1、PAGE x OF x COMMISSIONING PROCEDURE FOR SCREW PUMP COMMISSIONING PROCEDURE FORXXX PROJECTJOB NO. XXXCOSIGNDISCIPLINESIGNATUREDATEMACHINERYJOBCOST CENTER NO. XXXWBS ELEMENT: XXXPAGE X OF XXXX.XX.XXREV.DATEDESCRIPTIONBYCH K.REV W.EXAM.APPRO.CLIENTXXXCERTIFI. NO.COMMISSIONING PROCEDURE FOR SCREW PUMPDO
2、CUMENT NO.XXXCMT-XXXX-XX-XXXX (CMT-项目名称-专业-编号)CONTENTS1. TOC o 1-2 h z u HYPERLINK l _Toc155239509 PURPOSE2. HYPERLINK l _Toc155239510 CODES AND STANDARDS3. HYPERLINK l _Toc155239511 DOCUMENTS AND DRAWINGS4. HYPERLINK l _Toc155239512 ENVIRONMENT AND SAFETY5. HYPERLINK l _Toc155239513 RESOURCE REQUIR
3、EMENT6. HYPERLINK l _Toc155239514 COMMISSIONING7. HYPERLINK l _Toc155239517 AFTER TEST CHECKCOMMISSIONING PROCEDURE FORSCREW PUMP螺杆泵调试程序PURPOSE INDEX o S c 2 z 2052 目的The following provides the commissioning procedures for the inspection, testing and commissioning of screw pump xx project, verify th
4、e equipment can also achieves its design intent and operability as specified in the technical contract after transportation and installation.本调试程序包括淡螺杆泵的检查、测试以及调试,以确保该设备在经历运输和安装后,各项功能指标符合技术合同中的设计目的和操作要求。CODES AND STANDARDS 依据的准则和标准DOCUMENTS AND DRAWINGS 参考的文件与图纸ENVIRONMENT AND SAFETY 环境和安全Commission
5、ing work should be prepared to prevent frostbite when the environment temperature is below 5.当环境温度低于五度是要有防冻措施Ensure the commissioning area is cleaning. 确保调试区域整洁Ensure the place of caution brand is marked.调试区域要悬挂警示牌RESOURCE REQUIREMENT调试资源PERSONNEL ORGANIZATION 人员组织Commissioning manager arrange the w
6、ork. His job consists of putting up the commissioning inform, holding a commissioning warming-up meeting include of JSA.调试经理负责安排,包括调试安排的通知,主持召开包括JSA在内的调试准备会议。The main commissioning engineer (MCE) is mechanical engineer, the assistant commissioning engineers are electrical commissioning engineer, ins
7、trument commissioning engineer and piping engineer. 机械工程师作为主调工程师,辅调工程师包括电器工程师、仪表工程师和工艺工程师。All participants must obey the order of MCE.所有参加调试人员必须听从主调工程师指挥。People partake in commissioning on site: commissioning engineers, Owner, Third party, inspector, Vendor service, QHSE. 参加调试的人员包括:调试工程师、业主、第三方、检验、厂
8、家、QHSE TOOLS AND TEMPORARY EQUIPMENT 调试工具和临时设备Megger (0-500M)兆欧表Voltage meter (0-500V)电压表Multi meter万用表Anemometer (0-20m/s)风速仪Infrared thermometers红外线测温仪Tachometer (3500rpm)转速仪Vibration meter振动表Noise meter噪音仪Clamp on ampere meter (0-500A)钳形电流表Interphone对讲机Special tools by vendor厂家提供的专用工具COMMISSIONIN
9、G调试CHECK BEFORE COMMISSIONING 调试前的检查Completion condition check 完工状态检查Make sure all the preparative work has been completed according to the commissioning project, including all the temporary piping, electric loops and so on. 确定所有的准备工作已经按照调试方案完成,包括所有的临时管线和电缆等。Compare the nameplates on the equipment w
10、ith data sheet, and make sure it is correct. 按照数据表核对设备的铭牌,确定其正确。Check installation is in accordance with the mounting drawing 按照安装图纸检查设备的安装Verifying record of installation inspection, alignment, NDT according to the installation diagram. 根据安装图检查安装报告、对中报告和无损探伤报告Check the record of installation, sweep
11、, gas seal test, NDT, hydrostatic test and leaking test of piping system according to the piping diagram.根据管线图检查管线的安装报告、吹扫报告、气密报告、NDT记录和水压试验记录。Confirm all instrument have been calibrated, check the calibration certificate and the record of installation inspection and instrument cable according to th
12、e instrument diagram.确定所有的仪表都已检定完毕,检查检定证书和根据仪表布置图检查仪表的安装以及电缆的连接。Check the record of installation, power cable and control cable test according to the wiring diagram.根据布线图对电源线和控制线进行校线。Insulation check绝缘检查The earthing check of motor and control panel.检查电机和控制盘的接地Check the cold insulation resistance of
13、the motor for pump.检查电机的冷态绝缘External appearance check 外观检查Make sure the exterior of equipment is intact. 确定设备外观完整无损Check that all packing materials and protective devices used during transport and handling have been removed from the equipment.确定所有包装材料和在运输和吊装过程中的保护装置都已拆除Check the welding between base
14、 and deck.检查设备与甲板间的焊接All bolts and nuts have been tightened.确定所有的螺栓都已上紧Check the connection of pipelines to make sure that it has been completed according to PI&D.根据PI&D检查所有管线的连接都已完成Ensure the pipelines are clean, and there is no corrosion or impurity.确定所有的管线内部清洁,没有腐蚀物和杂物Make sure the flanges and in
15、struments had been installed correctly.确定所有的法兰和仪表都安装正确Check and confirm that the buttons and lights on the control panel can work normally.确定控制盘上的按钮和灯工作正常Ensure the push-buttons are normal.确定所有的急停按钮工作正常The electrical installation and wire connection should be in accordance with the circuit diagram,
16、and each joint should be a reliable touch.检查所有的电气设备的安装和电线的连接正确,电线的接头牢固Check IP grade of the engine.检查电机的IP等级Confirm the rotating direction of the pump is correct.确定泵的转向正确Commissioning condition check 调试条件检查Check the power supply.检查动力供应Required lube oil and grease should be prepared and filled.调试所需的滑
17、油和油脂填充和准备完毕FUNCTION TEST功能测试Pump startup启泵Open the valve in the suction and discharging line of the pump to let the liquid fill in the pump and vent the air. 打开泵进出口的阀门,使流体进入泵内以排出空气Startup the pump through the local panel to confirm the pump is started. 在就地盘启动泵Stop the pump, then start it through the
18、 remote control, make sure the pump is started. 停泵,然后再远程控制盘启动泵Measure and record the starting current of the motor.记录启动电流Running test运行测试Startup the pump, close the valve in the discharging line of pump slowly until get the operating pressure.启动泵,然后缓慢打开泵出口阀门,当出口压力达到最大操作压力后将出口阀门打到全开。The pumps should
19、be run continually for 2 hours at least. 连续运行泵最少两个小时Check leakage of mechanical seal and lube oil seal. 检查机械密封和滑油密封Record the performance parameters as follow every 30mins. 每三十分钟记录一次以下运行参数Measure and record the noise of the pump (75-90dB). If the difference between environmental noise and measured v
20、alue is grater than or equal to 6-10 dB, the measured values are insignificant. 记录泵的噪声。所测噪声与环境噪声之差不能大于或等于6-10 dBMeasure and record the vibration of the pump. 记录泵的振动Measure and record the pressure in the drain of pump. 记录泵的出口压力Measure and record the actual rotational speed of the motor. 记录马达的实际转速Measure and record the current and voltage of the motor at the rated condition. 记录马达的额定电流和电压Measure and record the temperature of bearing of the pump. 记录泵轴承温度Stop 停泵Stop the pump through the local panel. 在就地盘停泵Stop the pump through the remote control. 在远程控制盘停泵Simulate ESD and c
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 手工艺术师考试题及答案
- 社团工作考试题及答案
- 社会体育章节试题及答案
- 轻化工计算机考试题目及答案
- 脊柱调理小知识分享课件
- 辅警交管业务培训课件
- 辅助执法人员培训课件
- 床旁CRRT在妊娠期高血压疾病中的应用
- 2026年深圳中考语文模块通关检测试卷(附答案可下载)
- 2026年大学大二(口腔医学技术)口腔颌面外科技术阶段测试题及答案
- 苏州高新区(虎丘区)市场监督管理局公益性岗位招聘1人考试参考题库及答案解析
- 《直肠癌NCCN治疗指南》课件
- 江西省九江市2024-2025学年九年级上期末考试英语试题
- 二人合伙土地种植合同
- 湖南省张家界市永定区2024-2025学年八年级上学期期末考试数学试题(含答案)
- 环境监测岗位职业技能考试题库含答案
- 路灯基础现浇混凝土检验批质量验收记录
- 化学品作业场所安全警示标志大全
- 矿卡司机安全教育考试卷(带答案)
- 中建浅圆仓漏斗模板支撑架安全专项施工方案
- 新能源材料与器件PPT完整全套教学课件
评论
0/150
提交评论