



版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、文件种类S Drafted Checked Reviewed Approved Modification-ACHENGGANG NUCLEARPHASE (21000MW) PROJECT文件编文件种类S Drafted Checked Reviewed Approved Modification-ACHENGGANG NUCLEARPHASE (21000MW) PROJECT文件编DOC. 48VLCA4LCA -48V DCER SUPPLY SYSTEM MANUALCHAPTER4DESCRIPTIONANDDEFINITIONOF工程Project文件类子项Sub-Item设计阶E
2、ngineeringCA:LCA/LCB -48V DC B:C:工国家甲级 工咨甲中广核工程设NationalAgradeengineeringCertificationNO:CHINA ERDESIGNNationalAgradeengineeringCertificationNO:编ernalis the property of CNPDC It must not be used、reproduced、transmitted or disclosed without the prior written permis of CNPDC 本文件之 属于中广核工程设计 。未获本公司 ,任何人不
3、得擅自使用、 、传递或 该文件。LCA -48V DCER SUPPLY SYSTEM MANUAL CHAPTER 4 DESCRIPTION AND DEFINITION OF EQUIPMENTRev版版日状编Drafted校Checked审Reviewed批Approved修改说Modification-LCA -48V DCER SUPPLY SYSTEM MANUAL CHAPTER 4 DESCRIPTION AND DEFINITION OF EQUIPMENTRev版版日状编Drafted校Checked审Reviewed批Approved修改说Modification-LC
4、A -48V DCER SUPPLY SYSTEM MANUAL CHAPTER 4 DESCRIPTION AND DEFINITION OF EQUIPMENTRev文件修LCA -48V DCER SUPPLY SYSTEM MANUAL CHAPTER 4 DESCRIPTION AND DEFINITION OF EQUIPMENTRev文件修A2010-2-LCA -48V DCER SUPPLY SYSTEM MANUAL CHAPTER 4 DESCRIPTION AND DEFINITION OF EQUIPMENTRev4DESCRIPTIONLCA -48V DCER S
5、UPPLY SYSTEM MANUAL CHAPTER 4 DESCRIPTION AND DEFINITION OF EQUIPMENTRev4DESCRIPTIONANDDEFINITIONOFLCA -48V ER SUPPLY SYSTEM MANUAL CHAPTER Rev 4DESCRIPTIONANDLCA -48V ER SUPPLY SYSTEM MANUAL CHAPTER Rev 4DESCRIPTIONANDDEFINITIONOF4.2 4.1.1 ThesystemDistributionswitchboardtedoutgoing ing380VACpplyin
6、g the with other LCA 4.2.1 Thebatteryisofthelead-acidtypewithitivetubularEquipmentRated NumberofCapacity C/10 Recharge/VoltagePer2.33 53.6 380Ver : fromLKE and :see9.2(switchboardMonitoring of LCA:viaLNE220VAC,48VDC Plant Computer Information & Control: KICMainControl:Grounding:BatteriesTestLoops:LY
7、S1-LCA -48V ER SUPPLY SYSTEM MANUAL CHAPTER Rev LCA -48V ER SUPPLY SYSTEM MANUAL CHAPTER Rev Voltage2.23 51.3 Beginningofdischarge(V) End of discharge (V)AboutAbout42.8 Specificgravityatend ofchargeat 25electrolyte um 1.26 (1)Hastobecheckedbythe4.2.2 Charger components are mourned in a cabinet air-c
8、ooled by natural convection. Current is rectified by sicbridgerectifierswhichcontaindiodesandthyristors.ersemiconductorsareprotectedbyfast-actingerruptingcapacityThechargerisprovidedwithover-currentlimitprotectiontoprecludecharger overheating and prevent component damage.sories(regulatingequipmentan
9、dvoltagemonitor)aremountedonplug-insible enance/measurementEquipmentRatedcurrentAveragefloatvoltageAveragerecharge/equalizevoltageer inpurecharge/equalizeunder full load conditions (kW)Efficiencyatrecharge/equalizeunderfull load conditions (%)erfactoratrecharge/equalizeunder full load conditionsVolt
10、ageadjustmentrange51.3 53.6 .least LCA -48V ER SUPPLY SYSTEM MANUAL CHAPTER Rev LCA -48V ER SUPPLY SYSTEM MANUAL CHAPTER Rev . .manual- Battery over-current setpooperation (A)eastSee-Chargerover-currentprotection: The setpoindicated corresponds to a preliminary setting in factory. Its final value de
11、pends on the voltage drnthechargerandthebatteryduringoperationinfloat mode. This setting is to be adjusted on site to obtain about 51.3V (2.23V x 23 cells) at battery terminals. It must not exceed 54V.: The setpoindicated corresponds to a preliminary setting in factory. Its final value depends on th
12、e voltage drn the charger and the battery during operation in recharge/equalizemode.Thissettingisto beadjustedonsitetoobtainabout53.6(2.33V x 23 cells) at battery terminals. It must not exceed 54V.4.2.3 Distribution switchboard - circuit-breakers - instrumenEquipment code: 001TB.Manufacturer:tobedef
13、ined. Type: to be defined.ThemainhorizontalbushasverticalbranchestotheAllbreakersarewithdrawableandcanbeheThe batterying breaker is equipped wi2-polemagneticreleaseforshort-circuit protection, actuated by two sts and time-delayed to provide selective tripEach ingbreaker isequipped a 2-pole magnetic
14、release for short-circuit protection, actuated by two stsand time-delayed to provide selective tripAthermalreleaseforMechanicalindicatorsareprovidedtoindicateingbreakersand380VACbusbreakersheeventofcharger4.2.3.1 -RatedvoltageLCA -48V ER SUPPLY SYSTEM MANUAL CHAPTER Rev LCA -48V ER SUPPLY SYSTEM MAN
15、UAL CHAPTER Rev VoltagerangePK-PKRatedinsulationvoltageumcontinuousbuscurrentRatedshort-circuitcurrent39-norequalto3% 4.2.3.2 ing Equipment-RatedvoltageRatedBreakingcapacityThermalMagnetic.timedelay . current setting . range of Rated current of stsat60C(1per Short-erruptingtime4.2.3.3 ing EquipmentR
16、atedvoltageRated60C003 & LCA -48V ER SUPPLY SYSTEM MANUAL CHAPTER Rev BreakingcapacityThermal-LCA -48V ER SUPPLY SYSTEM MANUAL CHAPTER Rev BreakingcapacityThermal-Magnetic.timedelay . current setting . Range of *mini*maxi-Ratedcurrentoftsat 60(1-Short-erruptingtime-erdrawunder48V4.2.3.4 Outgoing Equ
17、ipment-RatedvoltageRated60CThermalreleasesettingat40CMagneticreleasesettingBreakingcapacityShort-erruptingtimeSeeSee8:Switchboard:Hastobecheckedbythe4.2.3.5BatterydischargetestLCA -48V ER SUPPLY SYSTEM MANUAL CHAPTER RevLCA -48V ER SUPPLY SYSTEM MANUAL CHAPTER Rev EquipmentRatedvoltageRated60CBreaki
18、ngcapacityThermal. current setting at 40Magnetic. current setting . range of *mini*maxi-Short-erruptingtime4.2.3.6ChargerACbusEquipment-RatedvoltageRatedcurrentThermalreleasesettingal60CMagneticreleasesetting(1)Hastobecheckedbythe4.2.3.7 Ground System insulationegrityismonitoredcontinuously.Thisisdo
19、nebymonitoringcurrent flow betn an arbitrary poon the network and ground.When a conductor-to-ground fault occurs and current exceeds a preset value,armis The above also provides a means of manually measurinerall insulationFor LCA system, two other alarm contacts are actuated in case of:insulationfau
20、lttednotherDCorACvoltageLCA -48V ER SUPPLY SYSTEM MANUAL CHAPTER Rev LCA -48V ER SUPPLY SYSTEM MANUAL CHAPTER Rev LCAGroundetectionEquipment-RatedvoltageAdjustablerange(k(kFaults are located using a portable signal generator (type to be defined) and a portable detector with cl-on ammeter (type to be
21、 defined). Both these deviaresharedby er sourThesewilllocatethefaultwiththesystemA socket (002 PJ) is provided for connecting a mobile ground fauetectorforperiods when the 220 V AC supply is out of service.4.2.3.8 Voltage Voltage monitoring is achieved by a voltage sensing relay, mounted in a rack,
22、with 2 thresholds(overvoltage,undervoltage)whichactuatealarmcontactswhicharegrouped t one alarm signal (overvoltage or undervoltage) is transmitted to the alarmsingEquipmentRatingLowvoltagesettingHighvoltagesetting(1)HastobeconfirmedbyThe low voltage setting indicatestthebatteryisbeingdischargedandiscapableof operating for about another half-an-hour.The high voltage setting indicates chargervoltageregulator LCA -48V ER SUPPLY SYSTEM MANUAL CHAPTE
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025至2030中国电动观光车行业发展分析及市场占有率及有效策略与实施路径评估报告
- 餐饮行业食堂员工食品安全培训计划
- 餐饮娱乐结合项目计划书范文
- 创意办公室装饰施工进度及保证措施
- 打造智能导航门诊引导措施
- 有关个人自查报告模板(3篇)
- 园林绿化灾害应对多部门协作措施
- 觉醒年代观后感心得体会提升技巧
- 小学三年级英语期末复习题型训练计划
- 2024-2025小学班主任学生安全教育计划
- 2025年全国交管12123驾驶证学法减分(学法免分)考试题含参考答案
- 2025年工业互联网平台边缘计算硬件架构边缘计算数据处理技术分析报告
- 养老机构消毒培训课件
- 公司部门管理办法分享
- 2025年资阳市税务系统遴选面试真题附解析含答案
- 2025年北京市中考招生考试数学真题试卷(真题+答案)
- 护理规培带教老师竞聘
- 农村安全生产宣讲材料
- 建筑现场勘测方案(3篇)
- 2023年工业企业会计制度2
- 火电厂危化品知识培训
评论
0/150
提交评论