1、FRP overlay proceduresFile Number:MC-09-5Version: A3Review: Date: JIANGSU JIAOYAN MARINE EQUIPMENT CO., LTD.(JIANGYIN XINJIANG FRP CO., LTD.)FRP overlay proceduresI. DescriptionThe procedures for FRP hand lay-up as to the environmental conditions as stipulated in principle and the necessary instruct

2、ions. Environmental condition operation requirements1. Ply the preparation and examination before the operation1) Whether the location and external operations for the operator bracket construction is solid and reliable, is clean. 2) The operator tools and equipment should be complete, such as brush,

3、 including plates, pressure stick, iron, scissors and some other essential tools, and all the tools to check compliance with requirements. 3) Protective equipment: mask, gloves, clothing, overshoes, etc. complete and clean. 4) Ventilation: the reliability of work and ensure good ventilation in the s

4、pecific operation allows the use of ventilation, but the end of the construction should be closed immediately.5) Whether the gel layer of gel coat to tack appropriate. 6) Confirm the temperature and humidity of the workshop and record it.7) Confirm the Resin and fiberglass material is the appointed

5、manufacturer.2.The operation procedure of lamination A Paint to the cured gel coat The resin layer added the curing agent B Part of the corner filling with resin glass fiber bundlesC Lay the chopped strand mats (first layer)D Lay the glass fibre cloth (second layer ) E Maintenance and curing F Lay t

6、he chopped strand mats (Third layer) G According to the structure H Local reinforcement and rib made I Maintenance and curing3.Lamination requirements1) Instruction: Check the operation of the workers in the operation should be preceded by "overlay operating table" came a process is alread

7、y tested and qualified inspectors, prohibit the unauthorized operation. 2) Make sure gel coat has cured (with appropriate non-stick hand, cured gel coat is generally not more than 24 hours) to shop floor. 3) Overlay the first layer of resin used to add the right amount of gel coat color with the sam

8、e pigment paste, brush with infiltration in the transaction layer of thick coated resin-rich layer, then a layer of carpet surface. 4) For right angle, acute angle, there are no sharp corners of glass fiber cloth with a layer of gel coat can be filled in the acute area of glass fibers to form a cert

9、ain angle, then placement. 5) The first layer of ply should be very careful to repeatedly remove air bubbles and fully bonded with the gel coat layer, in order to avoid the formation of bubbles or other defects in products, mutual recognition of defect-free operator before laying a second layer, thi

10、s time by overlay structure required to achieve the required thickness, such as sub-sub overlay interval shall not exceed 24 hours.4. Shop floor quality control operation1) fabric placement application brush, including foam board or off the roll compaction and deaeration, along the radial fiber clot

11、h to the other end by the end of the regular press pressure, including the roll to eliminate air bubbles, such as fiber mats, with deaeration roll compaction and deaeration, including board hanged. 2) Should pay attention again before the overlay layer of fabric have been infiltrating resin, non-con

12、vex layer and the bubble phenomenon. 3) Does not allow stacking resin and fabric wrinkling phenomenon. 4) Transfer of fiber cloth between fabric width control 40-50mm, not allowed to butt joint, layer make meet dislocation, the space not less than 100-150mm.5) 4-5 Park in resin viscosity, the viscos

13、ity is too low infiltration deaeration easy, but it can cause the resin flow is not enough bonding strength of resin or glass fiber cloth shortage.6) The general control of resin content of 70% glass fiber mat, glass fiber cloth 50%. 7) Overlay interval is generally less than 24 hours, otherwise it

14、is secondary bonding, hair treatment should be playing, but no matter-like, as in the cured laminate or gel overlay, the first layer of glass fiber mat should be .8) For the keel reinforced, the joint position of thicken plate ,keel covered plate and shell plate is not allowed sudden change which sh

15、ould be on both sides of the filter to form gradually incline to thinning one by one, the layer space is general 10-15mm.5. Secondary bonding1) Secondary bonding is cured and already more than 24 hours after the fiberglass laminate on the shop floor, in this way in principle for the construction of

16、age on the hull, but the ribs in the repair of composite structure production and use. 2) Secondary bonding as follows: A. Secondary bonding adhesive surface should be increased as much as possible, preferably on its surface when the construction has not yet fully cured. B. Completely hardened after

17、 the second adhesive bonding surface must be clean of grease, stolen goods, such as grinding with the grinding surface to play, or chisel to remove the surface, such as glass fibers exposed after construction. C. Second, when the first layer of ply should be chopped fiber mat. D. Hull version with a

18、 two bonding, the bonding on both sides should give full play 100MM hair, bonding thickness of 1.45 times the thickness of the substrate.6. The production of vertical and horizontal ribs1) The end of the hull layer of paste after curing, according to the chart position of pre-formed core material 2

19、vertical and horizontal ribs, and placed in place with resin.2) All longitudinal material together into a whole, does not allow intermediate discontinuity, such as ribs and rib panels with cross, we must first longitudinal rib or ribs materials do. 3) When using foam core material, the perforation i

20、n the bulkhead or water to be set watertight layer, made of wood embedded in the street to pick up wood and other continuity. 4)Vertical and horizontal cross parts are tapered, the glass fiber arrangement and bonding is very difficult, especially not the same height, if they have gaps or pits will b

21、e broken because, should mainly refer to the following:加强层转角加强面层加强7. Embedded parts of the construction1) On outfitting the boat and some ancillary parts for the installation of beautiful and maintain a reliable water tightness, the fastening method commonly used embedded iron or hardwood to solve.2

22、) Arranged according to the requirements of many embedded components, and shall ensure the water tightness of embedded parts, embedded parts of the construction methods shown in Figure:预埋件玻璃钢包覆=2-3玻璃回丝泡沫塑料=15-20玻璃钢外壳8. Boat shell, roof, and most pieces of ply to, the main inspector shall supervise a

23、nd inspect the next operation is completed, it is timely in the "shop floor operating record" signed by the appropriate project acceptance, the vertical and horizontal aggregate, embedded, etc. operation, inspection and must fill out the "hull quality inspection table." 9. FRP mo

24、del 1) Every three months to make the FRP sample.2) The production model is generally set to die on the outer hull extends from 45 ° on the template, such as unconditional in the same plant can be carried out under the same conditions. 3) The dimensions of 500X500, dwarf template should be slig

25、htly larger. 4) Each sample should be marked hull number, date of molding. 5) When necessary, in the presence of ship survey carried out or ship inspection should be specified at any time to increase production model. Attachment: Overlay operations closed record form QR09-4Boat hull quality inspecti

26、on table QR09-6A Open boat hull quality inspection table QR09-6BLamination operation record tableProduct No.Product NamePart NameCraft document No.:Mould condition Good Need to repairOperation contentOperatorDate Temperature HumidityStart and end timeInspection resultInspector Remarks Mould prepare-

27、Gel coat painting Lay the first glass fiberLay the middle layerTotally layerLay the reinforced layerTotally layerThe actual structure:Demould-Inspection result Construction surveyor: Date:The hull quality inspection table of totally lifeboatProduct No.Product NameNo.Inspection itemOperator Date Inspection resul

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论