1、精选优质文档-倾情为你奉上一、名词解释(5*2=10)PMI, Project Management Institute, 美国项目管理学会PMP, Project Management Professional, 项目管理专业人员认证PMBOK, Project Management Body of Knowledge, 项目管理知识体系PLC, project life cycle, 项目生命周期RFP, Request for proposal, 需求建议书WBS, Work Breakdown Structure, 工作分解结构CPM, Critical path method, 关键
2、路径法PERT, Project Evaluation and Review Technique, 计划评审技术AOA, Activity-On-Arrow, 双代号网络图法AON, Activity-on-node, 单代号网络图CPI, Cost Performance Index, 成本绩效指数 (挣值(EV)/实际成本(AC)RAM, Responsibility Assignment Matrix, 职责分配矩阵P&L, Profit and loss损益VAT
3、, value-added tax, 加值税、增值税 QA, Quality Assurance, 质量保障二、填空题(5*2=10)。1. A project is an endeavour to accomplish a specific objective through a unique set of interrelated tasks and the effective utilization of resources. 1.项目是努力完成一个特定的目标,通过一套独特的相互关联的任务和资源的有效利用。2. A project manager is re
4、sponsible for planning the work and then work the plan.项目经理负责规划工作,然后工作计划。3. The project life cycle has four phases: initiating, planning, performing, and closing the project.项目生命周期有四个阶段 启动、 规划、 执行和结束项目。4. Project selection involves evaluating potential projects and then deciding which should move fo
5、rward to be implemented.项目选择涉及潜在项目评估,然后决定,应该向前来实施。5. WBS facilitates evaluation of cost, time, and technical performance of the organization on a project. WBS 促进评估的成本、 时间和上一个项目组织的技术性能。6. The project network is developed from the information collected for the WBS and is a graphic flow chart of the pr
6、oject job plan. 项目开发从 WBS 收集的信息和网络是一个图形的流程图的项目工作计划。7. In the context of projects, risk is an uncertain event and condition that, if it occurs, has a positive and negative effect on project objectives. 在项目范围内,风险是不确定的事件和条件,如果它发生,已经对项目目标的积极和消极的影响。8. Milestones are significant project events that mark m
7、ajor accomplishments. 里程碑是重大项目事件标记的主要成就。9. Two important factors affecting recruitment are the importance of the project and the management structure being used to complete the project.有两个重要影响因素招聘有项目和管理结构被用来完成这项工程的重要性10. The most common method for shortening project time is to assign additional staf
8、f and equipment to activities.最常用的方法,缩短项目时间是将额外的工作人员和设备分配给活动三选择题(15*2=30)1. Communications is best described as:A. an exchange of information.B. providing written or oral directions.C. consists of senders and receiversD. effective listening.E. All of the aboveANS: E2. The following types of costs ar
9、e relevant to making a financial decision except:A. opportunity costsB. direct costsC. sunk costD. unavoidable costsE. None of the aboveANS: C3. Time management is the allocation of time in a project's life cycle through the process of:A. PlanningB. Estimating.C. Scheduling.D. ControllingE. All
10、of the above.ANS: E4. A project element which lies between two events is called: 位于两个事件之间的项目元素被称为A. An activity.B. A critical path method.C. A slack milestone.D. A timing slot.E. A calendar completion point.ANS: A5. A comprehensive definition of scope management would be: 一个全面的定义的范围管理将是 A. Managing
11、a project in terms of its objective through the concept, development, implementation, and termination phases of a project.管理项目以及项目的概念、 发展、 实施和终止阶段通过其目的。B. Approval of the scope baseline.C. Approval of the detailed project charter.D. Configuration control.E. Approved detailed planning including budge
12、ts, resource allocation, linear responsibility charts and management sponsorship.ANS: A6. Pure Risk differs from Business Risks because Pure Risk's _ .A. include chances of both profit or loss associated with the business.B. include chances of loss and no chances for profit associated with the b
13、usiness. 包括丢失的可能性和相关业务的利润没有机会C. must incur personal loss with business liability. 必须与业务责任招致个人损失。D. must incur business liability associated with loss of pure profit.E. B and CANS: BANS: D7. The most common types of schedules are Gantt charts, milestone charts, line of balance, and:A. Networks.B. Tim
14、e phased events.C. Calendar integrated activities.D. A and C only.E. B and C only.ANS: A8. In preparing a good project definition, experienced project managers will:A. Concentrate mainly on the end product rather than costs or benefits. These come later.B. Realize that only the "tip of the iceb
15、erg" may be showing. As a project manager, you must get beneath it.C. Understand that a project definition/plan is a dynamic rather than static tool, and thus subject to change.D. Try to convert objectives into quantifiable terms.E. All of the aboveANS: E9. Since risk is associated with most pr
16、ojects, the best course of action is to:A. cover all project risks by buying appropriate insuranceB. ignore the risks, since nothing can be done about them and move forward with the project in an expeditious manner.C. avoid projects with clear and present risksD. eliminate all known risks prior to t
17、he execution phase of the projectE. identify various risks and implement actions to mitigate their potential impactANS: E10. Risk management allows the project manager and the project team to:A. eliminate most risks during the planning phase of the projectB. identify project risksC. identify impacts
18、 of various risksD. plan suitable responsesE. B, C and D onlyANS: E11. Which of the following types of cost are relevant to making financial decisions:A. sunk costB. opportunity costC. material costD. A and C onlyE. B and C onlyANS: E12. Which of the following is often overlooked in achieving effect
19、ive communication?A. speaking clearlyB. listeningC. interpretingD. maintaining eye contactE. manipulating the conversationANS: B13. The highest degrees of project risk and uncertainty are associated with the following phase of the project:A. conceptualB. executionC. cut-overD. post project evaluatio
20、nE. A and D onlyANS: A14. The auditing function that provides feedback about the quality of output is referred to as:A. quality control.B. quality planning.C. quality assurance.D. quality improvementE. All of the above.ANS: C15. The sending or conveying of information from one place to another is th
21、e process ofA. NetworkingB. TransmittingC. InteractingD. PromotingE. InterfacingANS: B16. Project life cycles provide a better means of measurement of progress and control. The four phases of a project are conceptual development,_, _, and _.A. Preliminary planning, detail planning, closeoutB. Implem
22、entation, reporting, terminationC. Development, implementation, terminationD. Execution, reporting, finishingE. Implementation, termination, post-audit reviewANS: C17. All of the following are categories of a milestone in a schedule except:A. End date.B. Contract dates.C. Key events scheduled.D. Imp
23、osed dates.E. Task duration.ANS: E18. Uncertainty refers to a situation where:A. the outcomes are known but their probabilities are highB. the outcomes and their probabilities are knownC. neither the outcomes nor their probabilities are knownD. states of nature can change at any timeE. probabilities
24、 of various states of nature can change at any timeANS: C19. Excessive flexibility in specifying requirements will _ the likelihood of time overruns.A. Reduce.B. Eliminate.C. DoubleD. IncreaseE. Not affectANS: D20. Which of the following is closet to Deming's definition of Quality:A. conformance
25、 to requirements.B. fitness for use.C. continuous improvement of products and services.D. customer focus.E. All of the above.ANS: C21. The key purpose of project control is to:A. Plan ahead for uncertainties.B. Generate status reports.C. Keep the project on track.D. Develop the project road map.E. A
26、ll of the above.ANS: C22. Which of the following constitute Juran's "quality trilogy":A. planning, inspection, control.B. planning, improvement, control.C. planning, organization, control.D. product, price, customer.E. design, build, deliver.ANS: B23. Most project (and non-project) man
27、agers prefer _ communications.A. OralB. WrittenC. UpwardD. DownwardE. LateralANS: A24. On a precedence diagram, the arrow between two boxes is called:A. An activity.B. A constraint.C. An event.D. The critical path.E. None of above.ANS: B25. Quality control charts show a characteristic of the product
28、 or service against:A. the specification limits.B. customer requirements.C. control limits based on three standard deviations in each direction.D. control limits based on six standard deviations in each direction.E. A and D onlyANS: C26. In the arrow diagramming method (ADM), _ do not consume time o
29、r resources.A. Events.B. Dummy ActivitiesC. Slack elements.D. B and C only.E. All of the above.ANS: A27. Activities with zero time duration are referred to as:A. Critical path activites.B. Noncritical path activities.C. Slack time activities.D. DummiesE. None of above.ANS: D28. In the PDM, common co
30、nstraints include:A. Start-to-startB. Finish-to-startC. Finish-to-finishD. B and C onlyE. A, B, and C.ANS: E29. Non-verbal communication includes:A. Body movementB. GesturesC. Facial expressionsD. The way we move our handsE. All of the aboveANS: E30. Which one of the following is not an acquisition
31、method?A. advertisingB. invitationC. negotiationD. purchaseE. all are acquisition methodsANS: A31. For communication to occur, there must be:A. Two or more people involvedB. the transmittal of informationC. a communication processD. All of the aboveE. B and C onlyANS: D32. Job continuity would be an
32、 example of _ in Maslow's hierarchy of needs.A. Self-actualizationB. EsteemC. PhysiologicalD. BelongingE. SafetyANS: E四、简单题(2*10=20)。1. What are the major characteristics of a project? 项目的主要特点有哪些1).An established objective. 既定的目标2).A defined life span with a beginning and an end. 定义的寿命,有开始和结束3).
33、Usually, the involvement of several departments and professionals. 通常情况下,几个部门及专业人士参与。4).Typically, doing something that has never been done before. 通常情况下,做一些从来没有过5).Specific time, cost, and performance requirements. 具体的时间、 成本和性能要求。2. What factors do you consider when choosing project management structure? At least five factors. 选择项目管理结构时,你考虑什么因素?1).
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 城市精细化管理与智慧城管平台建设规划
- 家庭火灾预防与应对策略
- 2025年饭局文化面试题及答案
- 女性求职路上的困惑与解答面试技巧解析
- 浙江国企招聘2025丽水青田县县属国有企业青田县农业旅游发展投资有限公司公开招聘丙类人员15人笔试历年参考题库附带答案详解
- 并购项目助理并购税务筹划指南
- 外派讲师跨文化培训课程大纲
- 2025浙江嘉兴海宁市通程港口经营有限公司招聘拟聘用笔试历年参考题库附带答案详解
- 2025江西吉安武功山旅游发展集团有限公司及下属子公司招聘16人笔试历年参考题库附带答案详解
- 2025江苏海州港务股份有限公司2025年公开招聘工作人员笔试历年参考题库附带答案详解
- 2025年阿里辅警协警招聘考试备考题库附答案详解(研优卷)
- 2025年及未来5年市场数据中国汽车TIC服务行业市场运行态势与投资战略咨询报告
- 宜宾市叙州区事业单位2025年下半年公开考核招聘工作人员(24人)考试笔试备考题库及答案解析
- 2025年洛阳市城乡一体化示范区招聘城市管理辅助人员130名笔试考试参考试题及答案解析
- 吉林省四平市三校2025~2026学年度上学期第三次月考试卷 七年级地理(含答案)
- 经皮冠状动脉介入治疗术后口服抗栓策略优化专家共识2026
- 2025年垫江县辅警协警招聘考试真题及参考答案详解1套
- 掘进队长考试题库及答案
- 2024年宜昌市西陵区人民医院医疗卫生专业技术人员招聘考试真题
- 多学科协作(MDT)决策方案
- 2025年中国铁路青藏集团有限公司招聘全日制普通高校大专(高职)毕业生笔试题库(二)附答案解析
评论
0/150
提交评论