1、Coca-cola standardization office ZZ5AB-ZZS YT-ZZ2C-ZZ682T-ZZT18本科毕业设计(论文)专业外文翻译土木工程专业(道路与桥专业名称:梁)年级班级:道桥08-5班学生姓名:指导教师:二O一二年五月十八日Geometric Design of HighwaysThe road is one kind of linear construction used for travel. It is made of the roadbed, the road surface, the bridge, the culvert and the tunne
2、l. In addition, it also has the crossing of lines, the protective project and the traffic engineering and the route facility.The roadbed is the base of road surface, road shoulder, side slope, side ditch foundations. It is stone material structure, which is designed according to routes plane positio
3、n . The roadbed, as the base of travel, must guarantee that it has the enough intensity and the stability that can prevent the water and other natural disaster from corroding.The road surface is the surface of road. It is single or complex structure built with mixture. The road surface require being
4、 smooth, having enough intensity, good stability and anti- slippery function. The quality of road surface directly affects the safe, comfort and the traffic.Highway geometry designs to consider Highway Horizontal Alignment, Vertical Alignment two kinds of linear and cross- sectional composition of c
5、oordination, but also pay attention to the smooth flow of the line of sight, etc. Determine the road geometry, consider the topography, surface features, rational use of land and environmental protection factors, to make full use of the highway geometric components of reasonable size and the linear
6、combination.DesignThe alignment of a road is shown on the plane view and is a series of straight lines called tangents connected by circular. In modern practice it is common to interpose transition or spiral curves between tangents and circular curves.Alignment must be consistent. Sudden changes fro
7、m flat to sharp curves and long tangents followed by sharp curves must be avoided; otherwise, accident hazards will be created. Likewise, placing circular curves of different radii end to end (compound curves) or having a short tangent between two curves is poor practice unless suitable transitions
8、between them are provided. Long, flat curves are preferable at all times, as they are pleasing in appearance and decrease possibility of future obsolescence. However, alignment without tangents is undesirable on two-lane roads because some drivers hesitate to pass on curves. Long, flat curves should
9、 be used for small changes in direction, as short curves appear as “kink” . Also horizontal and vertical alignment must be considered together, not separately. For example, a sharp horizontal curve beginning near a crest can create a serious accident hazard.A vehicle traveling in a curved path is su
10、bject to centrifugal force. This is balanced by an equal and opposite force developed through cannot exceed certain maximums, and these controls place limits on the sharpness of curves that can be used with a design speed. Usually the sharpness of a given circular curve is indicated by its radius. H
11、owever, for alignment design, sharpness is commonly expressed in terms ofdegree of curve, which is the central angle subtended by a 100- ft length of curve. Degree of curve is inversely proportional to the radius.Tangent sections of highways carry normal cross slope; curved sections are super elevat
12、ed. Provision must be made for gradual change from one to the other. This usually involves maintaining the center line of each individual roadway at profile grade while raising the outer edge and lowering the inner edge to produce the desired super elevation is attained some distance beyond the poin
13、t of curve.If a vehicle travels at high speed on a carefully restricted path made up of tangents connected by sharp circular curve, riding is extremely uncomfortable. As the car approaches a curve, super elevation begins and the vehicle is tilted inward, but the passenger must remain vertical since
14、there is on centrifugal force requiring compensation. When the vehicle reaches the curve, full centrifugal force develops at once, and pulls the rider outward from his vertical position. To achieve a position of equilibrium he must force his body far inward. As the remaining super elevation takes ef
15、fect, further adjustment in position is required. This process is repeated in reverse order as the vehicle leaves the curve. When easement curves are introduced, the change in radius from infinity on the tangent to that of the circular curve is effected gradually so that centrifugal force also devel
16、ops gradually. By careful application of super elevation along the spiral, a smooth and gradual application of centrifugal force can be had and the roughness avoided.Easement curves have been used by the railroads for many years, but their adoption by highway agencies has come only recently. This is
17、 understandable. Railroad trains must follow the precise alignment of the tracks, and the discomfort described here can be avoided only by adopting easement curves. On the other hand, the motor-vehicle operator is free to alter his lateral position on the road and can provide his own easement curves
18、 by steering into circular curves gradually. However, this weaving within a traffic lane (but sometimes into other lanes) is dangerous. Properly designed easement curves make weaving unnecessary. It is largely for safety reasons, then, that easement curves have been widely adopted by highway agencie
19、s.For the same radius circular curve, the addition of easement curves at the ends changes the location of the curve with relation to its tangents; hence the decision regarding their use should be made before the final location survey. They point of beginning of an ordinary circular curve is usually
20、labeled the PC (point of curve) or BC (beginning of curve). Its end is marked the PT (point of tangent) or EC (end of curve). For curves that include easements, the common notation is, as stationing increases: TS (tangent to spiral), SC (spiral to circular curve), CS (circular curve to spiral), and
21、ST (spiral go tangent).On two-lane pavements provision of a wilder roadway is advisable on sharp curves. This will allow for such factors as (1) the tendency for drivers to shy away from the pavement edge, (2) increased effective transverse vehicle width because the front and rear wheels do not trac
22、k, and (3) added width because of the slanted position of the front of the vehicle to the roadway centerline. For 24-ft roadways, the added width is so small that it can be neglected. Only for 30mph design speeds and curves sharper than 220 does the added width reach 2 ft. For narrower pavements, ho
23、wever, widening assumes importance even on fairly flat curves. Recommended amounts of and procedures for curve widening are given in Geometric Design for Highways.GradesThe vertical alignment of the roadway and its effect on the safe and economical operation of the motor vehicle constitute one of th
24、e most important features of road design. The vertical alignment, which consists of a series of straight lines connected by vertical parabolic or circular curves, is known as the ugrade line. ” When the grade line is increasing from the horizontal it is known as a “plus grade, “ and when it is decre
25、asing from the horizontal it is known as a aminus grade. In analyzing grade and grade controls, the designer usually studies the effect of change in grade on the centerline profile.In the establishment of a grade, an ideal situation is one in which the cut is balanced against the fill without a grea
26、t deal of borrow or an excess of cut to be wasted. All hauls should be downhill if possible and not too long. The grade should follow the general terrain and rise and fall in the direction of the existing drainage. In mountainous country the grade may be set to balance excavation against embankment
27、as a clue toward least overall cost. In flat or prairie country it will be approximately parallel to the ground surface but sufficiently above it to allow surface drainage and, where necessary, to permit the wind to clear drifting snow. Where the road approaches or follows along streams, the height
28、of the grade line may be dictated by the expected level of flood water. Under all conditions, smooth, flowing grade lines are preferable to choppy ones of many short straight sections connected with short vertical curves.Changes of grade from plus to minus should be placed in cuts, and changes from
29、a minus grade to a plus grade should be placed in fills. This will generally give a good design, and many times it will avoid the appearance of building hills and producing depressions contrary to the general existing contours of the land. Other considerations for determining the grade line may be o
30、f more importance than the balancing of cuts and fills.Urban projects usually require a more detailed study of the controls and finer adjustment of elevations than do rural projects. It is often best to adjust the grade to meet existing conditions because of the additional expense of doing otherwise
31、.In the analysis of grade and grade control, one of the most important considerations is the effect of grades on the operating costs of the motor vehicle. An increase in gasoline consumption and a reduction in speed are apparent when grades are increase in gasoline consumption and a reduction in spe
32、ed is apparent when grades are increased. An economical approach would be to balance the added annual cost of grade reduction against the added annual cost of vehicle operation without grade reduction. An accurate solution to the problem depends on the knowledge of traffic volume and type, which can
33、 be obtained only by means of a traffic survey.While maximum grades vary a great deal in various states, AASHTO recommendations make maximum grades dependent on design speed and topography. Present practice limits grades to 5 percent of a design speed of 70 mph. For a design speed of 30 mph, maximum
34、 grades typically range from 7 to 12 percent, depending on topography. Wherever long sustained grades are used, the designer should not substantially exceed the critical length of grade without the provision of climbing lanes for slow-moving vehicles. Critical grade lengths vary from 1700 ft for a 3
35、 percent grade to 500 ft for an 8 percent grade.Long sustained grades should be less than the maximum grade on any particular section of a highway. It is often preferred to break the long sustained uniform grade by placing steeper grades at the bottom and lightening the grade near the top of the asc
36、ent. Dips in the profile grade in which vehicles may be hidden from view should also be avoided. Maximum grade forhighway is 9 percent. Standards setting minimum grades are of importance only when surface drainage is a problem as when water must be carried away in a gutter or roadside ditch. In such
37、 instances the AASHTO suggests a minimum of %.Sight DistanceFor safe vehicle operation, highway must be designed to give drivers a sufficient distance or clear version ahead so that they can avoid unexpected obstacles and can pass slower vehicles without danger. Sight distance is the length of highw
38、ay visible ahead to the driver of a vehicle. The concept of safe sight distance has two facets: u stoppingM (or no passing ) and passing .At times large objects may drop into a roadway and will do serious damage to a motor vehicle that strikes them. Again a car or truck may be forced to stop in the
39、traffic lane in the path of following vehicles. In dither instance, proper design requires that such hazards become visible at distances great enough that drivers can stop before hitting them. Further more, it is unsafe to assume that one oncoming vehicle may avoid trouble by leaving the lane in whi
40、ch it is traveling, for this might result in loss of control or collision with another vehicle.Stopping sight distance is made up of two elements. The first is the distance traveled after the obstruction comes into view but before the driver applies his brakes. During this period of perception and r
41、eaction, the vehicle travels at its initial velocity. The second distance is consumed while the driver brakes the vehicle to a stop. The first of these two distances is dependent on the speed of the vehicle and the perception time and brake-reaction time of the operator. The second distance depends
42、on the speed of the vehicle; the condition of brakes, times, and roadway surface; and the alignment and grade of the highway.On two-lane highways, opportunity to pass slow-moving vehicles must be provided at intervals. Otherwise capacity decreases and accidents increase as impatient drivers risk hea
43、d-on collisions by passing when it is unsafe to do so. The minimum distance ahead that must be clear to permit safe passing is called the passing sight distance. In deciding whether or not to pass another vehicle, the driver must weigh the clear distance available to him against the distance require
44、d to carry out the sequence of events that make up the passing maneuver. Among the factors that will influence his decision are the degree of caution that he exercises and the accelerating ability of his vehicle. Because humans differ markedly, passing practices, which depend largely on human judgme
45、nt and behavior rather than on the laws of mechanics, vary considerably among drivers.The geometric design is to ensure highway traffic safety foundation, the highway construction projects around the other highway on geometric design, therefore, in the geometry of the highway design process, if appe
46、ar any unsafe potential factors, or low levels of combination of design, will affect the whole highway geometric design quality, and the safety of the traffic to bring adverse impact. So, on the geometry of the highway design must be focus on.公路几何设计公路是供汽车或其他车辆行驶的一种线形带状结构体。它是由路 基、路面、桥梁、涵洞和隧道组成。此外,它还有
47、路线交叉、工程和交 通工程及沿线设施。路基是路面、路肩、边坡、等部分的基础。它是按照路线的平面位 置在地面上开挖和成的土物。路基作为行车部分的基础,必须保证它有 足够的强度和稳定性,可以防止水及其他自然灾害的侵蚀。路面是公路表面的部分。它是用混合料铺筑的单层或多层结构物。 路面要求光滑,具有足够的强度,稳定性好和抗湿滑功能。路面质量的 好环,直接影响到行车的安全性、舒适性和通行。公路儿何线形设计要考虑公路平面线形、纵断面线形两种线形以及 横断面的组成相协调,还要注意视距的畅通等等。确定公路儿何线形 时,在考虑地形、地物、土地的合理利用及环境保护因素时,要充分利 用公路儿何组成部分的合理尺寸和线
48、形组合。1、线形设计道路的线形反映在平面图上是由一系列的直线和与直线相连的圆曲 线构成的。现代设计时常在直线与圆曲线之间插入缓和曲线。线形应是连续的,应避免平缓线形到小半径曲线的突变或者长直线 末端与小半径曲线相连接的突然变化,否则会发生交通事故。同样,不 同半径的圆弧首尾相接(曲线)或在两半径不同的圆弧之间插入短直线 都是不良的线形,除非在圆弧之间插入缓和曲线。长而平缓的曲线在任 何时候都是可取的,因为这种曲线线形优美,将来也不会废弃。然而, 双向道路线形全由曲线构成也是不理想的,因为一些驾驶员通过曲线路 段时总是犹豫。长而缓的曲线应用在拐角较小的地方。如果采用短曲 线,则会出现“扭结”。另
49、外,线路的平、纵断面设计应综合考虑,而 不应只顾其一,不顾其二,例如,当平曲线的起点位于竖曲线的顶点附 近时将会产生严重的交通事故。行驶在曲线路段上的车辆受到离心力的作用,就需要一个大小相同 方向相反的由超高和侧向磨擦提供的力抵消它,这些控制值对于某一规 定设计车速可能采用曲线的曲率作了限制。通常情况下,某一圆曲线的 曲率是由其半径来体现的。而对于线形设计而言,曲率常常通过曲线的 程度来描述,即100英尺长的曲线所对应的中心角,曲线的程度与曲线 的半径成反比。公路的直线地段设置正常的路拱,而曲线地段则设置超高,在正常 断面与超高断面之间必须设置过渡渐变路段。通常的做法是维持道路每 一条中线设计
50、标高不变,通过抬高外侧边缘,降低内侧边缘以形成所需 的超高,对于直线与圆曲线直接相连的线形,超高应从未到达曲线之前 的直线上开始,在曲线顶点另一端一定距离以外达到全部超高。如果车辆以高速度行驶在直线与小半径的圆曲线相连的路段,行车 是极不舒服。汽车驶近曲线路段时,超高开始,车辆向内侧倾斜,但乘 客须维持身体的垂直状态,因为此时未受到离心力的作用。当汽车到达 曲线路段时,离心力突然产生,迫使乘客向外倾斜,为了维持平衡,乘 客必须迫使自己的身体向内侧倾斜。由于剩余超高发挥作用,乘客须作 进一步的姿势的调整。当汽车离开曲线时,上述过程刚好相反。插入缓 和曲线后,半径从无穷大逐渐过渡到圆曲线上的某一固
51、定值,离心力逐 渐增大,沿缓和曲线心设置超高,离心力平稳逐渐增加,避免了行车颠 簸。缓和曲线在铁路上已经使用多年,但在公路上最近才得以应用,这 是可以理解的。火车必须遵循精确的运行轨道,采用缓和曲线后,上述 那种不舒服的感觉才能消除。然而,汽车司机在公路上可以随意改变侧 向位置,通过迂回进入圆曲线来为自己提供缓和曲线。但是在一个车道 上(有时在其他车道上)做这种迂回行驶是非常危险的。设计合理的缓 和曲线使得上述迂回没有必要。主要是出于安全原因,公路部门广泛采 用了缓和曲线。对于半径相同的圆曲线来说,在未端加上缓和曲线就会改变曲线与 直线的相关位置,因此应在最终定线勘测之前应决定是否采用缓和曲 线。一般曲线的起点标为PC或BC,终点标为PT或EC。对含有缓和曲线 的曲线,通常的标记配置增为:TC、SC、CS和ST。对于双向道路,急弯 处应增加路面宽度,这主要基于以下因素:(1)驾驶员害怕驶出路面边 缘;(2)由于车辆前轮和后轮的行驶轨迹不同,车辆有效横向宽度加 大;(3)车辆前方相对于公路中线倾斜而增加的宽度。对于宽度为24 英尺的道路,增加的宽度很小,可以忽略。只有当设计车速为 30mile/h,且曲度大于22时,加宽可达2英尺。然而,对于较窄的路 面,即使是在较平缓的曲线路段上,加宽也是很重要推荐加宽值及加宽 设计见公路线形设计2、纵坡线公路的
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026年海南政法职业学院单招职业适应性考试模拟试题及答案解析
- 2026年三明医学科技职业学院单招职业适应性考试模拟试题及答案解析
- 2026年河北东方学院单招职业适应性考试模拟试题及答案解析
- 2026年湖北艺术职业学院单招职业适应性测试模拟试题及答案解析
- 医疗信息化在内部管理中的应用研究
- 儿科护理技能培训实战指南
- 2026年教师资格证(物理教学能力)自测试题及答案
- 2025年合肥庐江县工业投资有限公司公开招聘工作人员5名参考笔试题库及答案解析
- 2026上半年河南郑州理工职业学院招聘9人模拟笔试试题及答案解析
- 2025广西医科大学附属武鸣医院招聘高层次人才15人备考笔试试题及答案解析
- 穿脱无菌手术衣课件
- 控制性低中心静脉压技术
- 西游记大闹天宫
- 胰腺癌课件教学课件
- 2025年N1叉车司机模拟考试1000题及答案
- 国家开放大学机考答案6个人与团队管理2025-06-21
- GB/T 25383-2025风能发电系统风力发电机组风轮叶片
- 八五普法考试试题及答案
- T/CCT 004-2020煤用浮选起泡剂技术条件
- 2024-2025学年人教版(2024)初中生物七年级上册期末综合检测卷及参考答案
- 消防文员宣笔试题及答案
评论
0/150
提交评论