版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
PAGE/r/n77/r/n//r/nNUMPAGES/r/n82/r/n/r/n目/r/n/r/n录/r/n/r/n/r/n/r/n/r/n/r/n/r/n1/r/n编制讲明及依据/r/n /r/n/r/n1/r/n/r/n/r/n/r/n1.1/r/n编制讲明/r/n /r/n/r/n1/r/n/r/n/r/n/r/n1.2/r/n编制依据/r/n /r/n/r/n1/r/n/r/n/r/n/r/n2/r/n工程概况/r/n /r/n/r/n1/r/n/r/n/r/n/r/n3/r/n施工顺序与施工方法/r/n /r/n/r/n3/r/n/r/n/r/n/r/n3.1/r/n基础验收/r/n /r/n/r/n3/r/n/r/n/r/n/r/n3.2/r/n钢构件的检验/r/n /r/n/r/n3/r/n/r/n/r/n/r/n3.3/r/n安装程序和要紧施工方法/r/n /r/n/r/n4/r/n/r/n/r/n/r/n3.4/r/n高强度螺栓的安装方法/r/n /r/n/r/n7/r/n/r/n/r/n/r/n3.4.1/r/n施工预备/r/n /r/n/r/n7/r/n/r/n/r/n/r/n3.4.2/r/n扭剪型高强度螺栓的施工程序/r/n /r/n/r/n8/r/n/r/n/r/n/r/n3.4.3/r/n高强螺栓的安装/r/n /r/n/r/n9/r/n/r/n/r/n/r/n3.5/r/n钢构件的焊接/r/n /r/n/r/n11/r/n/r/n/r/n/r/n3.5.1/r/n焊接前预备/r/n /r/n/r/n11/r/n/r/n/r/n/r/n3.5.2/r/n焊接工艺参数/r/n /r/n/r/n11/r/n/r/n/r/n/r/n3.5.3/r/n焊接工艺要求/r/n /r/n/r/n11/r/n/r/n/r/n/r/n3.6/r/n钢结构的安装/r/n /r/n/r/n15/r/n/r/n/r/n/r/n3.6.1/r/n钢结构立/r/n柱及主梁平面图/r/n /r/n/r/n15/r/n/r/n/r/n/r/n3.6.2/r/n吊装机械的选择/r/n /r/n/r/n16/r/n/r/n/r/n/r/n3.6.3/r/n安装顺序、构件吊装、架子搭设及采取的措施/r/n /r/n/r/n17/r/n/r/n/r/n/r/n3.6.4/r/n安装的同意偏差/r/n /r/n/r/n21/r/n/r/n/r/n/r/n3.7/r/n钢结构涂装/r/n /r/n/r/n22/r/n/r/n/r/n/r/n3.8/r/n压型板安装/r/n /r/n/r/n23/r/n/r/n/r/n/r/n4/r/n施工进度网络打算安排/r/n /r/n/r/n23/r/n/r/n/r/n/r/n5/r/n劳动力打算安排/r/n /r/n/r/n23/r/n/r/n/r/n/r/n6/r/n质量保证措施和安装质量检验打算/r/n /r/n/r/n24/r/n/r/n/r/n/r/n7/r/n质量保证体系及质量检查程序/r/n /r/n/r/n25/r/n/r/n/r/n/r/n7.1/r/n质量保证体系/r/n /r/n/r/n25/r/n/r/n/r/n/r/n7.2/r/n质量检查程序/r/n /r/n/r/n26/r/n/r/n/r/n/r/n8/r/n安全技术措施/r/n /r/n/r/n26/r/n/r/n/r/n/r/n9/r/n煤气化框架/r/n钢结构/r/n施工应急救援预案/r/n /r/n/r/n29/r/n/r/n/r/n/r/n9.1/r/n总则/r/n /r/n/r/n29/r/n/r/n/r/n/r/n9.2/r/n应急救援机构及职责/r/n /r/n/r/n29/r/n/r/n/r/n/r/n9.3/r/n应急救援程序/r/n /r/n/r/n31/r/n/r/n/r/n/r/n9.4/r/n应急预备/r/n /r/n/r/n31/r/n/r/n/r/n/r/n9.5/r/n应急响应/r/n /r/n/r/n32/r/n/r/n/r/n/r/n9.6/r/n现场恢复/r/n /r/n/r/n33/r/n/r/n/r/n/r/n9.7/r/n应急结束/r/n /r/n/r/n33/r/n/r/n/r/n/r/n9.8/r/n现场应急救援措施/r/n /r/n/r/n33/r/n/r/n/r/n/r/n9.9/r/n救援器材/r/n /r/n/r/n35/r/n/r/n/r/n/r/n10/r/n施工组织措施/r/n /r/n/r/n35/r/n/r/n/r/n/r/n10.1/r/n劳动力组织/r/n /r/n/r/n35/r/n/r/n/r/n/r/n10.2/r/n治理组织/r/n /r/n/r/n35/r/n/r/n/r/n/r/n10/r/n要紧施工机具一览表/r/n /r/n/r/n36/r/n/r/n/r/n/r/n11/r/n要紧手段用料一缆表/r/n /r/n/r/n38/r/n/r/n/r/n/r/n12/r/n施工进度打算网络图/r/n /r/n/r/n40/r/n/r/n/r/n/r/n13/r/n施工现场平面布置图/r/n /r/n/r/n41/r/n/r/n/r/n/r/n14/r/n附图钢结构吊装示意图/r/n /r/n/r/n42/r/n/r/n/r/n/r/n15/r/n附表/r/n/r/n钢结构安装检验批划分表/r/n /r/n/r/n45/r/n/r/n/r/n/r/n16/r/n附图/r/n/r/n钢结构安装工艺流程图/r/n /r/n/r/n46/r/n/r/n煤气化装置钢结构安装施工方案/r/n1/r/n编制讲明及依据/r/n1.1/r/n编制讲明/r/n1/r/n)/r/n煤气化装置钢结构由甘肃省石油化工设计院设计,六冶钢结构建设有限公司制作和预组装,我公司承担现场施工。/r/n2)/r/n由于该工程要求工期紧,且煤气化装置又具有高度高、吨位重、面积大等特点,钢结构施工又是整个煤气化装置施工进度网络打算中的关键线路,因此钢结构的设计、制作应尽快完成,/r/n构件的加工顺序要按照现场结构的安装顺序组织生产和运输(包括爬梯和楼层平面用的钢格板),确保构件制作与安装形成均衡、合理的流水施工,以保证整体网络施工打算的顺利实施。/r/n3)/r/n工厂内进行构件的制作要按照图纸严格操纵构件的加工精度,对构件安装要求较高的部位要求工厂内进行预组装,并填写预组装记录。/r/n1.2/r/n编制依据/r/n1)/r/n/r/n气化单元钢结构详细工程设计/r/n;/r/n2)/r/n/r/n《钢结构工程施工质量验收规范》(/r/nGB50205/r/n-/r/n2001/r/n);/r/n3)/r/n/r/n《钢结构高强度螺栓连接的设计、施工及验收规程》(/r/nJGJ82/r/n-/r/n91/r/n);/r/n4)/r/n/r/n《气化单元结构设计讲明》;/r/n5)/r/n/r/n《建筑钢结构焊接技术规程》(/r/nJGJ81/r/n-2002/r/n);/r/n6/r/n)/r/n/r/n《/r/n钢结构工程便携手册/r/n》(机械工业出版社)。/r/n2/r/n工程概况/r/n1/r/n)/r/n煤气化装置框架由混凝土结构框架和钢结构框架组合而成。标高/r/n+/r/n31.98/r/n米(含+/r/n3/r/n1.98米)以下为混凝土结构框架,标高/r/n+3/r/n1.98/r/n米至/r/n+/r/n72.83/r/n米为箱型柱钢结构框架。钢结构框架共分八层,东西长/r/n30/r/n米,南北宽/r/n2/r/n0/r/n米,楼梯间及电梯井宽4米,占地面积640米/r/n2/r/n。南北共有三跨,跨距分不为4米、10米、10米;东西方向共四个柱距,柱距分不为10/r/n米/r/n、10米、10米。/r/n2)/r/n钢结构主体框架立柱采纳焊接箱型柱,尺寸为/r/n7/r/n00/r/n×/r/n7/r/n00/r/n×/r/n28/r/n(mm)/r/n、5/r/n00/r/n×/r/n5/r/n00/r/n×/r/n28/r/n(mm)/r/n,材质为/r/nQ235/r/n-C/r/n;梁采纳/r/nH/r/n型钢,最大规格/r/nH/r/nN10/r/n00/r/n×/r/n5/r/n00/r/n(mm),最小规格/r/nH/r/nN15/r/n0/r/n×/r/n75(mm),主梁及钢支撑为/r/nQ235/r/n-C,次梁为/r/nQ235/r/n-B;/r/n楼面板除+38.83米、+72.83米为混凝土楼面外,其余楼面板、/r/n操作/r/n平台/r/n、走道、钢/r/n梯踏板全为/r/n压焊防滑型热浸锌钢格/r/n板/r/nZG323/30/100;钢楼面上预留方孔的四角,在设备就位后依照需要现场放样铺设6mm厚花纹钢板,并沿斜边设加筋板,铺板与设备外形的净距为5mm。/r/n3/r/n)/r/n+31.98米以下有/r/n5000mm箱型钢柱与混凝土柱子采纳固定式连接,连接后外包混凝土形成一体;/r/n4/r/n)/r/n钢框架柱每二至三层为一节,/r/n柱与柱之间采纳对接单边V型坡口全溶透焊缝。框架梁(包括悬臂梁)与框架之间的连接均为刚接,连接时,预先在工厂进行柱与悬臂梁段全熔透坡口焊接,框架梁与柱悬臂梁段现场拼接,上、下翼缘为带垫板的V型坡口熔透焊,腹板为高强度螺栓连接;主梁与次梁、次梁与次梁连接为高强螺栓连接;框架柱间垂直支撑与框架连接处在工厂预先设置悬臂杆与梁柱连接,支撑杆件在工地拼接,翼缘采纳全熔透坡口焊,腹板采纳高强度螺栓连接。高强度螺栓为/r/n10.9s/r/n级/r/n扭剪型高强度螺栓。/r/n/r/n5/r/n)/r/n钢结构框架总重量约为/r/n15/r/n00/r/n吨(不含围护结构),单件最大重量可能12吨左右。钢结构安装具有施工程序复杂、施工难度大等特点,/r/n且/r/n安装在框架内的设备/r/n吨位重、体积大。这些设备有的必须在钢结构之前进行安装,如V1205等;有的必须和钢结构的安装交叉进行吊装,如V1204、V1201、F-1301等;有的需要在主体框架安装后才能进行吊装,如S1201等。因此钢结构施工时部分立柱和连接梁需要预留,或与设备安装进行交叉施工,待设备安装后再进行预留钢构件的安装。/r/n3/r/n施工顺序与施工方法/r/n3.1/r/n基础验收/r/n1/r/n)/r/n首层箱型钢柱与混凝土柱子采纳固定式连接,钢结构施工前已由土建单位安装完成。/r/n2)/r/n钢结构安装前必须对首层柱进行复验,复验的要紧项目有:建筑物定位轴线、标高、垂直度、平面位置、柱的几何尺寸、柱的定位轴线、基础画线等。其同意偏差见下表:/r/n项目/r/n建筑物/r/n定位轴线/r/n柱的/r/n定位轴线/r/n柱基准点标高/r/n柱垂直度/r/n(mm)/r/n柱顶相对高差(mm)/r/n同意偏差/r/nL/20000,且不大于3.0/r/n1.0/r/n±/r/n2.0/r/nH/1000,且/r/n≤/r/n10/r/n5/r/n3.2/r/n钢构件的检验/r/n在装置区附近,在不阻碍吊车来回行走的情况下,事先用/r/nH/r/n型钢及道木搭设一个/r/n15/r/n×/r/n20/r/n米的临时钢平台,用以钢构件检验和组对;该装置的钢结构构件由业主托付钢结构预制厂制作,因此现场安装单位应加强到货构件的质量、数量校验。/r/n钢构件的制作必须按设计讲明要求/r/n的预制深度/r/n进行制作/r/n。/r/n关于变形的钢构件,现场能矫正的要在现场矫正,热矫正时,其温度应操纵在75/r/n0/r/n~900/r/n0/r/n之间,同一部位的热矫次数不得超过2次,并应缓慢冷却,不得用冷水淬冷;不能在现场矫正的,应及时交给制造厂家进行处理。检验项目要紧包括下面几个方面:/r/n1/r/n)/r/n数量清点按到货清单结合部件/r/n“/r/n翻样图/r/n”/r/n进行逐件清点,检查标识是否正确;清点后将构件,摆放整齐,垫实以防止构件变形。/r/n2)/r/n资料检查检验出厂的质量证明书、合格证等,包含a)变更施工图文件;b)钢材、连接材料及涂装材料质量证明书和实验报告;c)梁柱制作质量检查验收记录;d)预拼装记录;e)深化设计图、平面安装图、构件及零配件发运清单等。/r/n3/r/n)/r/n几何尺寸检验检验构件的各部分长度、截面尺寸、直线度、平直度、螺栓孔的位置、数量、大小、焊接接头的坡口尺寸等。/r/n4/r/n)/r/n焊接质量检验检查焊缝的外观质量,包括咬边、表面夹渣、裂纹、焊缝余高、焊肉高度等;检查焊缝的无损检测的结果、探伤比例是否符合设计或标准规范要求。/r/n5/r/n)/r/n摩擦面的质量检验检查摩擦面处理是否符合设计或规范要求。/r/n6/r/n)/r/n防腐质量检验检查漆膜厚度,是否有返锈现象。/r/n3.3/r/n安装程序和要紧施工方法/r/n由于钢结构的标高在/r/n+3/r/n1.98米以上,且每根柱子的吨位较重,因此钢结构施工时采纳单件空中散装法,即进行每一施工段(或一层)钢架安装时,柱和梁及其他构件在设计位置组对并形成框架。/r/n1/r/n)/r/n标高/r/n+3/r/n1.98米至/r/n+/r/n72.83米的钢结构共分八层,每层的标高如下:/r/n+/r/n3/r/n6/r/n米、/r/n+/r/n38.83米、/r/n+/r/n46米、/r/n+/r/n49.8米、/r/n+/r/n56.4米、/r/n+/r/n60米、+65.1米、/r/n+/r/n72.83米;/r/n/r/neq\o\ac(/r/n○/r/n,6)/r/n轴线/r/n钢结构到+46米。/r/n2)/r/n立柱分/r/n为四段,+33.28m~47.3m、47.3m~57.7m、57.7m~66.4、66.4m~72.83m,安装钢结构应分段安装,每一段按层安装,每层按由内到外的顺序进行安装,将同一施工段的连接梁、钢格栅全部安装完后(需预留的除外),再进行上一施工段的施工;同时与设备吊装专业结合预先确定需要预留的钢构件。假如设备不能及时到货和就位,为保证整体钢结构的稳定性,在一个施工段或一层钢结构焊接前要进行预组装,用高强螺栓连接并终拧以保证结构整体稳定性,待设备安装之前再进行拆卸,设备安装后,重装预留梁时,要更换新的高强度螺栓。/r/n3/r/n)/r/n柱子安装前,先在柱子互成/r/n90/r/n0/r/n的/r/n方向上画出/r/n1/r/n米标高线、距上口0.5米标高线和柱子中心线,用白漆作上标记,将柱子中心线返到柱底板上,以备以后找正和观测所用。/r/n4/r/n)/r/n吊装柱子时,用四根临时缆风绳系挂在柱头之上,配上四个手动葫芦,用于调整柱子垂直度和固定柱子。/r/n5/r/n)/r/n先安装中间四根立柱,然后安装联系梁、垂撑,通过找正后,将高强螺栓终拧,形成核心稳定结构,然后向四周辐射。/r/n6/r/n)/r/n一个施工段安装完后,进行整体找正。找正合格后,对高强螺栓实施终拧。/r/n7/r/n)/r/n钢结构安装时期的施工测量:钢结构安装时期从建筑物测量验线到安装时期的测量放线方法如下:/r/na.建筑物测量放线:钢结构安装前,由土建提供轴线和标高的基准点、建筑物轴线(含基础轴线)和标高(含钢结构支撑面)、预埋螺栓的有关尺寸依次进行复测。/r/n(1)轴线复测:依照现场情况选用直角坐标法。/r/n(2)检验部位:定位依据桩及定位条件。/r/nb.高层钢结构安装时期的测量放线/r/n(1)建立基准操纵点:依照现场条件,测量操纵基准点设在建筑物内部,以4~5个为宜,且操纵点要选在从底层把基准点引向高层楼面时不受阻碍的部位。/r/n(2)平面轴线操纵点的竖向传递:投递仪器采纳激光铅直仪。在操纵点的正上方,传递操纵点的楼面留/r/nφ/r/n100的孔,并设置一块有机玻璃的光靶,光靶固定在操纵架或楼层板上。仪器从0/r/n0/r/n、90/r/n0/r/n、180/r/n0/r/n、270/r/n0/r/n四个方向,向光靶投点,标出这四个0.2mm规格的点,若四点重合则传递无误差;若四点不重和,则找出四点对角线的交点作为传递上来的操纵点。/r/n(3)柱顶放线:以传递上来的操纵点为基准,用经纬仪设置平面操纵网,把轴线放在柱顶上。/r/n(4)悬吊钢尺传递高程:利用高程操纵点,采纳水准仪和钢尺测量的方法引测。/r/n(5)钢柱校正与垂直度的测量:钢结构垂直度是整个钢结构施工过程中需要保证的主控项目,是钢结构整体稳定性的重要保证,并始终贯穿于钢结构施工过程中,具有多次、反复的特点。/r/nⅠ/r/n)首层柱:由于首层柱安装差不多完成,在此不再叙述/r/nⅡ/r/n)首层柱顶和其他节柱两端的标高操纵用相对标高操纵安装。/r/n钢柱吊装就位后,用高强度螺栓连接固定(摩擦面已处理);测量上节柱和下节柱的顶面标高,通过起重机起吊,用撬棍微调接头间隙;符合标准偏差调整至5mm以内后,打入钢楔并点焊限制钢柱下落。柱子安装后,在柱顶安置水平仪,测量各柱顶的相对标高,将结果与下节柱顶预检长度对比,进行综合处理。当对比结果超过5mm,要调整钢柱子,填塞一定厚度的低碳钢钢板,但须注意每次填塞的板不宜过厚,以免增加其余节点安装难度。/r/nⅢ/r/n)上节柱纵横十字线。尽量做到上、下柱十字线重合,幸免接口出现错口。如有偏差,应在连接的耳板中,填入厚度0.5~1.0mm的垫板,拧紧螺栓。十字线调整可分多次进行,每次操纵在3mm以内。/r/n注意:柱子的定位决不同意使用下节柱的定位轴线为基准,应从地面操纵轴线引到高空,以保证每节柱子安装精度,幸免产生过大的积存偏差。/r/nⅣ/r/n)上节柱的垂直度。/r/n利用定位轴线对上节柱进行垂直度/r/n重点对钢柱有关尺寸预检,如:安装误差:下节钢柱的柱顶垂直度偏差确实是上节钢柱的底部轴线、位移量、焊接变形、日照温度、垂直度等误差的综合,可采取预留与偏差方向相反的垂直度。/r/n柱与柱焊缝收缩经验值一般为3.5mm/r/n;/r/n梁与柱一般焊缝收缩值小于2mm。/r/nⅤ/r/n)框架整体垂直度校正:每一个施工段立柱及主梁安装完毕后,/r/n要进行整体校正。利用传递上来的操纵轴线,对所有框架柱及柱距进行复测,关于超差的柱子采取千斤顶、钢楔/r/n和手拉葫芦进行纠偏。如下图所示:/r/n待柱复测结果在操纵值之内时,终拧高强度螺栓。/r/n8/r/n)/r/n空中对接柱子时,应另行采取加固措施以防柱子发生焊接变形,之后才能进行焊接。焊接过程中,应全过程跟踪测量,随时观看柱子垂直度变化,以便及时调整。/r/n3.4/r/n高强度螺栓的安装方法/r/n3.4.1/r/n施工预备/r/n1/r/n)/r/n本工程采纳的高强度螺栓为扭剪型高强度螺栓/r/n10.9/r/nS/r/n级。施工前应检查高强度螺栓合格证及随箱所带的扭矩系数和紧固轴力(预拉力)的检验报告,并按每批抽检/r/n8/r/n套扭剪型高强度螺栓复验预拉力。其结果应符合下表规定:/r/n/r/n扭剪型高强度螺栓紧固预拉力和标准偏差/r/n(KN)/r/n表4/r/n螺栓直径(/r/nmm/r/n)/r/n16/r/n20/r/n(/r/n22/r/n)/r/n24/r/n紧固预拉力的/r/n平均值/r/nP/r/n/r/n99/r/n~/r/n120/r/n154/r/n~/r/n186/r/n191/r/n~/r/n231/r/n222/r/n~/r/n270/r/n标准偏差/r/nσ/r/np/r/n/r/n10/r/n./r/n1/r/n15/r/n./r/n7/r/n19/r/n./r/n5/r/n22/r/n./r/n7/r/n扭矩系数的平均值应为/r/n0.110/r/n~/r/n0.150/r/n,标准偏差小于或等于/r/n0.010/r/n。/r/n2)/r/n施工前应对摩擦面的抗滑移系数进行复验。其结果应符合规范要求。/r/n3/r/n)/r/n使用的扭矩扳手和电动扭矩扳手应通过检查、检测合格,每天班前使用的扳手应进行校正,误差不应超过/r/n±/r/n5%/r/n。/r/n4/r/n)/r/n安装高强螺栓的装配工人应经技术培训,培训合格后方可正式作业。/r/n5/r/n)/r/n高强螺栓连接前,必须对构件摩擦面进行加工处理,处理方法为:制造厂采纳喷砂,施工现场采纳电动砂轮机或钢丝刷打磨。/r/n6/r/n)/r/n连接板不能有挠曲变形,否则应矫正后才能使用,板间接触面应平坦,大于/r/n1mm/r/n的间隔时,加塞制造厂提供的砂喷处理的垫片。/r/n7/r/n)/r/n入库的高强度螺栓应由专人保管和发放。/r/n8/r/n)/r/n在运输、保管及使用过程中应轻装轻卸,防止损伤螺纹,发觉螺纹损伤严峻或雨淋过的螺栓不应使用。/r/n9/r/n)/r/n使用前尽可能不要开箱,以免破坏包装的密封性。开箱取出部分螺栓后,也应原封包装好,以免沾染灰尘和锈蚀。/r/n3.4.2/r/n扭剪型高强度螺栓的施工程序/r/n施工预备/r/n施工预备/r/n螺栓入库验收/r/n摩擦面滑移系数测定/r/n扭矩板/r/n螺栓入库验收/r/n摩擦面滑移系数测定/r/n扭矩板/r/n手校验/r/n高强螺栓复验/r/n高强螺栓复验/r/n节点用一般螺栓定位/r/n节点用一般螺栓定位/r/n安装高强螺栓/r/n安装高强螺栓/r/n紧固力检查/r/n初拧/r/n紧固力检查/r/n初拧/r/n最终检查/r/n终拧/r/n最终检查/r/n终拧/r/n3.4.3/r/n/r/n高强螺栓的安装/r/n1/r/n)/r/n高强度螺栓的安装应在结构构件中心位置调整后进行,其穿入方向应以施工方便为准,并力求一致。高强度螺栓连接副组装时,螺母带圆台面的一侧应朝向垫圈有倒角的一侧。/r/n安装高强螺栓时,用钢钎或冲钉对正上下或前后连接板的螺孔,并投入一定数量的临时螺栓或冲钉(不同意使用高强度螺栓作为临时螺栓),其数量应符合下列规定:/r/n不得少于安装总数的1/3;/r/n不得少于2个临时螺栓;/r/n冲钉穿入数量不宜多于临时螺栓的30%。/r/n拧紧临时螺栓,余下的螺孔穿入高强螺栓,再逐步更换临时安装螺栓或冲钉。如不能自由投入则不可强行敲打,而用饺刀修整螺栓孔,同一节点中扩孔数量不得大于螺栓孔总数的三分之一,扩孔后孔径不能大于原孔径2mm,严禁气割扩孔。组装构件连接板之间的间隔过大应加经喷砂处理后的垫板,垫板磨擦面应保证干燥,用钢丝刷对锈蚀表面进行处理。/r/n2/r/n)/r/n施工时采纳指针式、声响式或电动扭矩扳手。对能采纳电动扳手紧固的高强螺栓应采纳电动扳手紧固,并以最终拧掉高强螺栓端部梅花头为合格,未在终拧中拧掉梅花头的螺栓数不应大于该节点螺栓数的5%。对不能采纳电动扳手终拧的高强螺栓要采纳手动定扭矩扳手施拧,并用扭矩检验法检验。施拧顺序为初拧、终拧,大型节点分初拧、复拧和终拧。/r/n3/r/n)/r/n高强螺栓连接副终拧后,螺栓丝扣外露应为2~3扣,其中同意有10%的螺栓丝扣外露1扣或4扣。/r/n4/r/n)/r/n扭剪型高强度螺栓的初拧扭矩值按下式计算:/r/nT/r/n0/r/n=0.065/r/n×/r/nP/r/nC/r/n×/r/nd/r/n现将/r/n常用的高强度螺栓的扭矩值要求列表如下:/r/n扭剪型高强度螺栓的初拧扭矩和终拧扭矩表5/r/n序号/r/n螺栓规格/r/nd/r/n初拧扭矩(/r/nNm/r/n)/r/n复拧扭矩(/r/nNm/r/n)/r/n终拧扭矩(/r/nNm/r/n)/r/n施工预拉力/r/nP/r/nC/r/n(/r/nkN/r/n)/r/n1/r/nM16/r/n115/r/n115/r/n230/r/n110/r/n2/r/nM20/r/n221/r/n221/r/n442/r/n170/r/n3/r/nM22/r/n300/r/n300/r/n600/r/n210/r/n4/r/nM24/r/n390/r/n390/r/n780/r/n250/r/n5/r/n)/r/n高强度螺栓的长度为钢板总厚度加上增加长度,增加长度可参照下表选用:表6/r/n高强度螺栓/r/nM16/r/nM20/r/nM22/r/nM24/r/n增加长度(/r/nmm/r/n)/r/n25/r/n30/r/n35/r/n40/r/n6/r/n)/r/n高强度螺栓的紧固顺序:要使螺栓群中所有螺栓都均匀受力,应从螺栓群中间向两边或四周进行紧固。高强度螺栓应配套使用。当天安装的高强螺栓初拧、复拧和终拧应在同一天内完成。紧固顺序具体做法如下:/r/n(1)一般接头,应从螺栓群中间顺序向外进行紧固如图a。/r/n(a)/r/n(a)/r/n(2)梁柱拼接接头,应由中间向四周、先柱端后梁端的顺序施拧。/r/n7/r/n)/r/n初拧后螺栓头部涂上黄色,复拧后螺栓涂上绿色,终拧后螺栓头部涂上红色油漆。/r/n8/r/n)/r/n高强螺栓终拧检查后,连接处板缝应及时用过氯乙烯腻子封闭,并在螺栓上涂上氯磺化聚乙烯防锈漆。/r/n9/r/n)/r/n扭剪型高强度螺栓施工时,应对以下数据进行记录,高强螺栓的复验数据,抗滑移系数试验数据,终拧扭矩、扭矩扳手检查记录及施工质量检查记录,并按《钢结构工程施工质量验收规范》(/r/nGB50205/r/n-/r/n2001/r/n)及《钢结构高强度螺栓连接的设计、施工及验收规程》(/r/nJGJ82/r/n-/r/n91/r/n)的标准要求及时填写施工记录/r/n/r/n3.5/r/n钢构件的焊接/r/n3.5.1/r/n焊接前预备/r/n1/r/n)/r/n钢构件焊接所使用的焊条、焊丝等焊接材料与母材的匹配应符合设计要求及国家现行行业标准/r/n《建筑钢结构焊接技术规程》JGJ81-2002的规定。/r/n2/r/n)/r/n钢结构的焊接必须要有与施焊项目相符的焊接工艺评定,焊工必须要有与施焊项目相符的焊工合格证。持证焊工必须在其考试合格项目及其认可范围内施焊。/r/n3/r/n)/r/n施焊前焊接技术人员应对参加钢结构施工作业的有关人员进行技术交底和安全技术交底。作业人员要按照焊接工艺卡的要求进行作业。/r/n4/r/n)/r/n焊前检查焊件的坡口型式和间隙是否符合焊接工艺卡的要求,合格后才能焊接。/r/n3.5.2/r/n焊接工艺参数/r/n焊接工艺参数参见《钢结构焊接施工方案》及焊接工艺卡。/r/n3.5.3/r/n焊接工艺要求/r/n1/r/n)/r/n钢结构的现场焊接,采纳手工电弧焊和/r/nCO/r/n2/r/n气体爱护焊,/r/n/r/nCO/r/n2/r/n气体爱护焊要紧用于主梁与立柱的刚性节点以及持续焊接时刻较长的重要部位。/r/n2/r/n)/r/n焊缝等级:/r/n梁与柱、支撑与柱、箱型柱水平加劲肋与柱、箱型柱的翼缘和腹板以及梁与梁翼缘的连接剖口焊、拼接焊缝处为一级;粱柱加劲肋等节点的各种剖口焊缝、主次梁的角焊缝连接为二级,焊接梁的翼缘和腹板焊缝的质量等级为二级;钢楼梯、栏杆等其余次要构件的连接质量等级为三级。/r/n3/r/n)/r/n焊接时,对材质/r/nQ235/r/n钢材手工电弧焊焊接使用/r/nJ422/r/n或/r/nJ427/r/n焊条;CO/r/n2/r/n气体爱护焊,焊丝选用ER50-6型H08Mn2SiA;/r/nQ345/r/n钢的焊接使用J507焊条;焊条使用前,/r/nJ427/r/n或J507/r/n焊条在/r/n300~400/r/n℃/r/n的温度下烘烤/r/n1/r/n小时,/r/nJ422/r/n焊条在/r/n120/r/n℃/r/n温度下烘烤/r/n1/r/n小时;焊条经烘烤后放入/r/n100/r/n℃/r/n保温箱中保温存放,随用随取,/r/n4/r/n小时用完。/r/n4/r/n)/r/n安装焊接一般顺序:依照结构平面图形的特点,以对称轴为界或以同体形结构处为分界区,配合吊装顺序进行安装焊接。焊接顺序应遵循以下原则和程序:/r/n(1)在吊装、校正和栓焊混合节点的高强螺栓终拧完成若干节间以后开始焊接,以利于形成稳定框架。/r/n(2)焊接时,应依照结构体形特点,选择若干基准柱或基准节间,开始焊接主梁与柱之间的焊缝,然后向四周扩展施焊,以幸免收缩变形向一个方向累积。/r/n(3)一节柱中每层柱-梁节点拼接完成,依照先上后下的顺序焊接拼接接头,保证框架稳固。/r/n(4)栓焊混合节点中,应先栓后焊(如腹板的连接),幸免焊接收缩引起孔间位移。/r/n(5)柱-梁节点两侧对称的两根梁,应同时与柱相焊,减少焊接约束度,幸免焊接裂纹产生,又可防止柱的偏斜。/r/n(6)柱-柱节点的焊接自然是由下层往上层顺序焊接。由于多节柱子对接,可能使标高误差累积,在安装焊接两节柱后,应视实际偏差情况,在组对拼接时采取措施调整,以保证高度方向的安装精度。/r/n4)要紧节点焊接顺序/r/n(1)柱-柱拼接节点,要紧考虑幸免柱截面对称侧焊缝的收缩不均衡而使柱发生偏斜,操纵结构的外形尺寸;但同时尽量减少焊接约束度,防止产生焊接裂纹。/r/n柱子对接口焊接顺序如图所示:/r/n+/r/n+/r/n+/r/nA/r/nB/r/nC/r/nD/r/nA/r/nB/r/nD/r/nA/r/nB/r/nD/r/nC/r/nC/r/n柱-柱/r/n连接板/r/nA/r/nC/r/nB/r/nD/r/nA/r/nC/r/nB/r/nD/r/nA/r/nB/r/nC/r/nD/r/nA/r/nB/r/nC/r/nD/r/n /r/n、/r/n /r/n焊至1/3板厚/r/n /r/n、、、/r/n或+/r/n /r/n、+/r/n(2)梁-柱和梁-梁节点:梁-柱拼接节点采纳栓焊混合连接形式,安装时先栓后焊。翼缘板焊接时,先焊下翼缘,再焊上翼缘;翼缘板大于30mm厚时,宜上、下翼缘轮换施焊。/r/n3/r/n)/r/n焊接连接接触面和沿焊缝边缘每边/r/n30~50mm/r/n内的铁锈、毛刺、污垢、冰雪等应清除洁净。/r/n4/r/n)/r/n焊条应按有关规定保存、烘烤、发放、使用,不得使用药皮脱落及焊芯生锈的焊条。/r/n5/r/n)/r/n焊缝两端应设置引弧板和引出板,其材质和坡口形式与焊件相同,焊接完毕应气割切除引弧板和引出板,并修磨平坦,不得用锤击落。/r/n6/r/n)/r/n焊接时,焊工应遵守焊接工艺,不得自由施焊或在焊道外的母材上引弧。/r/n7/r/n)/r/n多层焊接宜连续施焊,每一层焊道焊完应及时清理检查,清除缺陷后再焊。/r/n8/r/n)/r/n一级焊缝不得存在未焊满、根部收缩、咬边和接头不良等缺陷;一、/r/n二级焊缝不得存在表面气孔、夹渣、裂纹、电弧擦伤等缺陷;二级焊缝咬边深度/r/n≤/r/n0./r/n0/r/n5t/r/n且/r/n≤/r/n0.5mm/r/n、连续长度/r/n≤/r/n100mm/r/n,/r/n且焊缝两侧咬边总长/r/n≤/r/n10%/r/n焊缝全长,余高以/r/n0~4mm/r/n为宜,焊缝宽度应均匀一致。三级焊缝的外观质量应符合《建筑钢结构焊接技术规程》(/r/nJGJ81/r/n-/r/n2002/r/n)表/r/n7.2.3/r/n的规定。/r/n焊缝外观质量同意偏差/r/n焊缝/r/n焊缝/r/n质量/r/n等级/r/n检验/r/n项目/r/n检验/r/n项目/r/n二级/r/n三级/r/n未焊满/r/n≤/r/n0.2+0.02t且/r/n≤/r/n1mm,每100mm长度焊缝内未焊满累积长度/r/n≤/r/n25mm/r/n≤/r/n0.2+0.04t且/r/n≤/r/n2mm,每100mm长度焊缝内未焊满累积长度/r/n≤/r/n25mm/r/n根部收缩/r/n≤/r/n0.2+0.02t且/r/n≤/r/n1mm,长度不限/r/n≤/r/n0.2+0.04t且/r/n≤/r/n2mm,长度不限/r/n咬边/r/n≤/r/n0.05t且/r/n≤/r/n0.5mm,连续长度/r/n≤/r/n100mm,且焊缝两侧咬边总长/r/n≤/r/n10%焊缝全长/r/n≤/r/n0.1t且/r/n≤/r/n1mm,长度不限/r/n裂纹/r/n不同意/r/n同意存在长度/r/n≤/r/n5mm的弧坑裂纹/r/n电弧擦伤/r/n不同意/r/n同意存在个不电弧擦伤/r/n接头不良/r/n缺口深度/r/n≤/r/n0.05t且/r/n≤/r/n0.5mm,每1000mm长度焊缝内不得超过一处/r/n缺口深度/r/n≤/r/n0.1t且/r/n≤/r/n1mm,每1000mm长度焊缝内不得超过一处/r/n表面气孔/r/n不同意/r/n每50mm长度焊缝内同意存在直径<0.4t且/r/n≤/r/n3mm的气孔2个;孔距应/r/n≥/r/n6倍孔径/r/n表面夹渣/r/n不同意/r/n深/r/n≤/r/n0.2t,长/r/n≤/r/n0.5t且/r/n≤/r/n20mm/r/n9/r/n)/r/n焊接完毕,焊工应清除熔渣及飞溅,检查外观质量,合格后在距焊缝/r/n50mm/r/n处打上焊工钢印。/r/n10/r/n)/r/n一级全熔透焊缝进行100%超声波探伤,其合格等级分不为/r/nGB11345B/r/n级检验、/r/nⅡ/r/n级合格;二级全熔透的焊缝进行/r/n20%/r/n的/r/n超声波/r/n探伤,其合格级不为/r/nGB11345B/r/n级检验/r/nⅢ/r/n级合格。/r/n11/r/n)/r/n焊缝的质量检验要求:焊缝应/r/n100%/r/n进行外观检查,对所有主框架的柱梁拼接节点/r/n,梁与柱连接的/r/nV/r/n型坡口焊缝,支承大型设备的八字梁的连接焊缝按设计要求进行无损检验。/r/n3.6/r/n钢结构的安装/r/n3.6.1/r/n钢结构立/r/n柱及主梁平面图/r/n北/r/n北/r/nf/r/n4000/r/n/r/neq\o\ac(/r/n○/r/n,C)/r/n/r/neq\o\ac(/r/n○/r/n,D)/r/n/r/neq\o\ac(/r/n○/r/n,B)/r/n/r/neq\o\ac(/r/n○/r/n,3)/r/n/r/neq\o\ac(/r/n○/r/n,4)/r/n/r/neq\o\ac(/r/n○/r/n,5)/r/n/r/neq\o\ac(/r/n○/r/n,6)/r/n1000/r/n0/r/n1000/r/n0/r/n楼梯间/r/n10000/r/n10000/r/n10000/r/n电梯井/r/n/r/neq\o\ac(/r/n○/r/n,A)/r/n7/r/n/r/n注:箱型柱截面700*700箱型柱截面500*500;/r/n3.6.2/r/n吊装机械的选择/r/n依照吊车的性能及场地条件选择/r/n150/r/n吨履带吊车(带13米长的副杆)/r/n1/r/n台、/r/n50/r/n吨履带吊车/r/n1/r/n台、/r/n180/r/n吨米塔吊/r/n1/r/n台;此外为配合施工,我们启用一台升降机(型号为/r/nSCD200/200/r/n)用以载人。/r/n钢结构立柱重量最大在11吨左右,梁最大重量在3吨左右;/r/n通过作图分析(见钢结构吊装示意图)和查阅/r/n150T/r/n吊车工作性能表,/r/n150T/r/n吊车在工作半径18米,杆长63米时,起吊重量为27.2吨,可满足+47.3米以下的钢结构/r/n/r/neq\o\ac(/r/n○/r/n,B)/r/n轴线、/r/n/r/neq\o\ac(/r/n○/r/n,A)/r/n轴线立柱及连接梁的吊装;/r/n150T/r/n吊车在工作半径26米,杆长75米时,起吊重量为/r/n1/r/n6/r/n./r/n4吨,用于吊装/r/n/r/neq\o\ac(/r/n○/r/n,C)/r/n轴线和/r/n/r/neq\o\ac(/r/n○/r/n,D)/r/n轴线+47.3m以下柱子和连接梁;+47.3m以上钢结构吊装选择150吨、75m主杆、13m副杆,起吊重量为13吨。/r/n吊装钢结构柱子时/r/n,150/r/n吨覆带吊的性能手册确定如下工作参数:/r/n吊车名称/r/n杆长/r/n(/r/n米/r/n)/r/n工作半径/r/n(/r/n米/r/n)/r/n额定负载/r/n(/r/n吨/r/n)/r/n实际负载/r/n(/r/n吨/r/n)/r/n吊装/r/n高度(/r/n米)/r/n150/r/n吨吊车/r/n63/r/n18/r/n27.2/r/n25左右/r/n57/r/n150/r/n吨吊车/r/n75/r/n26/r/n16.4/r/n15/r/n67/r/n150吨吊车/r/n7/r/n5(主杆)/r/n13(副杆)/r/n26/r/n13/r/n(夹角15/r/n0/r/n)/r/n1/r/n1.5左右/r/n75/r/n150吨吊车/r/n7/r/n5(主杆)/r/n13(副杆)/r/n26/r/n9/r/n(夹角30/r/n0/r/n)/r/n8左右/r/n75/r/n/r/n/r/n3.6.3/r/n安装顺序、构件吊装、架子搭设及采取的措施/r/n1/r/n)/r/n钢结构的安装按由内到外的顺序进行,同一层施工段的柱、梁、支撑、平台、栏杆、楼梯间安装完后再进行下一个施工段的安装工作。柱子安装前,应摆放在事先搭好的道木堆上,以备检查和验收,并沿柱身搭设架子,主梁在梁中间位置搭设架子;柱子吊装后,固定好,利用塔吊安装主梁和次梁。在每个施工段施工时,在每个楼层的钢柱之间、楼层面以上/r/n1.2/r/n米处栓上/r/nΦ/r/n12/r/n钢丝绳,作为不具备人员行走条件时栓挂安全带的临时防护措施。/r/n2/r/n)/r/n由于吊车能够在煤气化装置区的北、/r/n西/r/n、南三面移动,吊车吊装时可在这三面查找最佳位置。/r/n选用/r/n150/r/n吨履带吊吊装立柱或主梁,用/r/n180/r/n吨米塔吊吊装次梁、垂撑;斜拉筋、梯子、楼层板等较小的构件,先用塔吊或/r/n150/r/n履带吊吊到平台上,然后再用倒链就位安装。/r/n3/r/n)/r/n每层钢结构柱梁的安装顺序大致按下面图表所示的顺序进行:柱子按a、b、c/r/n……/r/nl;梁按1、2、3/r/n……/r/n17。具体到每层钢结构的安装,需预留的连接梁及构件下面有详细讲明,此外依照现场需要和安装的方便,此安装顺序可进行适当调整。/r/n10000/r/n北/r/n /r/n10000/r/n北/r/n塔吊/r/n10000/r/n10000/r/n塔吊/r/n10000/r/n10000/r/n/r/neq\o\ac(/r/n○/r/n,D)/r/n10/r/n7/r/n4/r/nh/r/nf/r/nd/r/nc/r/n/r/neq\o\ac(/r/n○/r/n,D)/r/n10/r/n7/r/n4/r/nh/r/nf/r/nd/r/nc/r/n6/r/n1000/r/n0/r/n6/r/n1000/r/n0/r/n9/r/n3/r/n2/r/ng/r/n /r/n9/r/n3/r/n2/r/ng/r/n/r/neq\o\ac(/r/n○/r/n,C)/r/ne/r/n8/r/n5/r/n1/r/nb/r/na/r/n/r/neq\o\ac(/r/n○/r/n,C)/r/ne/r/n8/r/n5/r/n1/r/nb/r/na/r/n1000/r/n1000/r/n0/r/n16/r/n11/r/n14/r/n12/r/n16/r/n11/r/n14/r/n12/r/nl/r/ni/r/n/r/neq\o\ac(/r/n○/r/n,B)/r/n17/r/n13/r/n15/r/nk/r/nj/r/n4000/r/nl/r/ni/r/n/r/neq\o\ac(/r/n○/r/n,B)/r/n17/r/n13/r/n15/r/nk/r/nj/r/n4000/r/n升降机/r/n楼梯间/r/n/r/neq\o\ac(/r/n○/r/n,A)/r/n电梯井/r/nf/r/n升降机/r/n楼梯间/r/n/r/neq\o\ac(/r/n○/r/n,A)/r/n电梯井/r/nf/r/n/r/neq\o\ac(/r/n○/r/n,6)/r/n/r/neq\o\ac(/r/n○/r/n,3)/r/n/r/neq\o\ac(/r/n/r/neq\o\ac(/r/n○/r/n,6)/r/n/r/neq\o\ac(/r/n○/r/n,3)/r/n/r/neq\o\ac(/r/n○/r/n,4)/r/n /r/n/r/n/r/neq\o\ac(/r/n○/r/n,5)/r/n注:/r/n /r/n箱型柱截面700*700;/r/n /r/n箱型柱截面500*500;a~n为立柱安装顺序,数字1~20为梁的安装顺序。/r/n大型设备吊装需要钢结构框架预留梁一览表/r/n序号/r/n设备位号/r/n设备名称/r/n布置位置/r/n钢结构预留情况/r/n1/r/nV-/r/n120/r/n5/r/n纷煤给料罐/r/n+/r/n14m/r/nB/r/n—/r/nC;/r/n4/r/n—/r/n5/r/n+/r/n31.98/r/nm/r/n以上B4~B5梁、A轴线柱子/r/n2/r/nV-/r/n120/r/n4/r/n煤粉料斗/r/n+/r/n34.8/r/nm/r/n/r/nB/r/n—/r/nC;/r/n4/r/n—/r/n5/r/n+/r/n31.98/r/nm/r/n以上B4~B5梁、A轴线柱子/r/n3/r/nV/r/n1/r/n2/r/n01/r/n粉煤贮罐/r/n+/r/n53.7/r/nB/r/n—/r/nC/r/n、4/r/n—/r/n5/r/n+/r/n31.98/r/nm/r/n以上B4~B5梁、A轴线柱子/r/n4/r/nS/r/n120/r/n1/r/n煤粉锁斗/r/n+/r/n72.35m/r/nB/r/n—/r/nC/r/n;4/r/n—/r/n5/r/n+/r/n31.98/r/nm/r/n以上B4~B5梁、A轴线柱子/r/n5/r/nF1301/r/n气化炉/r/n+/r/n27m/r/nB/r/n—/r/nC/r/n;/r/n5/r/n—/r/n6/r/n/r/n4/r/n)/r/n构件吊装柱子吊装时,有耳板的柱子利用耳板进行吊装,也可采纳/r/n捆绑悬臂梁的方法进行吊装,也可在柱头上焊接吊耳进行吊装,见以下柱子吊装示意图:/r/n注:a为有吊耳的柱子,b为焊接吊耳的柱子,c为捆绑吊装。/r/n注:a为有吊耳的柱子,b为焊接吊耳的柱子,c为捆绑吊装。/r/nabc/r/n主梁吊装时,应事先在梁两头焊接吊耳,利用吊耳进行吊装;次梁、小次梁进行吊装时,要捆绑两点,以幸免直接捆绑构件中心点,在吊装时碰到障碍物构件坠落。/r/n架子搭设/r/n柱子吊装前沿柱身搭设架子,见以下示意图:/r/n主/r/n梁/r/n架子搭设见以下示意图:/r/n立柱摆放示意图/r/n:/r/n3.6.4/r/n安装的同意偏差/r/n柱、梁及整体安装的同意偏差/r/n项/r/n/r/n目/r/n同意偏差(/r/nmm/r/n)/r/n测量方法/r/n底层柱柱底轴线对定位轴线偏移/r/n3.0/r/n钢尺、经纬仪、/r/n吊线、拉线、/r/n钢尺/r/n柱子定位轴线/r/n1.0/r/n单节柱的垂直度/r/nh/r/n//r/n1000/r/n且/r/n≤/r/n10/r/n主体结构的整体垂直度/r/nH/r/n//r/n2500/r/n+/r/n10.0/r/n且/r/n≤/r/n50.0/r/n主体结构的整体平面弯曲/r/nL/r/n//r/n1500/r/n且/r/n≤/r/n25.0/r/n梁跨中的垂直度/r/nh/r/n//r/n250/r/n且/r/n≤/r/n15.0/r/n梁侧向弯曲矢高/r/nL/r/n//r/n1000/r/n且/r/n≤/r/n10/r/n多层及高层钢结构中构件安装的同意偏差/r/n项/r/n/r/n目/r/n同意偏差(/r/nmm/r/n)/r/n测量方法/r/n上、下柱连接处的错口/r/nΔ/r/n3.0/r/n钢尺/r/n同一层柱的各柱顶高度差/r/nΔ/r/n5.0/r/n水准仪/r/n同一根梁两端面的高度差/r/nΔ/r/nL/r/n//r/n1000/r/n且/r/n≤/r/n10/r/n水准仪/r/n主梁与次梁表面的高差/r/nΔ/r/n±2.0/r/n直尺、钢尺/r/n压型金属板在钢梁上相邻的错位/r/n15.0/r/n直尺、钢尺/r/n多层及高层钢结构主体结构总高度的同意偏差/r/n项/r/n/r/n目/r/n同意偏差(/r/nmm/r/n)/r/n测量方法/r/n用设计标高操纵安装/r/nH/r/n//r/n1000/r/n且/r/n≤/r/n30.0/r/n钢尺、水准仪/r/n钢平台、钢梯和防护栏杆安装的同意偏差/r/n项/r/n/r/n目/r/n同意偏差(/r/nmm/r/n)/r/n测量方法/r/n平台高度/r/n±/r/n15.0/r/n水准仪/r/n平台梁水平度/r/nL/r/n//r/n1000/r/n且/r/n≤/r/n20.0/r/n水准仪/r/n平台支柱垂直度/r/nH/r/n//r/n1000/r/n且/r/n≤/r/n15.0/r/n经纬仪或吊线和钢尺/r/n承重平台梁侧向弯曲/r/nL/r/n//r/n1000/r/n且/r/n≤/r/n10.0/r/n拉线、钢尺/r/n承重平台梁垂直度/r/nH/r/n//r/n250/r/n且/r/n≤/r/n15.0/r/n吊线、钢尺/r/n直梯垂直度/r/nL/r/n//r/n1000/r/n且/r/n≤/r/n15.0/r/n吊线、钢尺/r/n栏杆高度/r/n±15.0/r/n钢尺/r/n栏杆立柱间距/r/n±15.0/r/n钢尺/r/n3.7钢结构涂装/r/n钢结构防腐应严格按《工业建筑防腐蚀设计规范》(GB50046-95)的规定执行;所有钢结构构件的外表面均须进行防腐处理,底漆拟采纳环氧富锌底漆、中间漆依照防火涂料的特性要求确定、面漆用于外露构件;钢结构在涂装前必须对钢材表面进行除锈。钢材基层除锈等级不低于Sa21/2;钢结构除锈等级的检验应符合国家标准《涂装前钢材表面锈蚀等级和除锈等级》(GB8923)的要求。处理后的钢材表面不应有焊渣、焊疤、灰尘、油污、水和毛刺等;钢结构防火应严格按现行国家规范《石油化工企业设计防火规范》(GB50160-92,1999年版)的规定执行。须采纳厚型无机并能适用于烃类火灾的防火涂料(室外型);钢结构防火覆盖部位:标高/r/n±/r/n0.000~46.000层所有的钢柱、支撑设备的钢梁及框架梁(梁除顶面外的所有外表面)。耐火极限:不应低于1.5小时;防火涂料的施工和验收应按照行业标准《钢结构防火涂料应用技术规程》(CECS24:90)及《钢结构防火涂料通用技术条件》(GB14907-94)的规定执行。/r/n3.8压型板安装/r/n楼梯及电梯间屋面檩条及墙梁所采纳的冷弯型钢应符合GB50018-2002要求。冷弯型钢应通过热浸镀锌处理,其镀锌量为250~275g/m/r/n2/r/n。屋面及墙面板所采纳的金属压型钢板应符合GB50018-2002要求。面层颜色等要求详见本工程建筑图纸。/r/n压型板板墙、屋面待钢结构施工完毕后再安装,安装时墙内外搭设双排钢管脚手架,按制造厂绘制的排版图依次安装墙板、屋面板,用自攻自钻螺钉固定在墙梁和檩条上。/r/n4/r/n施工进度网络打算安排/r/n/r/n依照目前现场实际情况,+31.98米以下混凝土框架可能10月1日能够拆架子,10月10前钢结构施工场地能够平坦好,具备钢构件进场条件;在此之前如有钢构件进场,现场已规划好临时摆放场地。/r/n9月30日/r/n材料开始进厂,/r/n10月15日/r/n前施工现场预备并具备安装条件,/r/n10月15日/r/n~/r/n10月20日/r/n材料同意及验检,/r/n10月25日/r/n钢结构开始安装。钢结构施工进度网络打算见附图。/r/n5/r/n劳动力打算安排/r/n劳动力打算安排从钢结构构件到货开始至安装工作结束。直接作业劳动力打算见下表。/r/n直接作业劳动力打算表/r/n工种/r/n10/r/n月/r/n11/r/n月/r/n12/r/n月/r/n1/r/n月/r/n2/r/n月/r/n铆工/r/n24/r/n24/r/n24/r/n24/r/n24/r/n电焊工/r/n20/r/n30/r/n30/r/n30/r/n30/r/n起重工/r/n20/r/n20/r/n2/r/n5/r/n2/r/n5/r/n12/r/n气焊工/r/n6/r/n6/r/n6/r/n6/r/n4/r/n电工/r/n2/r/n2/r/n2/r/n2/r/n2/r/n钳工/r/n4/r/n0/r/n0/r/n0/r/n0/r/n测量工/r/n2/r/n2/r/n2/r/n2/r/n2/r/n无损检测工/r/n2/r/n2/r/n2/r/n2/r/n2/r/n力工/r/n16/r/n16/r/n16/r/n16/r/n1/r/n0/r/n合计/r/n9/r/n6/r/n96/r/n96/r/n96/r/n76/r/n注:主体结构10~12月,1~2月为围护结构完善及预留部分安装。/r/n6/r/n质量保证措施/r/n和安装质量检验打算/r/n为了保证钢结构的安装质量,施工过程中采取以下质量保证措施:/r/n1/r/n)/r/n安装前对施工中使用的测量仪器进行校核,确保计量器具的准确性,特不是施工用扭矩扳手,班前要进行校验。/r/n本工程应采纳激光经纬仪,其精度应在1/2/r/n×/r/n10/r/n5/r/n之内;水准仪按国家三、四等水准测量和工程水准测量用途的要求,其精度为/r/n±/r/n3mm/km;钢卷尺应土建施工1把,钢结构制作2把,监理单位1把,五把钢尺应通过标准计量校准,为确保测量结果的正确性,应注意温度、尺长精度和倾斜改正。/r/n标准读数=实际读数+温度校正值+钢尺修正值+倾斜校正值/r/n2/r/n)/r/n安装前对钢结构构件进行检验和验收。/r/n3/r/n)/r/n安装前对基础进行工序交接,并复验基础的质量。/r/n4/r/n)/r/n对施工中使用的紧固件和焊材按要求进行复验。高强螺栓的紧固严格按要求施工。/r/n5/r/n)/r/n施工时应及时对柱子和梁进行测量,幸免出现永久性的超差点。/r/n6/r/n)/r/n吊装对象时,对刚度较小的构件采取加固措施,防止吊装过程变形。/r/n7/r/n)/r/n焊接时要进行焊接工艺评定,焊工持有效证件。/r/n8/r/n)/r/n钢结构安装的全过程实行/r/nA/r/n、/r/nB/r/n、/r/nC/r/n三级质量操纵检查。严格操纵每道工序的质量。/r/n煤气化装置建筑工程钢结构安装三级质量操纵点划分/r/n序号/r/n工序名称/r/n操纵点等级/r/n备注/r/n钢结构安装工程/r/n1/r/n方案审批/r/nAR/r/n2/r/n基础复查/r/nCR/r/n3/r/n材料检查/r/nAR/r/n4/r/n钢柱、连接梁安装/r/n安装/r/nCR/r/n5/r/n基础灌浆、隐蔽前检查/r/nAR/r/n6/r/n平台、栏杆、扶梯检查/r/nC/r/n7/r/n检验批验收/r/nAR/r/n高强度螺栓连接工程/r/n1/r/n成品进场检查/r/nAR/r/n2/r/n扭矩系数或预拉力复验/r/nBR/r/n3/r/n终拧扭矩检查/r/nCR/r/n4/r/n连接外观质量检查/r/nC/r/n5/r/n磨擦面外观检查/r/nC/r/n6/r/n检验批验收/r/nAR/r/n钢结构焊接工程/r/n1/r/n焊接工艺评定/r/nAR/r/n2/r/n焊接材料进场检查/r/nB/r/n3/r/n焊工证书检查/r/nAR/r/n4/r/n组合焊缝尺寸检查/r/nC/r/n5/r/n焊缝外观检查/r/nB/r/n6/r/n焊缝感观检查/r/nC/r/n7/r/n检验批验收/r/nAR/r/n注:A级为建设单位、工程监理单位、施工单位三方共检项目:/r/nB级为工程监理单位、施工单位双方共检项目:/r/nC级为施工单位自检项目:/r/nR为检查项目有记录。/r/n7质量保证体系及质量检查程序/r/n7.1质量保证体系/r/n质量保证工程师彭白/r/n钢结构责任工程师刘明/r/n质量保证工程师彭白/r/n钢结构责任工程师刘明/r/n钢结构技术员刘明/r/n施工班组/r/n十二队队长袁俊生/r/n十二队队长袁俊生/r/n7.2质量检查程序/r/n工序完成/r/n施工队/r/n返工/r/n工序完成/r/n施工队/r/n返工/r/n班组自检合格填写自检记录、质量记录/r/n甲方监理/r/n质检科专检/r/n班组自检合格填写自检记录、质量记录/r/n甲方监理/r/n质检科专检/r/n确认、通知共检/r/n现场共检/r/n现场共检/r/n质量记录交工号工程师存档备查、交工/r/n质量记录交工号工程师存档备查、交工/r/n转序施工/r/n签字确认/r/n转序施工/r/n签字确认/r/n8/r/n安全技术措施/r/n /r/n高层钢结构框架施工,安全问题比较突出,应采取有效的措施保证施工安全。/r/n1/r/n)/r/n在钢构件吊装时,应捆绑牢靠,使用的绳索、卡具应完好,如有损坏严禁使用;本工程施工位置较高,况且又在酷暑盛夏,为防止意外发生,所有参加施工人员必须进行体检,体检合格后,方可参加施工;为防止工作人员物料、工具坠落,造成安全事故,需铺设安全网。工作人员应戴好安全帽,高空作业时系上安全带。由于钢结构工程施工时活动范围较大,最好应采纳带有速差自控器(也称速差器,防坠器或防坠缓冲器)的安全带。/r/n2/r/n)/r/n当结构未形成独立的框架前,固定立柱的临时缆风绳不能拆除。/r/n3/r/n)/r/n在结构的尚不具备平台、楼面铺设条件前,必须在每两个钢柱之间的/r/n1.2/r/n米处栓挂系挂安全带的钢丝绳,需要在钢梁上铺设走道板,同时周边必须设外逃式安全网。同时在安排施工程序时,应优先安装能够形成独立框架的梁、支撑、平台板,尽早形成安全通道。/r/n4/r/n)/r/n在结构的临边、大于/r/n200/r/n毫米的洞口应设置安全栏杆。安装后的平台板必须固定牢固。/r/n5/r/n)/r/n在柱梁安装后为便于柱梁高强度螺栓的施工,必须在钢梁上设置适当数量的平台板和临时走道板。/r/n6/r/n)/r/n为便于高空接柱施工,在接柱接点处设置操作平台,平台要固定牢固。/r/n7/r/n)/r/n为保障施工人员上下通行的安全,吊装柱前要先将钢爬梯固定在钢柱上,高度不同的钢爬梯应错开布置,每段爬梯应设置休息平台。每根柱子安装时都必须配备防坠器,安装人员上下时必须将安全带挂在防坠器的挂钩上,幸免发生坠落事故。为便于紧固高强螺栓和焊接,需在柱梁节点下方安装吊挂蓝脚手。/r/n8/r/n)/r/n为施工需要搭设的脚手架、平台必须经安全人员验收合格后,并挂合格标识牌后方可使用。/r/n9/r/n)/r/n施工用的电动机械需接地良好,实行/r/n“/r/n一机一闸一保/r/n”/r/n,严防漏电。施工用电器设备和机械的电缆集中设在一起,以便于现场施工治理。/r/n10/r/n)/r/n高空作业,当风速大于/r/n10m/s/r/n时,应停止高空作业,当风速大于/r/n15m/s/r/n时,所有作业均须停止。/r/n11/r/n)/r/n防坠落措施/r/n/r/n安装使用的工具,如扭矩扳手、撬棍、角磨机等应采取安全爱护绳防止坠落。随手用的螺栓垫片等应放入工具袋,施工作业中所有可能坠落的对象,/r/n/r/n应一律进行撤去或加以固定。/r/n/r/n在高空用气割或电焊切割时,应采取措施防止割下的金属、熔珠或火花落下伤人。/r/n12/r/n)/r/n现场防雷击措施/r/n/r/n在建筑最高点处设避雷针通过引线接地极,接地电阻不得大于/r/n4/r/n欧姆。/r/n13/r/n)/r/
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年中国猕猴桃天然保鲜剂市场调查研究报告
- 2025年中国测试仪器市场调查研究报告
- 2025年中国汽车内球笼套市场调查研究报告
- 2025年中国多士炉市场调查研究报告
- 种植牙护理的最佳方法
- 护理服务中的隐私保护
- 案例分享:骨质疏松症患者的护理与预防
- 眼科护理服务模式创新
- 左心衰患者的营养支持护理
- 空调安装售后合同模板(2篇)
- 小学科学部分实验仪器的使用方法
- 2025年大学《数字出版-数字出版概论》考试参考题库及答案解析
- 数学试卷答案【广西卷】【高二下期末考】广西壮族自治区考阅评南宁部分学校2025年春季学期高二年级期末教学质量监测(6.30-7.1)
- (独家!)2025年3月29日湖南省事业单位联考A类《职测》真题及答案
- 植物园研学方案
- 临床研究人源间充质干细胞准则-第2部分制备
- 脊柱骨折护理讲解
- 夏天环卫工安全培训内容课件
- 华为公司培训讲师体系构建
- 汽车金融基础培训课件
- 克雷氏骨折课件
评论
0/150
提交评论