vendors Instruction Manual BXXXGB 50319-2000-A4/A10SH3503-2001-J541,J542-1, J542-214Equipment Function Checking and Testing(1) Breaker travel requirement, correct indication, safe distance, and the reliability of mec
40、hanism operation (2) Testing to three-phase motor as per requirement of code and instruction manual As per GB50150-1991Standard on Turnover Testing of Electrical Equipment Installation Work and Vendors Instruction Manual CXSH3503-2001-J512,J SH3503-2001-J50715Installation and Inspection of Fire alar
41、m System(1) Install the conducting, and support/hanger as per code requirement (2) System Installation, location, elevation and wiring as per requirement(3) Connection, marking, and Insulation resistance and grounding(4) Check the function to meet the engineering design and code requirementAs per GB
42、50085-1992 Design Specification for the Explosion, Fire and Risk Environment of Electric Power Unit GB50166-1992 and construction drawingsAXXXXGB 50319-2000-A4/A10SH3503-2001-J54516Equipment Grounding Installation and Testing(1) Grounding wiring, connection as per the code and engineering design req
43、uirement(2) Grounding resistanceAs per GB5016-1992 Code on construction and Acceptance Inspection and Grounding System of Electrical Work and design requirementBXXXGB 50319-2000-A417Electrical Metering Calibration (1) Testing to metering transformer, transformer, lightning arrester, capacitor, high
44、voltage switchgear, operating mechanism(2) Testing to volt meter, current meter, and KWH meterAs per equipment installation instruction manual CXSH3503-2001-J504,J505,J506, J509, J518, J51918Relay Calibration an d Verification Check the settings and operation reliabilityAs per GB50150-1991 Standard
45、on Turnover Testing of Electrical Equipment Installation work and the Equipment Instruction Manual CXSH3503-2001-J514,J515,J516, J51719Dielectric Testing(1) Dielectric test to high voltage equipment, motors and transformers(2) Insulation testing record reportAs per GBJ147-1990 Code for on the constr
46、uction and Acceptance of HV Electrical Apparatus of Electrical Work and Testing Report CXSH3503-2001-J51220Breaker Interlock Testing (1) Testing plan(2) Correctness of control circuit wiring and relay setting(3) Interlock test reportAs per GBJ147-1990 Code for the construction and acceptance of HV E
47、lectrical Apparatus of Electrical work and testing reportAXXXXGB 50319-2000-A4/A10SH3503-2001-J52121Simulation TestingAs per the setting, energize the equipment and carryout simulation test to vacuum breaker for tripping and signaling test As per GBJ147-1990 Code on the Construction and Acceptance o
48、f HV Electrical Apparatus of Electrical Work and Testing reportAXXXXGB 50319-2000-A4SH3503-2001-J507电气安装工程施工质量控制程序Quality Inspection and Test Plan for Installation of Electrical Work22Engergizing(1) Equipment is installed, checked, and test on spec, test report is available(2) No-load energizing, fu
49、ll load testing, and verify phase sequenceAs per GBJ147 1990 Code on the Construction and Acceptance of HV Electrical Apparatus of Electrical Work and procedure for energizing electrical equipment, carryout the energizing workAXXXXGB 50319-2000-A4/A1023Operation with LoadSwitch on each feeder for co
50、mmissioning and performance testAs per GBJ147 1990 Code for the Construction and Acceptance of HV Electrical Apparatus of Electrical Work and operation permitAXXXXGB 50319-2000-A4/A10SH3503-2001-J50124Acceptance Inspection and Turnover(1) Vendors technical document(2) Electrical testing record(3) As
51、-built drawings(4) Change order noticeAs per P-CM308010 Acceptance Procedure for Technical Turnover DocumentBXXXGB 50319-2000-A4SH3503-2001-J502,J521, J531, J545电气安装工程施工质量控制程序Quality Inspection and Test Plan for Installation of Electrical Work3. 本工程质量控制表格、交工资料表格及质量评定表格目录 Applicable forms for quality control, turnover document and quality evaluation:GB503192000A2 施工组织设计(方案)报审表Form of Request for Review/Approval of Construction Organ
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 依据施工合同(标准版)
- 酒店管理模拟技能考试题及答案
- 企业持有上市公司股权会计问题探析分析研究 财务会计学专业
- 高考历史云南真题及答案
- 船舶制造新技术创新创业项目商业计划书
- 绿茶柠檬蜜饯行业跨境出海项目商业计划书
- 老年非遗传承创新创业项目商业计划书
- 老人健康关怀手表企业制定与实施新质生产力项目商业计划书
- 美容产品代工生产自动化行业跨境出海项目商业计划书
- 社交焦虑心理干预创新创业项目商业计划书
- 2025至2030鸡汁行业风险投资态势及投融资策略指引报告
- 手足外科护理常规
- 光电成像原理与技术课件
- (高清版)DB31∕T 1578-2025 微型消防站建设与运行要求
- 儿童百日咳的诊治
- 40篇英语短文搞定高考3500个单词(全部含翻译,重点解析)
- 江苏艺考笔试题及答案
- 2025年中考语文作文中考12大主题作文模板!-分步详解+例文示范
- 餐饮连锁稽核管理制度
- 详细操作说明书及维修指导手册
- 中国精神障碍防治指南课件
评论
0/150
提交评论