版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、第 PAGE8 页 共 NUMPAGES8 页通告2对于航行于冰区事项(英文)SAFETY INSTRUCTION / NOTICE DHM-1002 21st Jan., 2022 To: The Masters Re: Basic Remendations for Winter NavigationRecently we have noted that some vessel encountered problem with ice accumulation on main deck and ship fittings frozen during winter navigation.We
2、hereby provide you below remendations to the Masters of our fleet ships while staying or navigation during the winter period of low air temperatures.Basic Remendations 1.If you navigate in the areas where sea Ice is e_pected, during the night it isremended to have a searchlight on continuously point
3、ed forward.From e_perience you will see small pieces of Ice in sufficient time to reduce speed and safely enter the ice.2.You may e_perience Freezing Spray or Severe Freezing spray.It is strongly remended to avoid Ice buildup aboard the vessel.Sometime it maybe necessary to reduce speed to bare mini
4、mum, but remember, you may loose 12 - 18 hours on your ETA, but youll avoid 2 - 3 days of clearing Ice in the harbour.In case of reducing shipbull;s speed is being necessary, Master is requested to report the situation to charterer to obtain Chartererbull;s approval.Freezing Spray is a very importan
5、t item.If possible all precautions should be taken to avoid Ice accumulation on the main deck.You should e_pect Freezing spray when wind is from NE, N, NW, WNW, W and with speed above 15 knots.The best way to avoid it is a course alternation or reduction of speed.Effects of freezing spray are dimini
6、shing when wind is more than 45 degrees from the bow.Any Course and speed change to be done in consultation with Charterer and our pany.3.During hours of darkness, watch Personnel must maintain frequent watch over the main deck area for the e_cessive Ice build up, if there is ice then appropriate av
7、oidance action must be taken.4.In case of severe spray (temperatures less than minus 15 and wind above 35 Knots) Master shall consider to anchor vessel at a safe anchorage to wait storm pass.5.All pipelines on the open decks must be empty and dry, this should be done prior entering cold weather.6.Ba
8、llast Valves (If not filled with water ) should be crack open to avoid freezing and damages, these should be at this position until arrival 7.Fire line, steam line should be empty and dry.8.Ballast tanks stripped as much as possible.(if vessel is loaded) 9.If in Ballast Condition ? All ballast tanks
9、 should not be pressed up and it is remended not to e_ceed 90PCT.Always consistent with the Minimum Ice draft per Class requirement.10.Fresh water tanks should not be filled more than 90 PCT to avoid e_pansion and damages if frozen.11.Additional heating should be provided to the Bridge to protect eq
10、uipment.12.Mooring lines should be kept inside and taken out only prior arrival at the dock.13.Mooring winches should be tested and run at least 3 - 4 hour prior arrival.14.Pilot ladder should be kept in protected area and deployed in last moment and only when pilot boarding.15.If vessel is operatin
11、g in Ballast condition, steam hose should be connected to Sea Suction intakes for Main Engine and Generators to avoid black-outs.16.Draught aft should be ma_imum as possible.Always consistent with Fwd Draft as per Class requirement.17.Prior arrival Pilot Station both anchors must be de-iced and move
12、d up and down IN GEAR to make sure they are free.18.Lifeboat Fresh Water if in containers to be placed in protected area to avoid freezing.19.Lifeboat Engines and Emergency Fire pump should be run rested and run on daily basis.20.If the vessel is not properly insulated, then acmodations fresh water
13、piping systems should be circulated to avoid freezing.21.Vessel should be supplied with wooden mallets and salt for Ice removal.22.Lifeboat Engines, Booster Pumps and e_posed generators should be drained of water.23.When Navigating in Ice soundings of empty tanks must be taken on frequent basis (6 H
14、ours or so).24.When the ship is in the port during the winter period under the negative ambient temperatures the Masters of the ships are remended: - Keep the holds or openings closed and the temperature inside above 00C whenever possible.- Holds are to be opened right before the beginning of cargo
15、operations and closed as soon as same are pleted or interrupted.- Steady monitoring of any changes in ships draft while under cargo operations as well as their careful analysis or coordination as per quantity of received or discharged cargoes.In case of any doubt in ice formation at the ship bottom,
16、 please report to pany immediately, diver inspection might to be arranged and possible measures for the ice eliminating at the ship bottom to be taken.- Vessel windlass, mooring equipments, crane and hatch cover operation to be very carefully especially while start motors.De-Icing Procedures: If the
17、 vessel is able to operate windlass, winches,bollards, lifesaving and fire equipment then small amount of ice in the focsle area is not an immediate concern.If the vessel unable to use above equipment due to frozen and iced up, then it is strongly remended to mence de-icing procedures; Providing wat
18、er temperature is more than 10 C and air temperature - 5C and above then the best method of de-icing is to use vessels deck foam applicators monitors and/or fire hoses to apply large amount of water in the affected area to get rid of ice.From e_perience water will not damage your equipment and been
19、proven the best method to remove ice.After ice is gone and prevailing conditions are such that equipment is still frozen and difficult to operate, then it is remended to steam for a final touch up.After pletion of de-icing procedures, all drains and valves on the fire/butherworth lines and drain on
20、the main deck should be open.For de-icing of small areas and when in e_treme cold weather then use of the wooden mallets to remove ice from valves, manifolds, windlass etc is remended.Great care must be taken to prevent any damages as a result of striking.Masterbull;s Checklist Master is requested t
21、o send confirmation report topany before the vessel enter an areas where sea Ice is e_pected.a.Request the most updated ice chart available, convoy formation point (CFP) location and names of the ice-breakers from your Agents in advance.b.Check that your VHF radio is operative, find out in advance t
22、he channel used by the ice-breakers operating in the area.c.Check that the pipes on deck are drained of water.d.Check that the sounding and air pipes of the ballast tanks are emptied of water.e.Check that anchor wheels and other equipment which may be used in ice conditions are covered by adequate tarpaulins (to prevent icing).f.Keep the pilot ladder in a sheltered place and, before use, make sure it is not ice covered.g.Test the searchlights in advance.h.Check that the pro
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- GB/T 48055-2026液相吸附用木质活性炭
- 除尘工安全规程竞赛考核试卷含答案
- 煮糖助晶工岗前理论水平考核试卷含答案
- 汽油煤油柴油加氢装置操作工岗前生产安全水平考核试卷含答案
- 供应链管理师复试竞赛考核试卷含答案
- 酸性水汽提装置操作工安全检查能力考核试卷含答案
- 煤制油生产工诚信道德考核试卷含答案
- 矿石处理工操作能力测试考核试卷含答案
- 链板冲压工安全技能测试考核试卷含答案
- 精细木工岗中安全风险考核试卷含答案
- KNX智能家居系统培训资料
- 手术室物品管理与消毒灭菌
- 2025-2026学年广东省深圳实验学校初中部八年级(上)期中英语试卷
- 出生医学证明警示教育培训
- 困困困不醒大王原创课件
- (已压缩)(11)义务教育物理课程标准日常修订版(2022年版2025年修订)
- 2025年上海交通大学招聘真题(行政管理岗)
- Q-SY 13034-2024 物料主数据数字化描述规范
- 2025年法考主观题真题答案及解析
- 淝水之战课件
- 校园贷款案例讲解
评论
0/150
提交评论