1、礼来苏州制药有限公司湖东胰岛素灌装线项目 Lilly Suzhou East Lake Plant Insulin Cartridge Filling Line Project Job Safety Analysis FILENAME Job Safety Analysis Siemens For Commssion.docHealth, Safety & EnvironmentalPage PAGE 9 of NUMPAGES 9工作风险分析表-JSA制定/更改JSA日期: Strike out as appropriate2015年12月31 日 FORMTEXT 工作许可证号 PTW N

2、o. FORMTEXT 是否需要工作许可证: 是 FORMCHECKBOX 否发布时间: FORMTEXT 制定/更改人签字(风险分析小组人员姓名)Prepared by (Names of Team Members): FORMTEXT 赵翔 ZhaoXiang程晓荣 Chen XiaoRong陆建军 Lu Jianjun FORMTEXT FORMTEXT FORMTEXT 批准人签字(施工主管)Authorized By: (Construction Supervisor)姓名: FORMTEXT 签字: FORMTEXT 工作描述/位置:60 区域UMS系统调试作业 UMS Commi

3、ssion CUP是否须要危险源隔离: 是 FORMCHECKBOX 否详细说明: FORMTEXT FORMTEXT 执行此项工作的小组成员TEAM MEMBERS UNDERTAKING THE WORK我们已经阅读并了解了本项工作的安全工作程序/要求/措施,我们明白如果不能按照这些程序/要求/措施执行工作将会导致危险和接受纪律措施处理正楷姓名: FORMTEXT 签字: FORMTEXT 日期: FORMTEXT 正楷姓名: FORMTEXT 签字: FORMTEXT 日期: FORMTEXT 正楷姓名: FORMTEXT 签字: FORMTEXT 日期: FORMTEXT 作业步骤描述

4、Break the job down into steps. Each of the steps should accomplish some major task and be logical.确认的危害及潜在的影响Identify the hazards associated with each step. 风险评估*RA控制措施(包括现有的和建议的)Using the first two columns as a guide. Decide what actions are necessary to eliminate then control the hazards that coul

5、d lead to an incident.负责人Responsible personRR残余风险*残余风险是否尽可能的降低ALARP*? 严重度S发生概率P风险 等级 RR严重度R发生概率P风险 等级 RR1工作前准备Preparation beforeoperation1. The untrainedworkers can notcorrectlyunderstand thesafety hazardsand thus execute the EHS managementregulations ofclient and FLOUR未培训人员不能正确执行业主和FLUOR现场安全管理规定,以及

6、安全隐患理解不到位,造成人员伤害22M1 All workers shall receive inductiontraining and obtain a badge, induction training system will be implemented. Special jobs need permit 所有进现场人员必须经过入场教育取得胸卡,执行新员工培训计划管理规定。特殊工种持证上岗。2,All mandatory for authorized and affected people to attend / complete LO/TO training, if their job

7、s/ duties require him/her to work or operate the machine or equipment during serving and maintenance.对于所有工作或操作,所有授权人和受影响人都需要参加LO/TO 培训。 11LYes2. Unreasonable work method, unsafe risk exist with workers, protection measures not in place.不合理的调试方案,调试人员存在潜在的安全风险,防护措施不到位22M1. Get familiar with working ar

8、eas, consult withrelevant on-site FLUOR engineers, developproper method and JSA and submitthem to FLUOR for approval.对现场要作业的区域做到充分了解,并且咨询现场FLOUR相关工程师,编写合理的调试方案和施工危险性分析JSA,并上报FLOUR审核批准后方可进行实施。11LYes3. Unqualified PPE will bring injuries toworkers.使用不合格PPE将会给施工人员带来人身伤害22M1. Purchase PPE which is up to

9、 FLUORsrequirement, instruct and supervise workers howto correctly wear PPE.购买符合FLUOR要求的PPE,特殊工程作业时需要相关专业的安全劳保用品,并指导和监督作业人员正确佩戴PPE。11LYes4. PTW, all commissioningworkers need followPTW system, workswithout PTW or jobanalysis, hazards notindentified will bring injuries to workers.工作票,所有调试人员的作业,需遵守业主,

10、FLUOR及西门子的评估及工作票管理制度,未签署的作业,不能对潜在的风险作出分析、识别不明确造成人员伤害。21L1. Apply for PTW prior to each work, PTW have to be signed by SM and approved by FLUOR before working.在每项作业前,必须先办理作业票,作业票必须有安全经理签字,得到FLUOR的批准后方可进行作业,在办理作业票前所有作业不可进行。2. PTW is required for all commission related activates. 所有的调试工作都需要PTW。11LYes5.

11、 No analysis is made for the work, or worker do not understand JSA.没有对此项作业时行进行分析,或是员工对JSA不了解31L1. Make a JSA before work, potential risks will be analyzed for each step, control and prevention measures will be edited and submitted to FLUOR for approval.调试作业开始前必须进行JSA分析,对潜在的作业风险按作业步骤进行分析并编制控制和防范措施,提交

12、FLUOR审批。2. Tell each worker about JSA contents before each work, avoiding any injury.每项作业开始前,将JSA内容告知每位员工,坚持作业前STA会议制度,避免作业中受到人身伤害。11LYes6. No efficient LO/TO device cause injuries 没有相应LO/TO设备,导致的人身伤害。12L1, According the specification requirements for commissioning a unit equipment to determine or v

13、erity the efficient at LO/TO device.针对调试系统的特殊要求,检查确认LO/TO的有效性。11LYes2. Start the Commission开始调试1. No energy check and control cause injuries 没有危险能源控制导致的人生伤害。12L1, According the specification requirements for the commissioning units shutting down, isolating emergency energy, to check the procedural c

14、ontrol step.针对调试系统的关停、以及能量隔离的特殊要求,检查确认操作步骤。2, Check the compress air supply valves status tag, if the valves be locked. Dont operate it.检查压缩空气供气阀的状态吊牌, 如果显示是关闭状态,禁止打开操作。3, Check the MCC power switchs status tag, if the switchs be locked. Dont operate it.检查MCC控制柜的电源开关状态吊牌, 如果显示是关闭状态,禁止和闸操作。11LYes2. N

15、o power status check and control cause injuries 没有电源挂牌检查控制导致的人生伤害。12L1, According the specification requirements for the commissioning units Placement/Application/Removed, to check the procedural control step.针对调试系统的关停、以及能量隔离的特殊要求,检查确认操作步骤。2, Before operate power supply to DDC panel, should check th

16、e DDC panel power switch be locked and tag. 在DDC盘柜送电前,确保DDC盘柜的电源开关是被锁和悬挂掉牌。3, The power switch only be operated by the special guys, he should check the terminals equipment status before he operate the switch on. 电源开关的送电操作,只有检查过所有末端设备的指定人员才能进行。 4, The power switch should be off after the commissioni

17、ng finished, if the owner not use it at now. The operation should is the special guys.如果调试完成后,业主并不是马上使用该系统的话, 电源要被关闭。关闭电源的操作,需指定人员进行。11LYes3. No good Grounding, power leakage cause injuries 没有良好的接地通道,漏电导致的人生伤害。12L1、Make sure that the equipment you use is properly grounded. Grounding drains dangerous

18、 electrical current leaks away to the earth. If an electrical device is grounded, its cord will have a three-wire plug and require a three-way receptacle to accommodate it. Grounding is especially important when the equipment is used on metal surfaces. Check for proper grounding and exposed wires, a

19、s well as the condition of cords, plugs, and insulation. 确保所使用的设备有良好接地,接地线能够把危险电流导入地面。如果电气设备已经接地,它的电源线应有三芯插头和对应的三眼的插座。当电气设备在金属地面使用时,接地尤其重要检查是否有适当接地和裸露导线、电缆的状况、插头和绝缘。保证工作期间能有良好的通讯能力。11LYes4. Work at the HighSpace during the commissioning 。在调试工程中需要进行登高作业。21L1. Follow the JSA for work at high space.遵守高

20、空作业JSA的规定。12LYes5. None Related Person Entering the commissioning area.无关周边人员进入相关调试区域12M1Set up the work area and alarming alert and designate supervisor to prevent others from trespassing the area.设定作业区域,提供围挡和警示牌,派专人进行看护,防止其他人员进入。12MYes6. Multi-meter & Signal generator to test and Troubleshooting,E

21、rror Operation. 使用万用表和信号发生器进行测试时发生误操作。11L1. For the 24 voltage device, the test and Troubleshooting work should be operated by the assigned test engineer. 操作24V电压设备,由专职测试工程师负责此项工作.2.For the 220 voltage device, the test and Troubleshooting work should be operated by experienced electricians with qual

22、ification license and assigned test engineer. 操作220V电压设备,由专职电工及测试工程师共同负责此项工作.11LYes7.Equipment noise may cause injury to ears电机的噪音对耳膜存在伤害11LEar protector is necessary if the noise of the pump exceeds 80 decibel如果泵的运转声音超过80分贝的必须佩带听力保护器11LYes3.Housekeeping文明施工1. When work is finish ,Workers have not t

23、aken out the tools cause explode and electric shock.人员工作结束没有整理机具,没有移出受限空间导致爆炸触电。11L1.Recycle the tools and equipment hack to warehouse.每天收工必须把工具收回设备必须送仓库。 2, Clear the nonessential materials and tools from the equipment after commissioning finish.在调试完成后,清理不必要的材料和工具。 3.Good Lighting in work Space.工作场

24、所必须有足够的照明。11LYes2.Not clean the rubbish垃圾未清。11L1. Clean the site after finish the work.收工前必须把施工场所清扫干净,做到工完料净场地清11LYes3. When work is finish ,Workers have not remove, cause people missing.人员工作结束没有清单人数,造成人员伤害。11L1, Remove people from the machine and equipment commissioning work area, should be checked

25、 to ensure all labor removed.调试完成后清点人数,确保所有人员撤离调试工作区域11LYes4, Not remove the lockout /tag out device, cause other vendor cant do their work没有拆除保护围档和标示,造成其他包商不能工作。 12M1, Remove lockout / tag out device拆除保护围档和标示。12MYesThe residual risk is to be calculated using the table. Risk figures above 4 are not

26、acceptable and work must not continue until the risks are reduced.必须用本表计算残余风险。高于风险曲线3的为不可接受且不得继续工作,直至风险降低为止。Manual Handling人工搬运Moving heavy loads by lifting, pulling or pushing. 提、拉或推动重物Moving awkwardly shaped or uneven loads.搬运形状笨拙或不规则的重物Awkward body position while moving loads. 搬运重物时身体处于不适位置Repeti

27、tive movement of loads.重复性搬运重物Twisting the body to move the load. 移动重物时身体扭曲Difficult conditions e.g. uneven surfaces, poor access. 作业条件很差,如地表不平,通道狭窄Considerable force required to operate stationary equipment. 移动固定设备需要相当的力气Work with Tools, Equipment or Machinery使用工具,设备或机器进行作业Use of hand tools. 使用手动工具

28、Use of portable power tools (electrical, pneumatic, hydraulic). 使用便携式电动工具(电气、气动、液压)Use of lifting equipment or cranes 使用提升设备或起重机Use of fixed power tools/machines. 使用固定式动力工具/机器Use of mobile powered machinery. 使用移动式动力机器Contact with moving machinery (cutting, entanglement, shearing etc). 接触到运转的机器(切割,缠卷

29、和剪切等危险)Working near moving plant and machinery.在运转的设备或机器附近作业Vehicles overturning or falling into pits, water etc 车辆倾覆或掉入深坑或水里等Release of Energy能量释放Potential to release substances at pressure. 在压力下有释放物质的潜在可能Potential to release hot/cold substances.释放热/冷物质的潜在可能Potential to release flammable substances

30、. 释放可燃物质的潜在可能Potential for electric shock. 存在电击的潜在可能Potential for electric shock120v. 存在大于120v电击的潜在可能Potential to produce projectiles & particles.产生喷射与微粒尘埃的潜在可能Potential to release stored energy (springs etc). 释放储存能量的潜在可能(弹簧等)Vibration. 振动Potential for sudden movement of tools & equipment. 工具与设备突然移动的潜在可能Moving objects (rolling, uncontrolled, sudden movement). 物体移动(滚动、不受控的、突

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论