1、Good is good, but better carries it.精益求精,善益求善。ej人工挖孔桩半模施工方案望兴景园1#、11#楼谷山·乐园经济适用房三期标段人工挖孔桩半模护壁施工方案 工程有限公司谷山·乐园经济适用房三期标段 栋2012年07月 6national rural home for the project. According to the County's general plan, integration of resources, in 2014, new Burqin County Senior Center project, the

2、 current project has been completed, internal equipment purchasing and working culture decoration is complete, start review acceptance, put into use by the end. My County is based on the basic livelihood needs to actively seek public service facilities, 2015 to declare mutual assistance in building

3、rural old happiness in Burqin County 8 projects, invested 400,000 yuan lottery ticket equipment purchased during the year for the rural mutual happiness. While actively works with development and reform Department, fighting for construction project of Burqin County disaster relief material reserves,

4、 at present the project has completed feasibility study procedures, feasibility study approval. In 2015, the County invested 500,000 yuan, perfect Muslim funeral home facilities, upgrading services and project acceptance. Meanwhile, seeking Burqin County non-Muslim funeral home works, so far the pro

5、ject has completed the project site, is for the early procedures. (VII) working steadily among others, the full implementation of the special care and placement policy. To further improve the quality of activities among others as the goal, close to military practice, deepening the County among other

6、s. During the Spring Festival, the Eid al-Adha period with condolences resident was paid 125,000 yuan forces and the soldiers back, special care and activities, while increasing work of demobilized stability control, regular or irregular visit condolence activities, understand the ideological trends

7、, solve difficulties in life, increase the spear Shield troubleshooting to resolve and implement a policy, effectively safeguarding social stability. As of now, 148 of the County issued living allowances 1.0648 million Yuan, 4 retired veteran cadres to pay health insurance premiums 10,770, pay healt

8、h insurance premiums for the 3 families of retired veteran cadres 7,800 Yuan, 70 rural veterans aged over 60 issued living subsidies of 176,000 yuan, issued for 27 veterans a one-time employment economic benefit of 1.286 million Yuan. (H) strengthen measures, promoting division names and basic power

9、. Division name: according to the autonomous region's urbanization development plans County finished Wo yimoke Xiang town, Xiang to withdraw monthly, has passed the Home Office review of the autonomous region, continued this year to complete the scope Stack Xiang Jian Zhen Xiang withdrawal of de

10、clarations, while completing yili State Government approval, reported to the Home Office for approval. Meet the needs of Burqin County's economic and social development, address some villages due to the large population base and wide distribution, is not easy to manage, as well as the jurisdicti

11、on of the new pastoral settlement from villages far, masses of inconvenience problem. I Board this year and all townships and organizational Department jointly organized, on the part of the township (town) villages (communities) splits and reorganization, achieving new villages throughout the County

12、, 11 communities 1. After adjustment, the County has jurisdiction over 7 townships (towns) 74 villages, 7 community. This year, the re-inspection work for peace throughout the County the county seat, I work closely with the campaigns in villages and towns border the unit complete 5 2 town within the

13、 administrative area of the County Planning, 12 and 5 pillars of joint inspection of the border. Grass-roots democracy: one is to promote grass-roots6 湖南湘荣建筑工程有限公司目 录一、工程概况及编制依据二、半模护壁施工的成因三、施工准备 四、主要施工方法 五、质量要求 六、安全注意事项 一、工程概况及编积依据1、工程概况工程名称:谷山·乐园经济适用房三期项目 栋建设单位: 设计单位: 勘测单位: 监理单位: 施工单位: 结构形式: 2

14、、编制依据本工程半模护壁施工方案依据设计施工图GS02-04,建筑桩基技术规范JGJ94-94、地基与基础工程施工质量验收规范GB50202-2002、湖南大地岩土工程公司勘察设计有限公司详细勘察报告以及以往人工挖孔桩桩基施工经验编制。 二、半模护壁施工的成因工程基础设计采用人工挖孔灌注桩,设计桩长>6m。本建设场地由岩石土工程详细勘察报告表明,本工程人工挖孔桩深度大部份桩深在10-13米左右,有少部份桩深度将超过20米以上。在桩孔开挖过程中发现存在以下情况;(1)、由于今年雨水较多,雨量较大,造成地下水位特别丰富,地下水位升高。(2)、残积黏土层挖松遇水后即成淤泥,且出现流泥、流砂等不

15、利地质现象。(3)、本工程设计桩径不大(800-1200mm),超深桩孔施工按正常护壁危险性较大且难以进行。 根据以上施工现场实际情况及桩基础施工特性,为保证人工挖孔桩施工人员人身安全,我项目部对部分桩孔开挖进行了半模护壁施工。三、施工准备1、技术准备(1)、根据地勘报告,熟悉水文地质资料,结合施工现场实际地质条件做到心中有数。(2)、对半模施工及其安全进行技术交底(班组交底)。2、现场准备(1)、按施工平面图,搭设临时设施:工棚、宿舍、配电房、仓库等。(2)、建筑机械及工具:空压机(型号W-2.8/5功率17.5KW)、电动绞车三角架手绞车、手推车或翻斗车,半模钢模(每节高度为500mm)、

16、手铲、线坠、吊桶,串管,振动棒,粗麻绳、钢丝绳、安全活动盖板,防水照明灯(低压36V、100W)电焊机通风机及供氧设备,水泵,木辘轳、活动爬梯,安全帽,安全带缛并对它们进行使用性能、安全性能预先检查。3、材料准备(1)、水泥、中砂、石子(5-31.5mm的卵石、水、外加剂,如早强剂等)。(2)、钢筋:钢筋的级别,直径必须符合设计要求,有出厂证明书及检测报告。4、降水通风送气准备由于地下水较大,应从施工顺序考虑,对周围桩孔同时抽水,以减少开挖孔内的涌水量,并采取交替循环施工的方法,以便达到快速降水的效果。在半模护壁施工中,由于桩孔较深加之桩径不大,在桩孔下挖时必须确保桩内空气流通和氧气的充足供应

17、,应经常检查桩孔内有无毒害气体和缺氧现象,桩孔开挖深度超过10m时,应有专门向井下送风设备,风量不宜小于25C/S。四、施工方法1、挖孔方法土质较为软弱时用锄锹掘进,遇土质坚硬时改用风镐掘进,挖土次序为先挖中间部分,再挖周边,允许尺寸误差为2cm,扩底部分采取先挖桩身圆柱体,再按扩底尺寸从上到下削土修成扩底形,弃土装入扩底吊桶内,垂直运输用人工绞架提升至井口边1.5m以外。2、护壁施工桩护壁的混凝土强度等级为C30,半模施工时上一节挖深约500mm,安装护壁钢模板,人工搅拌砼、人工振捣浇灌混凝土护壁。往下施工时以每一节作为一个施工循环。为保证护壁安全,护壁均应按图中要求配筋。为确保砼强度,可根

18、据实际情况通过实验的方法对护壁砼添加外加剂,确保桩孔开挖顺利进行。为便于井内组织排水,在透水层区段的护壁预留池水孔,并在浇灌前予以堵塞。为保证桩的垂直度,要求每浇灌完三节护壁,须校核桩中以位置及垂直度。混凝土强度达1Mpa即可拆模。 3、挖孔注意事项:相邻桩扩大头尽距小于1.5D时,应避免同时开挖。必须采取跳挖孔的方法,以避免由于水的渗透而造成垮井现象发生。桩孔开挖时应有效组织排水遇到流泥流砂时应立即停止施工,便快速采取有效措施防止安全事故发生。桩孔的挖掘深度应由勘察、设计人员根据现场实际情况决定,对于半模护壁的桩超深,不能只按设计图纸提供的桩长参考数据终止挖掘。挖到持力层时经地勘等质量检测部

19、门确认后方可扩底。扩底时,为防止扩大头处坍方,可采取间隔扩底挖土措施,留一部分土方作支持,待灌注砼前再挖除。五、质量要求(一)保证项目1.凡进入现场的原材料必须符合设计要求和施工规范规定,并且应遵循先送检合格后才能使用的原则。2.施工中必须对每一个桩做好隐蔽记录,持力层必须经桩基础原位测试达到设计要求,勘察、设计、监理、业主四方现场验收后方能浇注砼。砼试压块严格按规范要求一桩留置一组,并及时送检。(二)基本项目桩径大小等挖孔桩的施工容许偏差如下表:桩心直径D+50mm -50mm钢筋笼(主筋)保护层±10mm垂直度偏差0.5%孔底沉碴容许厚度0桩成孔中心位移50mm(三)排水措施要求为使井内渗水及时排出,避免回流,经项目部商议决定,本半模施工排水措施如下: (1)少量渗水可在桩孔内挖小集水坑,随挖土随用吊桶,将泥水一起吊出;(2)大量渗水,可在桩孔内先挖较深集水井,设单相污水泵将地下水排出桩孔外,随挖土随加深集水井;(3)涌水量很大时,如桩较密集,可将一桩超前开挖使附近地下水汇集于此桩孔内,用1-2台三相电动离心污水泵将地下水抽出,起到深井降水的作用,将附近桩孔地下水位降低;(4)渗水量较大,井底地下水难以排干时,底部泥渣可用压缩空气清孔方法清孔。六、安全注意事项 (1)、成立以项目经理、专职安全员、施工员

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论