
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、The Lean EnterprisePush versus PullLean FoundationsContinuous Improvement TrainingThe purpose of the module is to allow you to become familiar with the distinction between Push and Pull systems. PurposePull and Flow . . . .Principles of Process Analysis Flow Pull SystemsActions Required to get impro
2、ved f - l - o - w Batch Size Reduce Set-Up times and cut lot sizes “Fewer piece flow” - 1 piece is usually better People Multiple Skill Development Multiple Process Handling Materials Eliminate “Isolated Islands” Machines Laid out in processing order “right” machines to ensure the flowPull and Flow
3、. . . .Principles of Lean ThinkingFlowPull SystemsPUSH vs. PULL SYSTEMSPush vs Pull: What IS the Difference ?A requirement of any production operation is to enable everyone to know exactly: - what product is needed - by when - in what quantityThere are two ways to do it:Heres One Way - issue PRODUCT
4、ION SCHEDULES to every process using the parts from one process to drive the work at the next process - in essence PUSHING THE PARTS THROUGH THE SYSTEMPush vs Pull: What IS the Difference ?A requirement of any production operation is to enable everyone to know exactly: - what product is needed - by
5、when - in what quantity There are two ways to do it:ONE WAY - issue PRODUCTION SCHEDULES to every process using the parts from one process to drive the work at the next process - in essence PUSHING THE PARTS THROUGH THE SYSTEMANOTHER WAY - letting a process withdraw the parts from a preceding proces
6、s or PULLING THE PARTS THROUGHPush Systems Driven by Forecasts Parts are sent to the next Operation or stored in WIP The second operation continues even if there is a large amount of WIP from the first operation Buffers cover problems Expeditors push Hot partsPUSH SYSTEMS HAVE NO DISCIPLINE ON INVEN
7、TORYMore is always betterPull ProductionThe Customer usage rate determines the production rate in a PULL SYSTEM. “TAKT TIME” is that customer usage rate.Pull Production Establishment of Pull systems between operations in the same plant Connection of operations that are at a distance from each other Elimination of inter-departmental schedulingPull Production Produces only whats required by the next operation The user withdraws from the producer Kanbans or Visual Systems signal the need
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025在建项目转让合同
- 2025关于房屋交易的合同范本
- 2025标准装修合同范本大全
- 2025年版写字楼租赁合同模板
- 2025借款合同书范本
- 2025合同制定规范私营建筑项目合同
- 2025文具购销合同的范文
- 2025虚构性商品房买卖合同纠纷案
- 《2025设备搬运与运输合同》
- 2025设施升级合同(模板)
- GB/T 3098.26-2021紧固件机械性能平垫圈
- 四年级安全教育珍爱生命预防溺水安全知识主题班会
- 《岩石学》课件第二章结构构造
- 实验心理学讲解(思维)课件
- 国家基本药物培训培训课件
- 水生花卉资料课件
- 流动式起重机(固定)定期检验-自检记录
- 耳鼻咽喉科-咽肿瘤
- 高中地理·第一节人类面临的主要环境问题幻灯片
- 拟经营的食品种类、存放地点
- 宿舍楼设计开题报告
评论
0/150
提交评论