1、 机组热态启动热机操作票 Unit Hot Start Hot Turbine Working Permit 编号No.: 第 1 页 共 54 页(1/54)操作开始时间Operation start-up time: 年Y 月M 日D 时H 分 M 结束时间Ending time: 日D 时H 分M操作任务:# 机组热态启动热机操作票Operation Procedure:#_Unit Hot Start Hot Turbine Working Permit序号Serial危险点分析Danger Point Analysis预控措施Measures1锅炉上水时金属应力过大While boi
2、ler water feeding to boiler, metal stress too big1、上水温度一般不超过70,正常时给水母管压力与汽包压差控制在23MPA,要防止给水母管超压Water feeding temperature less than 70, normally water feeding header pressure and steam drum pressure differential stay at 23MPA under control, prevent the water feeding header over-pressure2、严格按规程控制上水流量和
3、速度Control water feeding flow rate and speed according to the procedure11投盘车时齿轮损坏Gear broken while turning1、投盘车前应手动将盘车挂闸,并确认盘车确已挂闸啮合良好Hand switch off while turning, to confirm turning is switched off and geared well.12开启轴封供汽门时管道振动During gland sealing start up vibration for the pipeline1、稍开轴封供汽门,保持0.0
4、120.02MPa 至少暖管10min后全开,注意充分疏水Open the gland sealing steam supplying valve slightly, maintain 0.0120.02MPa for pipe preheating for 10min before fully open, be attentive to water drainage.操作人 (Operator) _ 监护人(Supervisor) _ 值班负责人(Responsible):_ 值长 (Shift-chief):_ 机组热态启动热机操作票 Unit Hot Start Hot Turbine
5、Working Permit 编号No.: 第 2 页 共 54 页(2/54)操作开始时间Operation start-up time: 年Y 月M 日D 时H 分 M 结束时间Ending time: 日D 时H 分M操作任务:# 机组热态启动热机操作票Operation Procedure:#_Unit Hot Start Hot Turbine Working Permit序号Serial危险点分析Danger Point Analysis预控措施Measures13启动高备泵时无油压While start the high standby pump, having no oil p
6、ressure1、排尽油系统内的空气Air in the system exhausted14低压缸排汽门破裂Steam venting valve fracture for low pressure cylinder1、真空抽至40KPa以上时再开启主、再热蒸汽管道疏水,开疏水时注意真空变化When the vacuum is extracted to above 40KPa,start the main or reheating steam pipeline for water drainage, attentive to the vacuum changing when water dr
7、ainage opening2、真空抽至70KPa以上时再投入旁路Put the bypass into use when the vacuum is extracted to above 70KPa15投入高、低压旁路时管道振动Pipe vibration while putting high or low pressure bypass into use.1、锅炉压力至0.5MPa 以上时投入旁路Put bypass into use while the boiler pressure reaches above 0.5MPa2、高压旁路投入时应充分暖管疏水While the high p
8、ressure bypass put into use, have the pipe preheated enough for water drainage3、投入高、低压旁路时应缓慢开启Slowly put the high or low pressure bypass into use操作人 (Operator) _ 监护人(Supervisor) _ 值班负责人(Responsible):_ 值长 (Shift-chief):_ 机组热态启动热机操作票Unit Hot Start Hot Turbine Working Permit 编号No.: 第 3 页 共 54 页(3/54)操作
9、开始时间Operation start-up time: 年Y 月M 日D 时H 分 M 结束时间Ending time: 日D 时H 分M操作任务:# 机组热态启动热机操作票Operation Procedure:#_Unit Hot Start Hot Turbine Working Permit序号Serial危险点分析Danger Point Analysis预控措施Measures16汽轮机冲动时弯轴与水冲击Shock existing between bending shaftand water. 1、汽机冲动前降低真空保护外的所有保护投入,胀差、上下缸温差合格方可冲转When s
10、tart the turbine shock, reduce the all protection except the vacuum protection, expansion differential, the temperature differential between the upper and bottom cylinder are qualified and impulse starting2、冲动前汽温,汽压必须合格,保证有50以上的过热度,疏水畅通Before impulse starting, the steam temperature and pressure have
11、 to be qualified, ensure more than 50 super-heating degree and smooth water drainage.3、轴封供汽温度合格,送轴封和抽真空前必须连续盘车Gland sealing steam supply temperature qualified, continuous turning executed before supplying gland sealing and vacuum extraction 4、启动过程中机组应正常,当振动大跳闸时,应立即破坏真空紧急停机,查明原因The unit should be nor
12、mal during startup, when there is vibration and big trip, destroy the vacuum immediately to shutdown urgently, and check the reason for that.5、启动过程中,汽温急剧下降应打闸停机During start-up,if steam temperature decreases acutely, switch off to shutdown.17机组冲动过程的振动Vibration during unit impulse 1、迅速平稳的通过临界转速,当振动跳闸时
13、,应立即回到盘车状态查明原因,不得降速暖机和硬闯临界转速。While exceeding the critical rotation speed and tripping for the vibration happens, change into turning state to check the reason for that, never speed down to preheat or keep running while exceeding critical rotation speed.操作人 (Operator) _ 监护人(Supervisor) _ 值班负责人(Respon
14、sible):_ 值长 (Shift-chief):_ 机组热态启动热机操作票 Unit Hot Start Hot Turbine Working Permit 编号No.: 第 4 页 共 54 页(4/54)操作开始时间Operation start-up time: 年Y 月M 日D 时H 分 M 结束时间Ending time: 日D 时H 分M操作任务:# 机组热态启动热机操作票Operation Procedure:#_Unit Hot Start Hot Turbine Working Permit序号Serial危险点分析Danger Point Analysis预控措施Me
15、asures18机组冲动后盘车脱不开The turning gear keep engaged after unit impulse1、设专人监视,当盘车未能脱开时,立即打闸停机Supervisor appointed ,when turning gear engaged, instantly switch off to shutdown19机组定速后停止调整油泵和润滑油泵时,调整油压润滑油压力下降When unit stay at steady speed and stop the adjustment of the oil pump and lube oil pump, lube oil
16、for oil pressure adjustment decrease its pressure.1、 停油泵时密切注意油压变化,如油压下降及时启动油.迅速查明原因Pay attention to the oil pressure changing tightly when stopping the oil pump, if the oil pressure lower ,start up the oil ,check the reason for that.20油温波动大Oil temperature fluctuate greatly1、冲动时设专人调整润滑油温,保证油温在3545 ,防
17、止油温波动过大Special persons appointed to adjust the lube oil temperature during impulse to ensure the temperature maintaining at 35 to 45 centigrade, to prevent it from fluctuating greatly.操作人 (Operator) _ 监护人(Supervisor) _ 值班负责人(Responsible):_ 值长 (Shift-chief):_ 机组热态启动热机操作票 Unit Hot Start Hot Turbine Wo
18、rking Permit 编号No.: 第 5 页 共 54 页(5/54)操作开始时间Operation start-up time: 年Y 月M 日D 时H 分 M 结束时间Ending time: 日D 时H 分M操作任务:# 机组热态启动热机操作票Operation Procedure:#_Unit Hot Start Hot Turbine Working Permit序号Serial危险点分析Danger Point Analysis预控措施Measures21发电机并列后风温升高Air temperature ascending after generators parallel
19、1、发电机并列后,视风温情况,及时开启投入氢冷器,开启出口门前放空气门,排尽空气When generators come to parallel, depending on the air temperature, in time start up and put the hydrogen cooler into use, start up the air venting valve at the outlet to exhaust all the air.22汽轮机负荷过程中出现振动Vibration in turbine load1、发现各轴承振动增大时,停止加负荷或减少负荷直至振动消除为
20、止,并在此负荷下暖机30min,再进行加负荷.When we find the vibration for each bearing increases, stop increasing or reducing load until the vibration disappears, and preheating under the load for 30 minutes, and then increase the load.23机组启动过程中上,下缸温差超过规定值Temperature differential between upper and down cylinder exceeds
21、 specified value during start-up.严格按规程要求的启动曲线控制加负荷速度及暖机时间,如温差超过51,并继续上升且无法消除时,应立即停机。Obeying the start-up curve strictly to control load increasing rate and preheating time, if the temperature differential exceeds 51 centigrade, and continue to ascend and cant be eliminated, shutdown quickly.24关闭疏水手动
22、门时的人身伤害Personnel safety threatened while closing water drainage manual valve1、不要面对疏水门,以免由于盘根嗤开造成烫伤Dont stay in face of water drainage valve to avoid burns from the packing opened.操作人 (Operator) _ 监护人(Supervisor) _ 值班负责人(Responsible):_ 值长 (Shift-chief):_ 机组热态启动热机操作票 Unit Hot Start Hot Turbine Working
23、 Permit 编号No.: 第 6 页 共 54 页(6/54)操作开始时间Operation start-up time: 年Y 月M 日D 时H 分 M 结束时间Ending time: 日D 时H 分M操作任务:# 机组热态启动热机操作票Operation Procedure:#_Unit Hot Start Hot Turbine Working Permit序号Serial操作内容Operation Procedure时 间Time操作人一、锅炉点火前的检查与准备:Inspection and preparation before ignition for boiler1影响机组启
24、动的检修工作已结束,相关工作票已终结,对机组主、辅设备进行全面检查,机组符合启动条件The overhauling affecting the unit start-up has finished, relative working permit has expired, make overall inspection for main or auxiliary equipment of the unit which should meet the requirement of start-up .2主、辅机各保护联锁试验完成且合格,各保护、报警及所有仪表均应正常投入Protection in
25、terlock test for main or auxiliary machine has been finished and qualified, every protection, alarm and all the gauges should work normally3热控各远方控制、监测报警系统(包括联锁保护)以及各就地控制系统都正常完好The thermal control remote control,monitoring alarm system including interlock protection and local control system working n
26、ormally4各有关的转动机械设备(包括备用设备)、电磁阀、电动阀门等控制电源、操作电源、仪表电源等均应送电且经试操作正常Every running machine equipment including standby equipment, solenoid valve, electric valve(control power supply)5各辅机就地事故按钮均已复位,各辅机相关系统检查完好,符合投入条件Each auxiliary local accident should be reset, relative system for each auxiliary machine sh
27、ould meet the requirement of the starting up.操作人 (Operator) _ 监护人(Supervisor) _ 值班负责人(Responsible):_ 值长 (Shift-chief):_ 机组热态启动热机操作票 Unit Hot Start Hot Turbine Working Permit 编号No.: 第 7 页 共 54 页(7/54)操作开始时间Operation start-up time: 年Y 月M 日D 时H 分 M 结束时间Ending time: 日D 时H 分M操作任务:# 机组热态启动热机操作票Operation P
28、rocedure:#_Unit Hot Start Hot Turbine Working Permit序号Serial操作内容Operation Procedure时 间Time操作人6检查汽机手动遮断手柄在“遮断”位置,机械超速试验手柄在“正常”位置,盘车装置手柄在“停用”位置Check the turbine manual trip handle should stay at trip status, the machine overspeed test handle should stay at normal status, turning gear handle should sta
29、y at stop status.7辅汽系统暖管结束后投入运行,维持辅汽联箱压力在0.650.85MPa:Auxiliary steam system undergoing preheating and then put into use, maintain its header pressure at 0.650.85MPa.8联系值长,要求化学加强制水,保证机组启动用水足够Contact the shift chief, require for chemical strengthening water preparation, ensure enough water for unit st
30、art-up.9检查主机润滑油油箱油位 mm,小机润滑油油箱油位 mm,油质是否合格,否则投入滤油系统运行Inspect the main motor lube oil tank level_mm, small motor lube oil tank level_mm, and whether oil is qualified or not,or else put the oil filtration system into use.操作人 (Operator) _ 监护人(Supervisor) _ 值班负责人(Responsible):_ 值长 (Shift-chief):_ 机组热态启动
31、热机操作票 Unit Hot Start Hot Turbine Working Permit 编号No.: 第 8 页 共 54 页(8/54)操作开始时间Operation start-up time: 年Y 月M 日D 时H 分 M 结束时间Ending time: 日D 时H 分M操作任务:# 机组热态启动热机操作票Operation Procedure:#_Unit Hot Start Hot Turbine Working Permit序号Serial操作内容Operation Procedure时 间Time操作人10启动主油箱排烟风机,启动交流润滑油泵和高压密封油备用泵,投入主
32、机润滑油系统运行,检查润滑油压力 MPa,油箱油位 mm,投入备用油泵联锁开关。启动小机油箱排烟风机,启动一台主润滑油泵,检查润滑油压力 MPa,油箱油位 mm,投入备用油泵及事故油泵联锁开关.Start main oil tank flue exhaust fan, start AC lube oil pump and high pressure sealing oil pump on standby, put the main machine lube oil system into use, check lube oil pressure_MPa, oil tank level_mm,
33、put standby pump interlock switch. Start the small machine oil tank flue exhaust fan, start one main lube oil pump, check the lube oil pressure_MPa, oil tank level_mm, put the standby oil pump and accident oil pump interlock switch into use.11发电机风压试验合格,启动发电机空、氢侧密封油泵,投入发电机密封油系统运行,投入备用油泵联锁开关Generator
34、air pressure testing OK, start generator air or hydrogen sealing oil pump, put the generator sealing oil system into use, put the standby oil pump interlock switch into use.12对发电机进行充氢,氢压 MPa,氢纯度 ,油氢差压 KPa Add hydrogen into generator, hydrogen pressure_MPa, hydrogen purity_,differential pressure_KPa.
35、操作人 (Operator) _ 监护人(Supervisor) _ 值班负责人(Responsible):_ 值长 (Shift-chief):_ 机组热态启动热机操作票 Unit Hot Start Hot Turbine Working Permit 编号No.: 第 9 页 共 54 页(9/54)操作开始时间Operation start-up time: 年Y 月M 日D 时H 分 M 结束时间Ending time: 日D 时H 分M操作任务:# 机组热态启动热机操作票Operation Procedure:#_Unit Hot Start Hot Turbine Working
36、 Permit序号Serial操作内容Operation Procedure时 间Time操作人13在汽轮机冲转前8小时启动主机顶轴油泵,投入备用油泵联锁开关,记录各瓦顶轴油压力:3瓦 / MPa,4瓦 MPa,5瓦 MPa,6瓦 MPa,7瓦 MPa,8瓦 MPa,。投入主机盘车运行,盘车电流 A,转速 rpm,偏心 mm,轴向位移 mm,缸胀 mm,差胀 mm,倾听机内声音正常.Start the main machine top shaft oil pump 8 hours earlier before turbine impulse, put the standby pump inte
37、rlock switch into use, make recordings of top shaft oil pressure of very bush:3bush / MPa,4bush MPa,5bush MPa,6bush MPa,7bush MPa,8bush MPa.Put the main machine turning gear into operation, turning gear current_A, rotation rate rpm,eccentricity_mm, axial displacement_mm,cylinder expansion_mm, differ
38、ential expansion_mm, listen to the sound in the turbine,and sound should be normal.14检查工业水压力正常,否则启动两台工业水泵,投入工业水系统,就地检查确认工业水用户投入正常Check the industrial water normal or not, or else start up two industrial water pump, put the industrial water system into use, make local inspection and confirmation that
39、 industrial water users start up normally.操作人 (Operator) _ 监护人(Supervisor) _ 值班负责人(Responsible):_ 值长 (Shift-chief):_ 机组热态启动热机操作票 Unit Hot Start Hot Turbine Working Permit 编号No.: 第 10 页 共 54 页(10/54)操作开始时间Operation start-up time: 年Y 月M 日D 时H 分 M 结束时间Ending time: 日D 时H 分M操作任务:# 机组热态启动热机操作票Operation Pr
40、ocedure:#_Unit Hot Start Hot Turbine Working Permit序号Serial操作内容Operation Procedure时 间Time操作人15启动一台循环水泵 循环水泵,电流为 A,投入高低速联锁开关,循环水系统投入运行,就地检查循环水泵运行正常Start one circulation pump_water circulation pump, current_A, put the high or low speed interlock switch into use ,circulation water system into operation
41、, local inspect the circulation water pump working normally.16投入开式水系统,开式水压力 MPa,开式水压力低时,检查开式水管道及循环水系统。Start up open water system, open water pressure_MPa, when open water pressure is low, check the open water pipeline and circulation water system. 17联系化学启动凝输泵,将发电机内冷水箱、闭式水箱等补水至正常水位,对凝汽器进行换水Contact ch
42、emical section to start condensate pump, 18闭式水箱水位 mm,启动 闭式泵,电流为 A,投入备用泵联锁开关,检查闭式水系统投入正常 Closed water tank level_mm, start_closed pump, current_A, standby pump interlock switch put into use, check the closed water system working normally19确认有空压机运行且仪用压缩空气系统运行正常,否则,启动一台或两台空压机( 空压机),投入仪用压缩空气系统Confirm ai
43、r compressor work normally and instrument air compressor system work normally, or else ,start one or two air compressor(_air compressor), put the instrument air compressor system into use.操作人 (Operator) _ 监护人(Supervisor) _ 值班负责人(Responsible):_ 值长 (Shift-chief):_ 机组热态启动热机操作票 Unit Hot Start Hot Turbin
44、e Working Permit 编号No.: 第 11 页 共 54 页(11/54)操作开始时间Operation start-up time: 年Y 月M 日D 时H 分 M 结束时间Ending time: 日D 时H 分M操作任务:# 机组热态启动热机操作票Operation Procedure:#_Unit Hot Start Hot Turbine Working Permit序号Serial操作内容Operation Procedure时 间Time操作人20检查凝汽器水位 mm,启动一台凝结水泵,电流为 A,压力 MPa,投入备用凝结水泵联锁开关,向除氧器上水,冲洗主凝结水系
45、统及除氧器,待水质合格后,将除氧器补水至正常水位,并投入水位自动调节Put the standby condensate pump interlock switch into use, feed water into deaerator, flush the main condensate system and deaerator, and when the water quality is qualified, deaerator make-up water goes up to normal level, and switch the water level to auto mode.21
46、联系化学化验定冷水水质合格后,启动一台定冷泵,电流 A,压力 MPa,流量 T/H,投入备用泵联锁开关,发电机定子通水,确认水压比氢压低0.035MPa以上,若水质不合格,加强定冷水换水When the stator cooling water quality is qualified through the chemical examination, start up one stator cooling pump, current_A, pressure MPa, flow rate_T/H, Put the standby pump interlock switch into use,
47、generator stator water running through, confirm the water pressure is lower more than 0.035MPa than hydrogen pressure, if the water quality is not qualified, strengthen the stator cooling water renewal.操作人 (Operator) _ 监护人(Supervisor) _ 值班负责人(Responsible):_ 值长 (Shift-chief):_ 机组热态启动热机操作票 Unit Hot Start Hot Turbine Working Permit 编号No.: 第 1
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 户外培训知识和技能课件
- 燃气工程环保与节能实施方案
- 公司矿井防灭工效率提升考核试卷及答案
- 公司气体深冷分离工理论知识考核试卷及答案
- 公司铸管制芯工岗位操作规程考核试卷及答案
- 建筑施工过程风险管理方案
- 公司玻璃及玻璃制品成型工上岗考核试卷及答案
- 生态园区景观设计实施方案
- 炉渣综合利用项目施工方案
- 建筑结构性能提升方案
- 2025银行招聘试题及答案详解
- 2025贵州册亨县招聘教师25人考试参考试题及答案解析
- 河南成人2024学位英语考试真题及答案
- 2025年淮南市大通区和寿县经开区公开招聘社区“两委”后备干部30名考试参考试题及答案解析
- 长期照护师培训考核试卷及答案
- 医保病历审核课件
- 煤矿安全规程2025版解读
- 2025年秋季开学典礼诗歌朗诵稿:纪念抗战胜利八十周年
- 军人识图用图课件
- 中医治疗腰痛
- 乙型肝炎病毒护理查房
评论
0/150
提交评论