版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、ClauseIs this a newrequirement?Applicable Process(es)Level of currentimplementationJustificationLevel of difficulty toimplementJustificationLevel of complexity toimplementAction RequiredResources RequiredYes/No/Partially1 = Fully implemented1 = Not difficult1 = Not complex5 = Nothing in place5 = Ver
2、y difficult25 = Very complex4.04.0 ContextContext ofof thethe OrganizationOrganization4.14.104.24.204.34.304.3.14.3.104.3.24.3.204.44.404.4.14.4.104.4.1.14.4.1.104.4.1.24.4.1.204.4.24.4.205.05.0 LeadershipLeadership5.15.105.1.15.1.105.1.1.15.1.1.105.1.1.25.1.1.205.1.1.35.1.1.305.1.25.1.205.25.205.2.
3、15.2.10Scorethe Level ofcurrent implementationof the affected processon a scaleof 1-5.In the jusfitfiacitonbox, indicatetherationalebehind theassigned valuein theprevious column.Ifa clause affects more thanoneprocess, click the plus signtoexpand the clause into 5rows. Youwill then be able to generat
4、e acomplexity score for eachprocessthat is affectedby the clause. Useone row per affectedprocess.Scorethe Level ofdifficulty to implementeach affected processon a scaleof 1-5.In the jusfitfiacitonbox, explain therationalebehind theassigned valuein theprevious column.Cells with a light blue backgroun
5、drepresent clauses from IATF16949:2016.Cells with a white background representclauses from ISO9001:2015.Indicates the Level of complexity to implement each process. Thisscoreis automatically generated for each process by multiplyingthevalues listed in colums D and F.The level of complexity can range
6、from1-25.The level of complexity is alsorepresented by colorsranging from green to yellowto red.Green indicates the lowestlevelof complexity, and red is the highestlevel.In the action requiredbox, identify whatactivities need to beperformed to closethegap.In the resourcesrequired box, identifywhatre
7、sources areneeded to perform theactivities.List applicable processes. Each process owner should indicate if the requirements are applicable to her/his 5.2.25.2.205.35.305.3.15.3.105.3.25.3.206.06.0 PlanningPlanning6.16.106.1.16.1.106.1.26.1.206.1.2.16.1.2.106.1.2.26.1.2.206.1.2.36.1.2.306.26.206.2.1
8、6.2.106.2.26.2.206.2.2.16.2.2.106.36.307.07.0 SupportSupport7.17.107.1.17.1.107.1.27.1.207.1.37.1.307.1.3.17.1.3.107.1.47.1.407.1.4.17.1.4.107.1.57.1.507.1.5.17.1.5.107.1.5.1.17.1.5.1.107.1.5.27.1.5.207.1.5.2.17.1.5.2.107.1.5.37.1.5.307.1.5.3.17.1.5.3.107.1.5.3.27.1.5.3.207.1.67.1.607.27.207.2.17.2.
9、107.2.27.2.207.2.37.2.307.2.47.2.407.37.307.3.17.3.107.3.27.3.207.47.407.57.507.5.17.5.107.5.1.17.5.1.107.5.27.5.207.5.37.5.307.5.3.17.5.3.107.5.3.27.5.3.207.5.3.2.17.5.3.2.107.5.3.2.27.5.3.2.208.08.0 OperationOperation8.18.108.1.18.1.108.1.28.1.208.28.208.2.18.2.108.2.1.18.2.1.108.2.28.2.208.2.2.18
10、.2.2.108.2.38.2.308.2.3.18.2.3.108.2.3.1.18.2.3.1.108.2.3.1.28.2.3.1.208.2.3.1.38.2.3.1.308.2.3.28.2.3.208.2.48.2.408.38.308.3.18.3.108.3.1.18.3.1.108.3.28.3.208.3.2.18.3.2.108.3.2.28.3.2.208.3.2.38.3.2.308.3.38.3.308.3.3.18.3.3.108.3.3.28.3.3.208.3.3.38.3.3.308.3.48.3.408.3.4.18.3.4.108.3.4.28.3.4.
11、208.3.4.38.3.4.308.3.4.48.3.4.408.3.58.3.508.3.5.18.3.5.108.3.5.28.3.5.208.3.68.3.608.3.6.18.3.6.108.48.408.4.18.4.108.4.1.18.4.1.108.4.1.28.4.1.208.4.1.38.4.1.308.4.28.4.208.4.2.18.4.2.108.4.2.28.4.2.208.4.2.38.4.2.308.4.2.3.18.4.2.3.108.4.2.48.4.2.408.4.2.4.18.4.2.4.108.4.2.58.4.2.508.4.38.4.308.4
12、.3.18.4.3.108.58.508.5.18.5.108.5.1.18.5.1.108.5.1.28.5.1.208.5.1.38.5.1.308.5.1.48.5.1.408.5.1.58.5.1.508.5.1.68.5.1.608.5.1.78.5.1.708.5.28.5.208.5.2.18.5.2.108.5.38.5.308.5.48.5.408.5.4.18.5.4.108.5.58.5.508.5.5.18.5.5.108.5.5.28.5.5.208.5.68.5.608.5.6.18.5.6.108.5.6.1.18.5.6.1.108.68.608.6.18.6.
13、108.6.28.6.208.6.38.6.308.6.48.6.408.6.58.6.508.6.68.6.608.78.708.7.18.7.108.7.1.18.7.1.108.7.1.28.7.1.208.7.1.38.7.1.308.7.1.48.7.1.408.7.1.58.7.1.508.7.1.68.7.1.608.7.1.78.7.1.708.7.28.7.209.09.0 PerformancePerformance EvaluationEvaluation9.19.109.1.19.1.109.1.1.19.1.1.109.1.1.29.1.1.209.1.1.39.1.
14、1.309.1.29.1.209.1.2.19.1.2.109.1.39.1.309.1.3.19.1.3.109.29.209.2.19.2.109.2.29.2.209.2.2.19.2.2.109.2.2.29.2.2.209.2.2.39.2.2.309.2.2.49.2.2.409.39.309.3.19.3.109.3.1.19.3.1.109.3.29.3.209.3.2.19.3.2.109.3.39.3.309.3.3.19.3.3.1010.010.0 ImprovementImprovement10.110.1010.210.2010.2.110.2.1010.2.210
15、.2.2010.2.310.2.3010.2.410.2.4010.2.510.2.5010.2.610.2.6010.310.3010.3.110.3.10ClauseIs this a newrequirement?Applicable Process(es)Level of currentimplementationJustificationLevel of difficulty toimplementJustificationLevel of complexity toimplementAction RequiredResources RequiredYes/No/Partially1
16、 = Fully implemented1 = Not difficult1 = Not complex5 = Nothing in place5 = Very difficult25 = Very complex8.08.0 OperationOperation8.2.3.1.38.2.3.1.3PartiallySelling3Feasibility is carried outwithout a multidisciplinaryapproach and onlyconsidering cost relatedaspects when performing therisk analysi
17、s.3The current feasibility activities needto be reviewed and improved to ensure amultidisciplinary approach and all therequirements are implemented. 9Identify the required functions to create themultidisciplinary approach; upadte the processconsidering the use of the multidisciplinaryapproach during
18、 the feasibility activities.The multidisciplinary teamwill require specifictraining to effectivelyconduct the technicalreview activities.8.2.3.1.3Process Development5Thus far we haventconsidered any validation ofour ability to make productsto specifications at therequired rate.5This activity has bee
19、n performed aspart of the D&D of the manufacturingprocess during the APQP process. Duringthe production launch, the customersscheduled volume was lower than thecontract rate. Producing the contractrate will increase inventory and thecustomer is not obliged to buy thisinventory.25Review how our p
20、rocess interacts with theSales process. Identify potential majordifferences between the rate on the contractand scheduled volumes, among other relevantaspects to consideration during validationactivities. A risk analysis activity needs tobe defined and implemented related to overallfeasibility activ
21、ities, including validation.Training of personsinvolved in validationactivities. Material,equipment and toolingavailable for running theproduction trial.8.2.3.1.3Production4So far we have onlyparticipated in thefeasibility activities ledby Process Development. Mostof the requirements are newfor us.4
22、A thorough review is needed todetermine how the process willparticipate in all feasibilityactivities carried out during the salesand design activities.16Designate specific persons to become part ofthe multidisciplinary approach. Allocate inthe regular production scheduling slots forproduction trial
23、runs.The persons designated tothe multidisciplinary teamwill require specifictraining. Implementadjustments to the currentERP system.8.2.3.1.308.2.3.1.308.2.3.28.2.3.208.2.48.2.408.38.308.3.18.3.108.3.1.18.3.1.108.3.28.3.208.3.2.18.3.2.108.3.2.28.3.2.208.3.2.38.3.2.308.3.38.3.308.3.3.18.3.3.108.3.3.
24、28.3.3.208.3.3.38.3.3.308.3.48.3.408.3.4.18.3.4.108.3.4.28.3.4.208.3.4.38.3.4.308.3.4.48.3.4.408.3.58.3.508.3.5.18.3.5.108.3.5.28.3.5.208.3.68.3.608.3.6.18.3.6.108.48.408.4.18.4.108.4.1.18.4.1.108.4.1.28.4.1.208.4.1.38.4.1.308.4.28.4.208.4.2.18.4.2.108.4.2.28.4.2.208.4.2.38.4.2.308.4.2.3.18.4.2.3.10
25、8.4.2.48.4.2.408.4.2.4.18.4.2.4.108.4.2.58.4.2.508.4.38.4.308.4.3.18.4.3.108.58.508.5.18.5.108.5.1.18.5.1.108.5.1.28.5.1.208.5.1.38.5.1.308.5.1.48.5.1.408.5.1.58.5.1.508.5.1.68.5.1.608.5.1.78.5.1.708.5.28.5.208.5.2.18.5.2.108.5.38.5.308.5.48.5.408.5.4.18.5.4.108.5.58.5.508.5.5.18.5.5.108.5.5.28.5.5.
26、208.5.68.5.608.5.6.18.5.6.108.5.6.1.18.5.6.1.108.68.608.6.18.6.108.6.28.6.208.6.38.6.308.6.48.6.408.6.58.6.508.6.68.6.608.78.708.7.18.7.108.7.1.18.7.1.108.7.1.28.7.1.208.7.1.38.7.1.308.7.1.48.7.1.408.7.1.58.7.1.508.7.1.68.7.1.608.7.1.78.7.1.708.7.28.7.20ClauseIs this a newrequirement?Applicable Proc
27、ess(es)Level of currentimplementationJustificationLevel of difficulty toimplementJustificationLevel of complexity toimplementAction RequiredResources RequiredYes/No/Partially1 = Fully implemented1 = Not difficult1 = Not complex5 = Nothing in place5 = Very difficult25 = Very complex4.04.0 ContextCont
28、ext ofof thethe OrganizationOrganization4.14.104.24.204.34.304.3.14.3.104.3.24.3.204.44.404.4.14.4.104.4.1.14.4.1.104.4.1.24.4.1.204.4.24.4.205.05.0 LeadershipLeadership5.15.105.1.15.1.105.1.1.15.1.1.105.1.1.25.1.1.205.1.1.35.1.1.305.1.25.1.205.25.205.2.15.2.105.2.25.2.205.35.305.3.15.3.105.3.25.3.2
29、06.06.0 PlanningPlanning6.16.106.1.16.1.106.1.26.1.206.1.2.16.1.2.106.1.2.26.1.2.206.1.2.36.1.2.306.26.206.2.16.2.106.2.26.2.206.2.2.16.2.2.106.36.307.07.0 SupportSupport7.17.107.1.17.1.107.1.27.1.207.1.37.1.307.1.3.17.1.3.107.1.47.1.407.1.4.17.1.4.107.1.57.1.507.1.5.17.1.5.107.1.5.1.17.1.5.1.107.1.
30、5.27.1.5.207.1.5.2.17.1.5.2.107.1.5.37.1.5.307.1.5.3.17.1.5.3.107.1.5.3.27.1.5.3.207.1.67.1.607.27.207.2.17.2.107.2.27.2.207.2.37.2.307.2.47.2.407.37.307.3.17.3.107.3.27.3.207.47.407.57.507.5.17.5.107.5.1.17.5.1.107.5.27.5.207.5.37.5.307.5.3.17.5.3.107.5.3.27.5.3.207.5.3.2.17.5.3.2.107.5.3.2.27.5.3.
31、2.208.08.0 OperationOperation8.18.108.1.18.1.108.1.28.1.208.28.208.2.18.2.108.2.1.18.2.1.108.2.28.2.208.2.2.18.2.2.108.2.38.2.308.2.3.18.2.3.108.2.3.1.18.2.3.1.108.2.3.1.28.2.3.1.208.2.3.1.38.2.3.1.308.2.3.28.2.3.208.2.48.2.408.38.308.3.18.3.108.3.1.18.3.1.108.3.28.3.208.3.2.18.3.2.108.3.2.28.3.2.20
32、8.3.2.38.3.2.308.3.38.3.308.3.3.18.3.3.108.3.3.28.3.3.208.3.3.38.3.3.308.3.48.3.408.3.4.18.3.4.108.3.4.28.3.4.208.3.4.38.3.4.308.3.4.48.3.4.408.3.58.3.508.3.5.18.3.5.108.3.5.28.3.5.208.3.68.3.608.3.6.18.3.6.108.48.408.4.18.4.108.4.1.18.4.1.108.4.1.28.4.1.208.4.1.38.4.1.308.4.28.4.208.4.2.18.4.2.108.4.2.28.4.2.208.4.2.38
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025-2026学年描述矿物质教学设计
- 2025-2026学年超火音乐教案
- 2025-2026学年风扇的分类教案
- 2026年一对一律师资格考试试卷及答案
- 教师角色定位与课堂教学重构:教师互动行为研究的启示
- 2026年保洁技能考试题及答案
- CT增强造影剂过敏应急处理指南(2025版)
- 2026年路基施工质量技术培训试题及答案
- 病理甲醛废气活性炭更换周期指南(2025版)
- 防化服气密性检测压力控制指南(2025版)
- (零模)苏州市2027届高三年级9月阳光调研试卷 生物试卷(含答案)
- 电梯更新改造工程监理规划
- 2026年托育机构生活照护员职业技能等级认定题库
- 2026年龙游经开高新控股集团有限公司及其子公司公开招聘合同制员工11人的笔试备考试题及答案详解
- 血常规解读:从化验单到临床线索
- 2026年江苏省泰州市抗震办公室(审图中心)招聘1人易考易错模拟试题(共500题)试卷后附参考答案
- 2026年世界职业院校技能大赛“智能网联汽车技术组”参考试题及答案
- 2026新教材语文 13《圆明园的毁灭》教学课件
- 《UI界面设计》高职全套教学课件
- 传统民俗文化节活动策划方案
- 合集-Q/GDW-10248.5-2016-变电(换流)站电气工程施工强制性条文执行记录表-表4-表46
评论
0/150
提交评论