VESTAS 风机系统检修服务 电气部分_第1页
VESTAS 风机系统检修服务 电气部分_第2页
VESTAS 风机系统检修服务 电气部分_第3页
VESTAS 风机系统检修服务 电气部分_第4页
VESTAS 风机系统检修服务 电气部分_第5页
全文预览已结束

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、VESTAS WIND SYSTEMS A/S KONTROLSKEMA INSPECTION RECORD FORM No.: 946619 Operation/sted: Serviceafd. Titel: V52-850kW eftersyn, elektrisk del. VMP-5000 Ref. No.: 946612 Work/place: Service dep. Item: V52-850kW Check, Electrical Part. VMP-5000 V52-850kW 检修 电气部分946616 Rev. date R Sign. Appd. 000929 1 M

2、BD IHS 010904 2 HHL IHS 031022 3REMI LERA031217 4HESV JFNUdført af / Executed by: Date: IHS 000709 Suppl. tegn./ Drawings. 050706 5 MOBKR MOSVE 6 7 8 9 Godkendt / Approved. FREA Page of1 4 Mølle nr./ WEC no.: No.: Kontrolleret af / Supervisor: Name: Dato/ Date: Date: Bemærkninger p

3、29;føres servicerapport. nr.: Remarks to be recorded in the service rep. no: History of this document: Changes in this revision: Item no: Date: Description of change: 946619.R2 2001-09-04 2.7: F32/Q16 changed to Q7 5.2: Reset counters section deleted Language revision Item no: Date: Description

4、 of change: 946619.R3 2003-10-22 4.4: Redundant tolerance interval on table deleted according to AAAN 1.1: renumbered to 1.2 Some layout corrections Language revision In point 2.7 is Q7 changed to F34A Item no: Date: Description of change: 946619.R4 2003-12-17 2.2: New point added: “Test of UPS syst

5、em”. 2.3: New point added: “AGO2 chopper test”. Item no: Date: Description of change: 946619.R5 2005-07-06 4.4 and 4.5: Text for conditions changed. 中文英文 三个月6 month 1 year 1. 保护 Preconditions 1.2 安全条件. Safety Conditions. 􀂆 􀂆 􀂆 2. 安全部件 Safety Components 2.1 风速, 图一 Wind spee

6、d. Picture 1. m/s 2.2 UPS系统试验(可选) 电池试验Test of UPS system (optional) Battery test UPS test 􀂆 􀂆 􀂆􀂆􀂆􀂆2.3 AGO 2断续试验(可选) 试验 1 频道 1 试验 试验 2 - 频道 2 试验 试验 3 - 频道1&2, 负荷试验 AGO2 chopper test (optional) Test 1 - Channel 1 test Test 2 - Channel 2 test Te

7、st 3 - Channel 1&2, High load test 􀂆 􀂆 􀂆 􀂆 􀂆 􀂆 􀂆􀂆 􀂆2.4 环境温度 图 6. 齿轮油温度 Ambient temperature. Picture 6 Gear oil temperature -°C-°C2.5 风机迎风偏航 图 1CThe turbine is yawed up-wind. Picture 1C. 􀂆 𙦧

8、0; 􀂆 2.6 跳机试验 Q8. 图 13. Test of Trip Q8. Picture 13. 􀂆 􀂆 􀂆 2.7 紧急停机按纽试验 图 12. S933 在主轴: S934 在偏航盘: S935 在顶部控制柜 S936 在地面控制柜 Test of em. stop buttons. Picture 12. S933 at the Main Shaft: S934 at the Yaw Plate: S935 at the Top Controller: S936 at the Ground Controlle

9、r: 􀂆 􀂆 􀂆 􀂆 􀂆 􀂆 􀂆 􀂆 􀂆 􀂆 􀂆 􀂆 2.8 制动试验 图 12 S208: 不管是备用电池否有电,手动紧急按纽启动时,可适用 Test of brake, Picture 12 S208: Applied when manual emergency stop button is activated regardless of battery back-up: &#

10、1048710; 􀂆 􀂆 2.9 备用电池试验. 关掉F34A. 检查制动是否在60-120秒后才可用. Test of battery backup. Switch off F34A. Check that the brake is not applied until after 60 -120 sec. 􀂆 􀂆 􀂆 2.10 振动感应器试验 图 12. S403Test of vibration sensor. Pict. 12. S403 􀂆 􀂆 𙦧

11、0; 2.11 地面控制柜PTS5试验 顶面控制柜PTS5试验Test of PTS5, Ground Controller Test of PTS5, Top Controller 􀂆 􀂆 􀂆 􀂆 􀂆 􀂆 2.12 加热风力感应器分线 Heating of the wind sensors branches. 􀂆 􀂆 􀂆 3. 变频Pitch 3.1 11.6试验,无风转向90° Yaw 90° out of t

12、he wind. Test 11.6. 􀂆 􀂆 􀂆 3.2 安装转子锁定系统 试验11.7. Install the rotor locking system Test 11.7. 􀂆 􀂆 􀂆 3.3 负变频中止 试验 11.8 0,040V 0,020V0,060V: Negative pitch end stop. Test 11.8 0.040V 0.020V0.060V: 􀂆 􀂆 􀂆 V 3.4 正变频中止试验 11.8 9,

13、710V 9,690V9,730V: Positive pitch end stop. Test 11.8 9.710V 9.690V9.730V: 􀂆 􀂆 􀂆 V 3.5 液压油温度至少 20°C. 才能进行11.4 试验 Hydraulic oil temperature has to be at least 20°C. Test 11.4 can be used. 􀂆 􀂆 􀂆 °C 3.6 正抵销调整试验 Test 11.9. 1,2°/se

14、k 0,7°/sek 2,1°/sek : Positive offset adjustment Test 11.9. 1.2°/sec 0.7°/sec 2.1°/sec : 􀂆 􀂆 􀂆 °/s 3.7正抵销调整试验11.10. -1,2°/sek -0,5°/sek -1,9°/sek : Negative offset adjust. Test 11.10. -1.2°/sec -0.5°/sec -1.9°/sec

15、 : 􀂆 􀂆 􀂆 °/s 3.8 正流试验. Test 11.11. 10,0°/sek 5,0°/sek 13,0°/sek : Positive flow test. Test 11.11. 10.0°/sec 5.0°/sec 13.0°/sec : 􀂆 􀂆 􀂆 °/s 3.9 负流试验 11.12. -6,5°/sek -4,0°/sek -9,0°/sek : Nega

16、tive flow test. Test 11.12. -6.5°/sec -4.0°/sec -9.0°/sec : 􀂆 􀂆 􀂆 °/s 3.10 正弦试验. Test 11.13. 物理变频 启动变频 Sine test. Test 11.13. Pitch, ActPitch, Ref: Physical pitch: 􀂆 􀂆 􀂆 􀂆 􀂆 􀂆 4. 旋转Rotation 4.1 上风向偏航

17、. 取消服务模式. Yaw up-wind. Leave the service-mode. 􀂆 􀂆 􀂆 4.2 RPM 正弦试验 11.19. 发电机RPM,Act=GenRPM,Ref: RPM sine test. Test 11.19. GenRPM,Act=GenRPM,Ref: 􀂆 􀂆 􀂆 4.3 RPM 逐步试验. Test 11.19. GenRPM,Act=GenRPM,Ref: RPM step test. Test 11.19. GenRPM,Act=GenRPM,

18、Ref: 􀂆 􀂆 􀂆 备注:4.4 、4.5试验仅适用于50米或更高的塔身,且风速大于6.5 m/s.Note: Tests 4.4 and 4.5 are only performed on turbines with 50m towers or higher, when the wind speed is above 6.5 m/s. 4.4发电机过速试验Test 11.21. 参见 “报警RPM操作”. Test of generator overspeed. Test 11.21. Note “Alarm rpm act” 风机型号容量 频率 报警RPM公差􀂆 􀂆 􀂆 V52 850 kW 50 Hz 1950 1910-1990 RPM 60 Hz 2340 2300-2380 R

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论