版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、测绘专业英语1UNIT-19consist of only several items, in the simplest routine investigation, or of hundreds or thousands of different data, in very complex or critical conditions. The rate of monitoring movements may be annually, monthly, weekly, daily, hourly, or even more frequently.Detecting and quantifyi
2、ng movements require the use of very precise equipment. Such movements are very small and to accurately measure them requires meticulous fieldwork as well as rigorous analysis of observed data. Deformation monitoring techniques can be generally divided into geotechnical , structural and geodetic (su
3、rvey) methods. The geodetic methods (highly understood by engineering surveyors) that can be used are Global Positioning System (GPS) , close-range photogrammetry with the use of terrestrial camera, precise theodolite and levels, total station,laser scanners, and vibration monitoring systems, a very
4、 long baseline interferometry and satellite laser ranging. A number of traditional surveying techniques have also been modifiedand applied to yield the highest possible accuracies. Geodetic measurements involve the observables of horizontal angles, or direction; spatial distance; and height differen
5、ce. Geotechniacl measurements consist of similar geometric quantities, but over a much smaller extent than for geodetic measurements (distances to a few meters rather than hundreds of meters), as well as measurements of the physical or mechanical state of the object being monitored.The survey method
6、s can be further subdivided into the survey network method and direct measurement method. In geodetic method there are two types geodetic networks, namely the reference (absolute) and relative network.Monitoring SchemesA deformation survey requires the assessment of project expectations. This would
7、include accuracy statements in order to detect the movement and external effects of theobject suspected of movement. The observation period and frequency must also be established. The selection of most appropriate technique or combination of techniques for any particular application will depend upon
8、 cost, the accuracy required, and the scale of the survey involved. Therefore several aspects related to the optimal design of the networks, measurement and analysis techniques suited to the monitoring surveys have to be considered. The design of monitoring scheme should satisfy not only the best ge
9、ometrical strength of the network but should primarily fulfill the needs of subsequent physical interpretation of the monitoring results. Selection of monitoring techniques depends heavily on the type, the magnitude and the rate of the deformation. Therefore, the proposed measuring scheme should be
10、based on the best possible combination of all available measuring instrumentation. A common feature for both geodetic and satellite methods in monitoring scheme involves the following three stages: The design of the scheme required to undertake the deformation survey must consider the instrumentatio
11、n to be used, the geometry of the network, the location of observables points, the types of observables, preanalysis of possibly environmental influences, and frequency of observation of the observables to the expected form of deformation. The reference datum must be appropriate, secure, and stable
12、and not influenced by the suspected or anticipated movement within the local site area.The execution process that runs a designed network into reality should be carefully done, which deals with both the documentation of the proposed network stations and the actual field measurement techniques in whi
13、ch the equipment used must be adjusted and in good working order with appropriate calibrations completed.Data processing deals with the processing and analysis of the collected geodetic data, quality assurance andcontrol that must be followed to confirm the expected results.Processing occurs simulta
14、neously with capture and subsequent to capture with different tasks at each time. During capture, the points involved must be identified ,an ancillary observations, such as temperature, must be requested along with dealing with the observation. The observation would likely be repeated in order to ob
15、tain a mean and an estimate of its standard deviation and the mean would be compared with the predicted or most recent value as a check on consistency. Subsequent processing would further reduce the observation and the data into series file or campaign file following the structure of the data manage
16、ment system. Consistency would be checked either again for the observation or further for the reduced data.Trend AnalysisOnce more than one campaign has been observed or once enough data are contained in a series, it is necessary to determine the tendency that is being exhibited in space or over tim
17、e or both. The observed tendencies are then brought together to suggest possible forms of models, i.e., the choice of parameters to be estimated. The trend analysis acts as a filter by extracting the behavior of interest, e.g., the annual trend or rate, from the time series, e.g., the noise being th
18、e seasonal cycle that is a reaction to the change in temperature. The extracted trends become the input or “observations” in the modeling and , therefore, it is necessary to have measures of variance associated with each trend. The spatial trend can be derived for one or two dimensional networks by considering the differences in coor
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026湖南机关事业单位工勤技能岗位考试(高级技师/技师收银员·理论知识)历年参考题库含答案详解
- 2026湖北省职业卫生放射卫生专业技术人员能力考试(职业卫生评价)历年参考题库含答案详解
- 2026湖北省机关事业单位工勤技能人员技术等级考试(测量测绘工·高级)历年参考题库含答案详解
- 上海中医药大学2026年护理学(中医护理)试题及答案
- 2026年青岛大学环境科学与工程专业《环境监测》科目期末试卷A(有答案)
- 2026下半年社保服务中心招聘考试历年真题含答案
- 2026年重庆市巫溪县熔化焊接与热切割作业证理论考试练习试卷(含答案)
- 2026年浙江省云和县流动式起重机(汽车吊)操作证考试练习试卷(含答案)
- 2026年尾矿库安全监测工职业技能理论考试练习试卷(含答案)
- 融资担保合同
- GB/T 28117-2026食品包装用多层共挤膜、袋质量通则
- 临床药学治疗药物监测专家讲座
- (2026年)三力测试官方模拟考试题库完整版(可直接刷题)
- 人教版七年级美术上册 第一单元 峥嵘岁月-美术中的历史(共3课)教案
- 招标代理业务内控管理手册
- HDU高依赖病房应急处置手册
- 220KV输电线路劳务外包管理方案
- 2026中国药师协会执业药师继续教育答案
- 2026人教版四年级数学上册第五单元第2课《画垂线和点到直线的距离》课件
- 26新五(上)数学第二单元一课一练《人教版》
- 2026秋季新学期新教材统编版小学道德与法治四年级上册(全册)知识点必背清单(填空式)
评论
0/150
提交评论