[PPT] 自然崩落法(全英文)_ppt_第1页
[PPT] 自然崩落法(全英文)_ppt_第2页
[PPT] 自然崩落法(全英文)_ppt_第3页
[PPT] 自然崩落法(全英文)_ppt_第4页
[PPT] 自然崩落法(全英文)_ppt_第5页
已阅读5页,还剩26页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、FRAGMENTATION & BLOCK CAVE DRAWFragmentationEquipment selectionRock handling strategiesDraw point production (mm/day/ draw/ cave height)BCF Primary (Back rock blocks- inputs joint dist, stress, RMR)Secondary (back rock blocks crush by cave muck pile )Hang-up programme (draw point blockage freq or dr

2、awn tons)Equipment/ strategies realties to draw point block sizesDraw production = draw point area x draw point tonnage/ratesFragmentationOther usesDrawpoint sizes/spacingDilution entryExperience levels of staffFragmentationPrimary fragmentationSecondary fragmentation/ broken by muck pile weightPrim

3、ary fragmentationPanel cave (Massmin 92)Muck pile model (Bartlett 1997)Fragmentation DeterminationEmpirical tables (Laubscher 2000)- Primary- Secondary- effectsBCF (Esterhuizen 1994)- Primary secondary- Secondary- Draw rates and hang-up frequencyCHASM (Butcher 2000)- Primary fragmentation- Visualiza

4、tion toolJKFrag ( Harries 2001)-Primary -Rigorous toolMethod usesDesktop Experience, EmpiricalBCF, Scoping with general dataCHaSM, JKFRAG , more BCF above scopingMethod limitationsChaSM, - LABOURIOUS, PRIMARY FRAG ONLYBCF, Joint stats may cause errors in block formationEmpirical. limited to authors

5、experienceJKFRAG, Research toolAll are modelsFragmentation input dataPrimary- Mean dip/ dip direction- Spacing statistics- Rock mass strength- Dip/ direction of the cave face- General stress regime SecondaryAspect ratioRate of drawCushing/ finesCave height and muck pile pressureJoint input data (Sta

6、cey & Swart 2000) ChaSMFragmentation (BCF)Fragmentation (BCF)Equipment selectionM3 % passing fragmentation criterion% 2 or 3m3:2m3 (4.6m3 LHD bucket- 1400E)3m3 (6.4m3 LHD bucket-0010)Primary Frag 2m3 =40%Secondary Frag 2m3=15%Rock handling strategiesDrawpoint hang-up freqType of hang-up/ type freqDr

7、awpoint blocker 1024m3High hang-up 128m3Low hang-up16m3100% LHD bucket 2 m3DrawratesDrawrates/production 3 TypesGeotechical Acceptable ActualGeotechnical =Frag (BCF) + hang-up modelsAcceptable= limited geotechnical (burst protection)Actual = Acceptable - mining system readinessDraw rate reductionMin

8、ing system readinessExtraction level damageConstruction behindEquipment not availableDraw point secondary blasting crews not availableCrushers and infrastructure not operationalDraw rate reductionMining system readinessExtraction level damageConstruction behindEquipment not availableDraw point secon

9、dary blasting crews not availableCrushers and infrastructure not operationalDraw rate rulesDo not exceed 200mm/day (maturity)Soft cave start draw rate 75-100mm/dayHard cave start draw rate 40-75mm/dayMining system readiness reduction 25-40%Block caving draw controlReasonPrevent dilutionUniform draw

10、down of orePrevent point loading on driftsCommutation of ore fragmentsPrevention of :-Air blasts- Rock burstsTrue block caveOre/waste interfaceUniform draw down (mass Flow)Draw points drawn evenlyPANEL CAVEDraw planeCave planeMAINTAIN SHAPEBlock cave draw principlesWhat is the overall draw strategy-

11、Block cave-Panel caveAll draw points drawn evenlyAll drawpoints to drawn to form cave/ draw planeThe open area should be big enough to achieve production tonnage (have enough drawpoints )The above must have 30- 15% extra drawpointsSimple draw strategies-fewer drawpoints, flat draw planes are betterD

12、ifferent geotechnical areas for draw rateDraw is about disciplineRequired draw dataA draw reserveWhat is going to be extracted by the cave drawpointsDraw reserve :- Ore reserve covered by extraction level draw bells- Types of draw reserve- Extraction dilution tons/factors - Drawpoint number and tonn

13、age, tonnage types- shut-off level- drift repair dataDraw controlDraw reserve adjusted to footprintDraw points have tons allocated to themDraw reservesVertical draw reserveWedge draw reserveWASTEDWPTDefined by break back angleDaily draw dataBogger tons taken from drawpointsDilutionDrift repair/ draw points outDraw beacons damagedDaily adjustment of extraction dataComputer programmesReconciliation underground 5%Secondary blastingBock caves are like red wine older betterCoarse rock start at caveA f

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论