




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Makeblock Ultimate Robot Kits - Ball LauncherIntroductionThe Ball launcher is one of the Ultimate robot. You can control your robot with your smart device through a Bluetooth connection. And by adjusting the rotation of the motor launch a ball.For the installation steps, please do as follows. If you
2、 have any question about it, please post your trouble on the forum, I would give a replay.Now, lets startStep 1Materials list4*Threaded Shaft 4*393*D Shaft 4*502* Shaft Collar 4mm4*Shaft clamping hub 4mm2*Beam 0808-882*Beam 0824-1282*Timing pulley Slice 90T-New1*Motor Bracket 25V21*Motor Bracket 37V
3、22*Plate D1*Bracket P31*Timing pulley 18T1*Gear m1*1630*Screw M4*827*Screw M4*142*Screw M4*164*Screw M4*221*Screw M4*353*Beam 0808-1842*Beam 0824-1442*Beam 0824-961*Beam 0824-802*Beam 0824-642*Base board plate V1.119*Hex nuts M4-N6*Screw M3*812*Hex Socket screw4*Plastic ring 4*7*25*Nylon M41*Gear m1
4、*801*Timing pulley 90T1*Timing belt 123T 98mxl1*DC Motor 25mm V2.01*DC Motor 37mm V2.03*Bracket 3*311*Bracket 3*61*Rubber band1*Plate 7*9Electronic materials1*Makeblock Orion1*6P6C RJ11 cable 20cm1*Me Bluetooth Module V2.01*Battery Bracket6*AA Battery 1.5VStep 2Tools1.5mm Hexagonal Screwdriver3mm Sc
5、rewdriverSpannerStep 3Building the base:Materials:2*Beam 0824-1442*Beam 0824-1282*Beam 0824-961*Beam 0808-8810*Screw M4*144*Screw M4*224*Hex nuts M4-NProcedure:1. Install the Beam 0808-88 on Beam 0824-128.2. Assemble a rectangle by 2*Beam 0824-128, 2*Beam 0824-144 and 8*Screw M4*143. The Beam 0824-9
6、6 vertically mounted on the Beam 0824-144 with 4*Screw M4*22 and 4*Hex nuts M4-NStep 4Assembling transmission of DC motor 37mmMaterials:6*Screw M4*144*Screw M3*85*Hex Socket screw4*Hex nuts1*Beam 0808-881*Beam 0824-801*D Shaft 4*502*Shaft clamping hub 4mm2*Threaded Shaft 4*391*Timing pulley 90T2*Tim
7、ing pulley Slice 90T-New1*DC Motor 37mm V2.01*Motor Bracket 37V21*Timing belt 123T 98mxl1*Timing pulley 18T1*Plastic ring 4*7*2Procedure:1. Install the two Timing pulley Slice 90T-New and a Shaft clamping hub 4mm on the Timing pulley 90T by using two Hex Socket screws, four Screws M4*14 and two Hex
8、nuts.2. 2*Threaded Shaft 4*39 are installed on both ends of Beam 0808-88 and a Shaft clamping hub 4mm is installed in the middle of Beam 0808-88.3. Install 1 and 2 on the top of the hole by using a D shaft.4. Install Motor Bracket 37V2 and Timing pulley 18T on DC Motor 37mm V2.0 with 2*Threaded Shaf
9、t 4*39 and a Hex Socket screwStep 5Assembling transmission of DC motor 25mmMaterials:1*DC motor 25mmV21*Motor bracket 25V21*Shaft clamping hub 4mm1*D Shaft 4*504*Hex Socket screw2*Screw M3*81*Bracket 3*31* Shaft Collar 4mm1*Timing pulley 18T1*Timing pulley 90T4*Screw M4*14Procedure:1. Install the Mo
10、tor bracket 25V2 on the DC motor 25mmV2 by using 2*Screw M3*82. Make the motor shaft through the third from the bottom up of the hole, and install Timing pulley 18T on the motor shaft.3. Install the Shaft clamping hub 4mm and Bracket 3*3 on both sides of Timing pulley 90T.4. Install 3 on the top of
11、the hole by using D shaft, shaft collar and three Hex Socket screws.Step 6Make a launcherMaterials:2*Beam 0808-1842*Beam 0824-642*Plate D1*Bracket P32*Bracket 3*32*Threaded Shaft 4*3915*Screw M4*82*Screw M4*141*Screw M4*355*Hex nuts2*Plastic ring 4*7*21*Nylon M4Procedure:1. One of Plate D and Bracke
12、t P3 mounted on one end of the two Beam 0824-642. Put Beam 0808-184 through Plate D, then install Threaded Shat 4*39 on the first and the eighth holes of Beam 0808-184.3. Install Nylon M4 on Plate D with 2*Plastic ring 4*7*2, a Screw M4*8 and a Screw M4 *35. Then install Plate D on the other end of
13、the two Beam 0824-64.4. Install 2*Bracket 3*3 on both sides of Beam 0824.5. Install Beam 0808-184 on the right of Bracket 3*3.Step 7Assembly of electronic modulesMaterials:6*Hex nuts12*Screw M4*84*Screw M4*144*Nylon M41*Makeblock Orion1*6P6C RJ11 cable 20cm1*Me Bluetooth Module V2.01*Battery Bracket
14、6*AA Battery 1.5V2*Base board plate V1.1Procedure:1. Install Makeblock Orion on one of Base board plate V1.12. Install four Nylons on the Base board plate V1.1 by using four Screw M4*8.3. Install battery bracket on the other Base board plate V1.1.4. Install the Base board plate V1.1 on the Nylon M4.
15、5. Install the Me Bluetooth Module V2.0 on the Beam 082496 of the base.Step 8Assembling everything up frontMaterials:1*plate 7*91*Bracket 3*61*Beam 0808-1846*Screw M4*142*Screw M4*164*Screw M4*88*Hex nuts M41*Plastic ring 4*7*21*D Shaft 4*503*Hex Socket screw1* Shaft Collar 4mm1*Shaft clamping hub 4
16、mm1*Rubber bandProcedure:1. Install D Shaft 4*50 on Beam 0824-96 by using Shaft Collar 4mm and Shaft clamping hub 4mm2. Install Bracket3*6 on DC motor 37 mm, then install on the Shaft clamping hub.3. Install the Rubber band on Timing pulley 18T and Timing pulley 90T, then install Bracket 3*3 of the launcher4. Install the other Bracket 3*3 of the l
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 游戏动手操作的幼儿园试题及答案
- 幼儿园数学探索性学习考试试题及答案
- 注册土木工程师考试注意事项与试题及答案
- 教师教育教学反思中的挑战与对策试题及答案
- 春游小学面试题及答案
- 半自动打孔机采购合同范本
- 劳务加工类合同标准文本
- 新能源汽车技术专业知识测试试题及答案
- 安全工程师建筑施工质量管理的试题及答案
- 家具行业设计中绿色产业链的构建与实践探讨试题及答案
- 2025年福建省福州市电子信息集团有限公司招聘笔试参考题库含答案解析
- 2025年人博会贵州出版集团有限公司招聘笔试参考题库含答案解析
- 非标自动化培训资料
- 2024年山东省公务员录用考试《行测》真题及答案解析
- 交通疏解方案完整版
- 中考物理模拟试卷讲评课课件
- DB32T 3921-2020 居住建筑浮筑楼板保温隔声工程技术规程
- 流动团员管理服务告知书
- Excel在财务管理中的应用(第五版)第10章综合案例
- 高考理综试题答题技巧方法!课件
- 行书典范《兰亭序》鉴赏PPT共32页课件
评论
0/150
提交评论