




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、CONTINUOUS IMPROVEMENT GP-8 PURPOSE: GP-8 defines the supplier's responsibility to have an on-going process for continuously improving the product by improving manufacturing processes to reduce variation and to insure the process has capability and stability over time. It outlines the customer e
2、xpectations for the suppliers after a part has satisfactorily completed Production Part Approval Process (PPAP) and Early Production Containment (GP-12). (See page 8.)1.0 SCOPE - The GP-8 procedural criteria applies to all General Motors suppliers, including General Motors allied and affiliated manu
3、facturing operations, and is applicable for all parts and materials even when the customer has not requested data to be provided.2.0 BASIC QUALITY REQUIREMENTS - All suppliers are required to have in place quality systems that insure parts shipped to the customer meet specification. Further they are
4、 expected to have an action plan and the necessary controls to maintain and improve the process capability of designated key product characteristics (KPC's).2.1 BASIC QUALITY MEASURES - In evaluating their effectiveness in meeting the basic requirements of GP-8, the supplier should monitor the f
5、ollowing measures:A. Voice of the customer. These measures reflect quality performance as seen by the customer.· Defective parts shipped to the customer.This measure represents the number of non-conforming parts found at the customer's location, and is expressed in parts per million (PPM).&
6、#183; Compliance with GP-5. Problem Reporting and Resolution (PR/Rs) are issued by the customers for problems in connection with a supplier's quality, packaging and delivery performance. Specifically measured are timely response and the elimination of repeated nonconformance.B. Voice of the proc
7、ess. These measurements reflect quality performance as seen by the supplier at the suppliers' facility.Long term process performance on KPC's. Variation on key product characteristics reflects the variation in the process and is a result of a supplier's ability to control the input varia
8、bles of a process. Long term process performance is measured as a Ppk value.*(Note: See Chrysler, Ford and G.M. Production Part Approval Process Manual, for discussion on initial approval requirements, and ongoing minimum requirements.)· First Time Quality is a measure of a process' ability
9、 to make quality parts without scrap or rework. Whenever a supplier's process causes scrap or requires parts to be reworked there is undesirable variation in the input variables. Reducing and controlling the variation in the input variables presents an opportunity for continuous improvement.N= n
10、umber of parts started in the process S = number of parts scrapped R= number of parts to be reworked/repairedCONTINUOUS IMPROVEMENT GP-83.0 CUSTOMER EXPECTATIONS FOR THE SUPPLIERS' CONTINUOUS IMPROVEMENT PROCESS - Upon successfully meeting the criteria for exiting Early Production Containment (G
11、P-12), the supplier is responsible to have a quality system that continues to produce material over the long term that meets specifications. All suppliers are expected to measure their quality performance and work for continuous improvement on all parts. The process is to have the support and involv
12、ement of the suppliers' top leadership.3.1 GOAL OF CONTINUOUS IMPROVEMENT - The goal of the continuous improvement process is to reduce variation in the manufacturing process and to improve the quality of the parts produced. * See the Chrysler, Ford, GM Fundamental SPC Reference Manual pages 80-
13、81 for further information. 3.2 IDENTIFYING PROCESSES FOR CONTINUOUS IMPROVEMENT - Suppliers should concentrate their efforts on reduction of process variation by listening to the voice of the process and the voice of the customer.In analyzing first time quality data, the part of the process that cr
14、eates scrap or when parts require rework is the point in a process needing variation reduction.In monitoring KPCs, special and common causes of variation are identified as candidates for variation reduction.PR/Rs from the customer and an analysis of parts rejected by the customer (PPM) also can lead
15、 to the discovery of process variation that needs to be reduced.3.3 ACTIVITIES TO IMPLEMENT CONTINUOUS IMPROVEMENT - Suppliers should have an organized approach to IDENTIFYING the manufacturing processes that need to receive variation reduction efforts.For those processes identified, individuals and
16、/or quality improvement work groups should be assigned to analyze the cause of process variation and devise and implement change for improvement.The work groups should be knowledgeable in problem solving techniques and should incorporate:Error Proofing Techniques: to prevent or warn of defects.Desig
17、n of Experiments: to identify which of the process' input variables, or combinations of input variables, cause the undesirable output variable in the product.Suppliers should have a follow-up mechanism to insure items for improvement are implemented and verified.4.0 VERIFICATION OF A SUPPLIERS
18、39; CONTINUOUS IMPROVEMENT PROCESS BY THE CUSTOMER - It is expected that the supplier will maintain documentation supporting the continuous improvement activities conducted in their facilities. The customer may, at their option, review a supplier's continuous improvement efforts periodically.4.1
19、 VERIFICATION FORMAT - When the customer notifies the supplier that a verification meeting is to be conducted, the supplier will prepare his documentation showing improvement trends over time and explaining activities to support the continuous improvement effort.Further, the supplier will complete t
20、he "Supplier Continuous Improvement Status Report" (see attached sample and blank form). The purpose of the "Supplier Continuous Improvement Status Report" is to summarize, using a common format, the current status of the suppliers' parts and processes.CONTINUOUS IMPROVEMENT
21、GP-8Supplier Continuous Improvement Status Report- INSTRUCTIONS FOR COMPLETION -1. Supplier company name complete.2. Z Code is the shipping code assigned by General Motors. If other supplier numbering systems are used, place the number in this area.3. This is the number assigned by Dun and Bradstree
22、t to your location. If a CISCO number has been assigned to your location, use the CISCO number.4. This is the General Motors location where your parts are shipped.5. This is the date the status report was completed.6. This number is used for reference to the detailed data on the back of the form.7.
23、The part number for the part to be included in the report. Where families of parts have been agreed upon all parts in the family must be included.Note: If a part number changes due to an engineering change, list the new number and reference the former part number in thc "Comments" column.8
24、. The part description must agree with the part nomenclature on the part print. Note: Use this column to show when family parts are involved including less finished numbers where appropriate.9. Model Year is the model year the part is introduced.10. This is the date that the part received PPAP appro
25、val from the customer.11. The parts per million (PPM) is calculated as the number of non-conforming units divided by the number of units shipped for the reported period. This number is multiplied by one million to get the PPM value.12. This column should show the number of PR/R's issued against
26、the part number or family of parts. Any PR/R's issued against a part will be reviewed to insure that GP-5 has been followed and at timely responses have been given and problems haven't reoccurred.a. Number issued.b. Number of initial responses on-time.c. Number of final responses on-time.13.
27、 Key Product Characteristics Summary:a. The total number of KPC's assigned at the particular part number is to be numbered in this column.b. Of the total number of KPC's, those that are for attribute characteristics are to be entered in this column.c. When your control charts for attribute c
28、haracteristics (p, c, np, u charts) show a value grater than (0) zero, enter the total of these characteristics in this column.d. Variable characteristics that have a Ppk value less than 1.00 are to be counted in this column.e. Variable characteristics that have a Ppk value greater than or equal to
29、1.00 and less than 1.33 are to be counted in this column.f. Variable characteristics that have a Ppk value greater than or equal to 1.33 are to be counted in this column.g. Variable characteristics that have a Ppk value greater than or equal to 1.67 are to be counted in this column.CONTINUOUS IMPROV
30、EMENT GP-813. First Time Quality is the percent of parts which enter the process that are produced without scrap, reoperation or rework.N = number of parts started in the process.S = number of parts scrapped.R = number of parts to be reworked/repaired.Note: First Time Quality is not necessarily a co
31、ntinuous measure. The FTQ measure is developed and analyzed to identify sources of variation within the process. Later, the FTQ measure is again developed to evaluate the effectiveness of the continuous improvement efforts.14. Comments to include information concerning:· actions to get a KPC in
32、 control and/or stable.· actions to contain non-conforming parts that were shipped to the customer.· changes in part numbers due to an engineering change.· any other appropriate information. Note: If additional space is needed attach another sheet of paper and note it in the "com
33、ments" column.- KEY PRODUCT CHARACTERISICS DETAIL -13. This number is used for reference to the detailed data on the front of the form.14. The part number is to correspond to the part number on the front page.15.13. a. Up to 12 KPC's per part can be listed. If there are more than 12 KPC'
34、;s on a part use additional lines. (Corresponding lines on the front page should be skipped).b. PR is the performance ratio for variable data and is calculated asNote: For attribute characteristics enter the percent non-conforming number in this column.c.b. Ppk is the performance index for variable data and it is calculated as the minimum ofNote: For attribute ch
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 广东女子职业技术学院《微生物学(含实验)》2023-2024学年第二学期期末试卷
- 山西电力职业技术学院《汉俄翻译》2023-2024学年第二学期期末试卷
- 北海康养职业学院《财务管理案例分析》2023-2024学年第二学期期末试卷
- 云南水利水电职业学院《数据挖掘基础》2023-2024学年第二学期期末试卷
- 山东财经大学燕山学院《播音主持作品赏析与研究》2023-2024学年第二学期期末试卷
- 杭州电子科技大学信息工程学院《运动疗法技术学》2023-2024学年第二学期期末试卷
- 钟山职业技术学院《Java程序设计基础》2023-2024学年第二学期期末试卷
- 贵州护理职业技术学院《粉末冶金材料原理》2023-2024学年第二学期期末试卷
- 动物世界美术课件
- 2024年工业缝制机械项目投资申请报告代可行性研究报告
- JJF 1343-2022 标准物质的定值及均匀性、稳定性评估
- 水文学习题和答案解析
- 高效课堂新授课评价量化表
- 信和SDS2MS使用说明书
- 维修手册震旦218现场
- 画法几何与阴影透视复习题(DOC)
- 螺旋密封的设计及在流体机械中的应用
- 青岛市失业人员登记表
- 《中国好声音》全国校园海选招商方案(冠名)
- 广西安全文明施工费使用管理细则桂建质新版
- 存货质押贷款业务管理规定
评论
0/150
提交评论