版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Project name, part nameESI CompanyReported by:When: Version:Part thumbnailDFM report before MCF Phase整理课件Summary of opening critical issues Last Filename (version)Related aspectsIssue descriptionProposalClosed (date)Gate solution Main wall thickness optimization Part released Mold close Agreed produ
2、ct feasibility (to be signed) nameComments dateDFM Supplier (Mold maker)mold engineer (NPI)snapshot of email about parts development plan from Philips mold estonesdatePCFWkMCFWkPCWkPart development plan4: Outputmolding studyP.E1: proposed molding solution for single part.10E2: proposed M
3、old layout & injection machine11 E3: (output detail)12E4: Conclusion about current wall thickness design135: Output-mold construction studyF1: proposed sequence of surfaces released14f1.1 (output detail)15F2: proposed sequence of surfaces closing16f2.1: (output detail)17F3: Conclusion about mold con
4、struction of current design186: Postscript1: Statusp.Summary of opening critical issues 2Part development plan32: Table of content43: Information InputA: Geometry received5 A1: Geometry delivery history record6B: material decision7C: Visual surfaces requirement8D: Assembly relationship9Table of Cont
5、ent A: Geometry received (updated 3D) product overview (size & appearance, features)InputInputA1: Geometry delivery history recordNo.DateFile namethumbnails B: Material selection for this part InputItem 1st shot2nd shot (if needed)1Resin family name 2Trade name 3Resin manufacturer 4Additives (glass,
6、 mineral, etc.) 5Recommended shrinkage rate (range) 6Index of Melt Flow g/ min 7Recommended Melt temperature C 8Recommended Mold temperature C 9Specific Gravity (density) 10 Color/ transparency 11 Micro-Structure12 Other character C: Visual surfaces requirementInputInputD: Assembly relationship: sho
7、w pictures about this part to assembly with which parts in the product.Proposal agreed byName:OK / NOKcommentsDate (yyyymmdd)mold engineerproduct designer (MDD)Proposal properly implemented or notcheck by supplier OK/NOKFile namedateE1: proposed molding solution for single part (proposed gate positi
8、on, method & size, runner) + (current wall thickness distribution)Proposal agreed byName:OK / NOKcommentsDate (yyyymmdd)mold engineerproduct designer (MDD)Proposal properly implemented or notcheck by supplier OK/NOKFile namedateE2: proposed Mold layout & injection machineProposal agreed byName:OK /
9、NOKcommentsDate (yyyymmdd)mold engineerproduct designer (MDD)Proposal properly implemented or notcheck by supplier OK/NOKFile namedateE3: (output detail)E4: Conclusion about current wall thickness designProposal agreed byName:OK / NOKCommentsDate (yyyymmdd)mold engineerproduct designer (MDD)Proposal
10、 properly implemented or notcheck by supplier OK/NOKFile nameF1: proposed sequence of surfaces released (including proposed parting lines.)agreed byName:AgreeOr disagreecommentsDate (yyyymmdd)mold engineerf1.1: (output detail)agreed byName:AgreeOr disagreecommentsDate (yyyymmdd)mold engineerF2: prop
11、osed sequence of surfaces closingProposal agreed byName:OK / NOKCommentsDate (yyyymmdd)mold engineerproduct designer (MDD)Proposal properly implemented or notcheck by supplier OK/NOKFile nameCommon question: will parting surfaces be secured enough during mold closing?Proposal agreed byName:OK / NOKC
12、ommentsDate (yyyymmdd)mold engineerproduct designer (MDD)Proposal properly implemented or notcheck by supplier OK/NOKFile namef2.1: (output detail)agreed byName:AgreeOr disagreecommentsDate (yyyymmdd)mold engineerproduct designer (MDD) F3:conclusion about mold construction of current design This rep
13、ort should not be used accordingly for mold making once any information input remarked in segments A,B,C D changed.Note: 1: gate solution hasnt been agreed by designer. (gate position, method & size; runner) 2: there are main wall thickness issues. (uneven main flow tunnel (injection & packing), thin wall part (injection), cooling) 3: solution of part released hasnt been agreed by NPI mold ENG. (sequence of surf
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 劳保用品使用记录表
- 全国数控大赛实操试题及答案
- 一例肥胖症患者的护理个案
- 高处作业平台维护规程
- 饮料生产设备维护保养计划方案
- 医养结合机构服务标准专业解读
- 会议室管理制度
- 化妆品禁用物质快速检测技术
- 2026年快餐店炸鸡炉维护服务协议
- 关节肿瘤护理查房
- 2026年黑龙江省《保密知识竞赛必刷100题》考试题库带答案详解(基础题)
- 2026乌鲁木齐市招聘警务辅助人员(1134人)建设笔试备考试题及答案解析
- 内蒙古呼和浩特市北兴产业投资发展有限责任公司招聘笔试题库2026
- DB13(J) 148-2012 建筑地基基础检测技术规程
- 重庆市第一中学2024-2025学年七年级上学期小升初数学真题试题(原卷版)
- JT-T-760-2009浮标技术条件
- 学术交流英语(学术写作)智慧树知到期末考试答案章节答案2024年哈尔滨工程大学
- 充电桩运营平台方案
- JGT366-2012 外墙保温用锚栓
- DB63∕T 1723-2018 石棉尾矿污染控制技术规范
- 年产5万吨乙酸乙酯生产工艺的设计
评论
0/150
提交评论