1、道康宁(张家港)有限公司19万吨/年有机硅聚硅氧烷项目(二期)Dow Corning 190kt/a Siloxane Project in Zhangjiagang (phase 2)(Team A区Part A& C钢结构安装工程)(steel structure installation engineering for Part A& C of Team A area)临时用电方案Temporary Electricity Supply Plan编制Author: 审核Verifier: 批准Approver: 上海宝冶建设有限公司Shanghai Baoye Const
2、ruction Corp.Ltd一、 编制说明道康宁有机硅聚硅二期钢结构工程Team A区钢结构工程基本上全部为高强螺栓连接,现场临时用电主要是用于极小量的焊接及打磨、饮水机等少量用电设施,计划用电总功率约26KW。一级电箱不用配备(已与业主联系用博格豪森路与12区之间的配电箱编号为63)。配备一个二级电箱,多个移动式小配电箱(主要是用于砂轮机)。具体电箱布置及电缆走向见电箱布置及电缆走向图。Team A steel structure in Dow Corning Siloxane Project Phase 2 is mainly connected with high strength
3、bolt. In allusion to all construction use of power operated tools, welding machine, rotary sander, the planning for total power is about 26KW. It should not fit out the main electrical distribution container (it will use the distribution container which located between Bogehaoshen road and area 12,t
4、hat the number is 63)。It should fit out the secondary panel and many mobile distribution panels (mainly for rotary sander). Arrangement of distribution container and routing of cable meet the following schematic plan.二、电源配置走向示意图:低压配电的操作顺序如下,送电顺序:业主提供的一级电源箱宝冶二级电源箱开关箱;停电顺序相反。The electrical sequence: t
5、he main distribution containerSBCs distribution container switch box;三、电缆、电箱的配置所有电箱、电缆均以“三相五线制,三级配电二级保护,一机、一闸、一漏、一箱”的原则进行配置。All distribution boxes and cables should apply three-phase five-wire system, with three class power distribution and two-step earth-fault protection. One machine can only conne
6、cts to one switch, one leakage protection equipment and one distribution container. 四、安全用电措施 security electricity supply measure1)、电工必须经专业技术培训合格后方可进入现场进行施工。电工必须持有操作证上岗作业,严禁无证上岗作业。Electrician should take part in the training and be approved by the owner and engineering should have the certificate to
7、work.2)、所有进现场的配电箱、配电线、电缆、用电设备,必须预先经过检验、测设,合格后方可使用。不得采用残缺、破损等不合格产品。All approach distribution, wire, cable and electricity supply equipment should pass the inspection and test. It should not allow use the sub-quality products.3)、用电系统必须按规范规定设置短路、漏电保护。 The electricity supply system should accord with th
8、e specification to set up the cutting-out and protection for leakage.4)、配电装置必须设端正、牢固,不得拖地放置;周围不得有杂物、杂草;进线端必须做固定连接,不得用插座、插头做活动连接;进出线上严禁搭、挂、压其它杂物。The distribution device should set up the correctitude and firm, it should not lay-aside on the ground; the round of the distribution device should not have
9、 the natural grass and sundries; it should firm lead-in end, it should not move the connection with the plug and attachment plug. The sundries should not allow hung and press on the wire.5)、移动式配电装置及用电设备迁移位置时,必须先将其前一级电源隔离开关分闸断电,严禁带电搬运。When portable-type distribution device and the electricity supply
10、equipment move the location, it should switch off. 6)、用电设备严禁溅水、浸水,已经溅水或浸水的用电设备必须停电处理,未断电时,严禁徒手触摸和打捞。Splashing water and water strictly prohibited on the equipment, the equipment which already has the splashing water and water should switch off the power to deal with the water. Touch and fishing stri
11、ctly prohibited when the power is on.7)、建立技术交底制度及相应的档案,通过技术交底提高各类人员安全用电意识和水平。建立电气巡查、维修、拆除制度。It should establish the system for technique hand-over and relative fire to improve the consciousness of electricity supply. It should establish the system for go on a tour, maintain and dismantle.8)、动火或动电焊前应
12、对周围环境进行检查,如发现有易燃、易爆或电缆、光缆等敏感性物质应进行有效保护方可进行。It should be checked the surrounding environment before weld. It found the explosive, cable, fiber optic cable, ect. It should be protected to work.9)、,电焊专业人员进入作业现场,作业人员一定要穿戴好防护用品并应戴好防护镜或防护面罩。When entry in the site, the worker should wear the protection goo
13、ds, the welder should wear the protective glasses and protective mask.10)、焊机接地要良好,防止触电事故发生The welder earth in good condition, it should prevent the accident for electroshock.11)、焊接完后及时关闭焊机,将焊钳放在绝缘物品上或悬挂起来,不得与构件接触。It should switch off the weld machine; the welding tongs should put on the insulator or
14、 hang on. Dont touch the member.12)、作业区内必须配有可扑灭电器火灾的灭火器,作业区不得有易燃、易爆物品,防止火灾等发生。It should equip with annihilator, it should not have the tinder to prevent the fire.13)、施工场地注意文明施工,安全通道畅通,电焊线堆放整齐,保证施工现场的整洁。It should attend the civilization construction. The members and construction material should pile regular. It should clean the rubbish and keep the orderliness on site.14)配电箱、开关箱要合理设置,避免不良环境因素损害和引发电气火灾,其装设位置应避开污染介质、外来固体撞击、强烈振动、高温、潮湿、水溅,以及易燃易爆物The configuration of distribution box and switch box should be suitable. Avoid damage and fire
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年注册建筑师专业知识考核试卷(建筑设计与时代特征)
- 非遗传承中的社区参与与文化认同
- 基于模拟医学教育的临床能力培养
- 儿童行为心理学解析
- 创新引领业务前行
- 临产的处理原则及护理措施
- 舞蹈魅力与初中生活
- 出资转让协议书
- 2025授权代理在线直投广告合同模板
- 财务资产管理培训
- 高分子材料完整版课件
- 空间解析几何教案
- 2022年商务标技术标最全投标文件模板
- TFDS系统介绍(济南)
- 滚子链链轮的基本参数和主要尺寸
- 青海省基本医疗保险门诊特殊病慢性病病种待遇认定表
- 幼儿园组织构架图-及工作流程
- 维氏硬度计作业指导书
- 酒店各部门员工考核标准评分表
- JJG 162-2019饮用冷水水表 检定规程(高清版)
- 输出轴零件的机械加工工艺规程
评论
0/150
提交评论